BOQ Format - Siddhi Camp

This document is a bill of quantities for an office block project. It includes 8 line items with descriptions of materials, units, quantities, and rates. The total amount for all line items is listed at the bottom at NRs. 3,179,692.90. Notes at the bottom provide instructions to refer to attached drawings for calculations and to bid rates using the specified format.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views7 pages

BOQ Format - Siddhi Camp

This document is a bill of quantities for an office block project. It includes 8 line items with descriptions of materials, units, quantities, and rates. The total amount for all line items is listed at the bottom at NRs. 3,179,692.90. Notes at the bottom provide instructions to refer to attached drawings for calculations and to bid rates using the specified format.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Bill Of Quantity

Job : Office Block

SN Description Unit Quantity Rate

1 Steel Structure with UPVC roofing


Supply & Installation of UPVC roof structure
including steel columns, truss, purlin, ridge
cover, gutter all complete as for drawing SQFT 2002 448

Aluminium Door and Window


2 Supply & Installation of aprofile doors and
windows with necessary glass and pannel
all complete as for drawing
a Windows SQFT 400 438
b Doors SQFT 189 593
c Toilet Doors SQFT 42 593
d Ventilations SQFT 3 438
3'' Cement Board for wall with CGI profile
Supply &
3 Installation of 3'' Cement Board with
necessary CGI channel profile for external
wall all complete as for drawing SQFT 2143.9 443

2'' Cement Board for wall with CGI profile


Supply & Installation of 3''
4 Cement Board with necessary CGI channel
profile for internal wall all complete as for
drawing SQFT 1188 297

Red Oxide Paint on Steel Structure


5 Applying red oxide paint on MS steel
works lumpsum 300

Gypsum Board False Ceilling Works


6 Supply & Installation of Gypsum Board False
Ceilling with neat and clean finishing all
complete as for drawing SQFT 2002 95

Paint Works
7 Supply & apply of weather coat emulsion
paint on the surface of the wall and ceilling
with neat and clean finishing all complete
as for drawing SQFT 6663.8 49

Toilet Tiles and Utilities


8 Supply & Install all toilet utilities required in
the toilet i.e. Commode,tap,basin set, tiles,
towel holder, commode spray, soap holder
and all necessary pipe fittings as complete
works as for drawing nos 2 70000
Total Amount in NRs.

Note :
Please refer attached drawings for calculation of required quantities and bid the rate as per this format
Amount Remarks

if cgi used
896,896.00 Rs.616616 308 616616

75mm
Mount
Series or
313497 similar
175200
112077
24906
1314

75mm
sandwich
gorkha
949,747.70 ecopanel 142.9267

50mm
sandwich
gorkha
352,836.00 ecopanel 79.2 222.1267

10000

190190

326526.2 tiles 44825

140000 for two T/B basin


3,179,692.90 commode
tap

nd bid the rate as per this format.

towel
holder
spray
soap
4600
23000
8500 mixer
2400 angle cock
1700 shower

4500

2000

52100
61478
115 1350,18"

SN PARTICULARS SIZE L B H AREA NOS PCS WEIGHT(KG)


1 METAL WORKS
BEAM 3X3X2.2 196.3 1
COL 3X3X2.2 160 1
TRUSS
CHORDS 2X2X2.2 55 4
STRUT 1.5X1.5X2.2 28 4
PURLIN 1.5X1.5X2.2 36 15
DOORS POST 3X1.5X2.2 13 6
EAVES V.POST 3/4*3/4*2.2 0.5 156
EAVES H.POST 3/4*3/4*2.3 156 1

2 ROOF COVERING
UPVC 3.5X16 960.56 1 20 624.673
RIDGES 3.5,18",12" 32.3 1 21.533333