Project Overview:
1
The target project is in Stabile South on the first floor and consists of demolition and new construction. Start by coping
ST01A1 and STCS from the data base into a new file folder on your hard drive.
Open ST01A1. At the opening screen in the dialog box ‘Unresolved References’ select ‘Open Manage Links to correct.
Reload the Core and Shell from the project folder and set the Reference Type to Attachment.
2
Create ‘Assembly’ (select items to include in assembly and review filter can).
Select rooms associated to the Assembly and revise instance parameter ‘Comments’ to read ‘demolished’ (use the filter
can to isolate room selection).
3
Select the Assembly and copy to Clipboard.
Start a new project using the ‘Mayo Project Template’. Save As (to project folder) and rename.
Paste –Align to Current View’ from Clipboard into new project (Existing Floor Plan). Select the Assembly and set the
instance parameters as follows:
Disassemble Assembly
Navigate to database file and open Visibility/Graphics Overrides > Filters (toggle off #Assemblies)
4
Save and Close database file.
Link Database file to New Project File (Insert Tab>Link Revit)(Origin to Origin) and revise type parameters of Link as
shown below:
Navigate to ‘Demolition Floor Plan’ view and open ‘Visibility Graphics Overrides>Revit Links’ and make the following
adjustments to the database link:
5
Navigate to ‘New Const Flr Plan’ – View tab > Scope Box
Create a new Scope Box to define limits of new construction. (Optional) Rename ‘New Const Limits’
Select from the Ribbon>Analyze Tab>Space (add spaces to existing rooms) and select Space Naming
6
7
Start a New Work Order Project