Wingtip Toys Commercial 2

This document is a Gantt chart that outlines the schedule for a Wingtip Toys Commercial 2 project. The project will take 34 days from January 3rd to February 18th and includes three main phases: pre-production lasting 9 days, production lasting 24 days, and post-production lasting 17 days. Pre-production includes developing the script, production boards, picking locations, and holding auditions. Production consists of rehearsing, shooting video, logging footage, and completing production. Post-production focuses on final cut editing, adding final audio, handing off the master copy, and wrapping up by February 18th.

Uploaded by

lutos2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views1 page

Wingtip Toys Commercial 2

This document is a Gantt chart that outlines the schedule for a Wingtip Toys Commercial 2 project. The project will take 34 days from January 3rd to February 18th and includes three main phases: pre-production lasting 9 days, production lasting 24 days, and post-production lasting 17 days. Pre-production includes developing the script, production boards, picking locations, and holding auditions. Production consists of rehearsing, shooting video, logging footage, and completing production. Post-production focuses on final cut editing, adding final audio, handing off the master copy, and wrapping up by February 18th.

Uploaded by

lutos2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID Task Name Duration Start Finish % Comp.

Duration Start Finish % Comp. Jan 2, '05 Jan 9, '05 Jan 16, '05 Jan 23, '05 Jan 30, '05 Feb 6, '05 Feb 13, '05
S SM TWT F S SM TWT F S S MTWT F S SM TWT F S SM TWT F S S MTWT F S SM TWT F S
0 Wingtip Toys Commercial 2 34 days? Mon 1/3/05 Fri 2/18/05 67%
1 Pre-Production 9 days Mon 1/3/05 Thu 1/13/05 99%

2 Develop Script 2.5 days Mon 1/3/05 Wed 1/5/05 100% Garrett R. Vargas,Scott Cooper

3 Develop production boards 3 days Wed 1/5/05 Mon 1/10/05 100% Garrett R. Vargas,Patti Mintz

4 Pick Locations 1 day Mon 1/10/05 Tue 1/11/05 100% Scott Cooper,Patti Mintz,Video Tape[4 30 min. cassette]

5 Hold auditions 2.5 days Tue 1/11/05 Thu 1/13/05 100% Peter Kelly,Scott Cooper,Jonathan Mollerup,Patti Mintz

6 Pre-Production Complete 0 days Thu 1/13/05 Thu 1/13/05 0% 1/13

7 Production 24 days? Mon 1/17/05 Fri 2/18/05 44%

8 Rehearse 3 days Mon 1/17/05 Wed 1/19/05 100%

9 Shoot Video 3 days Thu 1/20/05 Mon 1/24/05 100%

10 Log footage 1 day Tue 1/25/05 Tue 1/25/05 0%

11 Production Complete 0 days Tue 1/25/05 Tue 1/25/05 0% 1/25

12 Post-Production 17 days? Wed 1/26/05 Fri 2/18/05 0%

13 Final cut Edit 2 days Wed 1/26/05 Thu 1/27/05 0%

14 Add Final Audio 1 day Wed 1/26/05 Wed 1/26/05 0%

15 Hand off Master Copy 4 hrs Thu 1/27/05 Thu 1/27/05 0%

16

17

18

19

20

21

22

23

24

25

26

27 3 days? Wed 2/16/05 Fri 2/18/05 0%

Task Milestone External Tasks


Project: Wingtip Toys Commercial 2
Date: Wed 6/4/14 Split Summary External Milestone

Progress Project Summary Deadline

Page 1