ITP Heat Exchanger

BILT Middle East LLC has prepared an inspections and testing plan for the installation of heat exchangers at the One & Only Royal Mirage Phase III job. The plan outlines material receiving inspections to check for quantity, size compliance and specifications. It also details piping installation checks including verifying the pipe route, fit-up and joining of lines, supporting arrangements, valves and strainer installation, flexible connections, hydro testing, and final inspections. Responsibilities are assigned to BILT and the consultant for witnessing, spot-checking, reviewing or signing off on each item.

Uploaded by

sarmad009
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
242 views1 page

ITP Heat Exchanger

BILT Middle East LLC has prepared an inspections and testing plan for the installation of heat exchangers at the One & Only Royal Mirage Phase III job. The plan outlines material receiving inspections to check for quantity, size compliance and specifications. It also details piping installation checks including verifying the pipe route, fit-up and joining of lines, supporting arrangements, valves and strainer installation, flexible connections, hydro testing, and final inspections. Responsibilities are assigned to BILT and the consultant for witnessing, spot-checking, reviewing or signing off on each item.

Uploaded by

sarmad009
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

BILT MIDDLE EAST LLC

INSPECTIONS AND TESTING PLAN

QUALITY CONTROL AND WORK INSPECTION

JOB: ONE & ONLY ROYAL MIRAGE – PHASE III

ITEM : INSTALLATION OF HEAT EXCHANGERS

SL
DESCRIPTION BME CONSULTANT
NO
Material Receiving Inspections:
a) Quantity, Sizes etc.
1. b) Compliance with specifications and W R /S
approved material submittals.

Piping Installations :
a) Pipe route as per approved coordination W S
drawings.
b) Fit/up and joining of lines/fittings W S/W
including approved supporting
2. arrangements.
c) Valves/strainers installation. R/W W/R
d) Flexible connections for piping W S
e) Hydro Testing of piping system. W S
f) Final installation inspection W W

W– Witness / S --Spot – Checks / R - Review –documents