Practice ITTOs
Practice ITTOs
Initatng
Planning
Close Project/Phase
Closing
Planning
Collect requirements
Planning
Define Scope
Scope
Planning
Create WBS
Planning
Validate Scope
Control scope
Planning
Define Activities
Planning
Sequence Activities
Planning
Planning
Planning
Develop Schedule
Planning
Planning
Control Schedule
Estimate Costs
Planning
Determine Budget
Cost
Planning
Control Budget
Planning
Executng
Quality
Executng
Control Quality
Project Charter
Change Request, Deliverables, Work Performance Data, Prj Document Updates, Prj Plan updates
Change Request, Work Performance Reports, Prj Document updates, Prj Plan updates
Approved Changes, Prj Document Updates, Prj Plan updates, Change log
Requirement Documentation
Requirement Traceability Matrix
Scope Baseline
Project Document udpates
Change Request , Prj Document updates, Work performance Information, accepted deliverables
Change Request, Prj Document Updates, prj Pan Updates, OPA updates, Work performance information
Activity list
Activity attributes
Milestone list
Project Schedule
Schedule Baseline
Schedule Data
Project Calendar
Prj Document Updates
Prj plan updates
Change request, Schedule forecast, Prj Document update, prj plan update, work performance information, opa update
Cost Baseline
Prj Document Updates
Prj Funding requirements
Change Request , cost forcasts, work performance information, prj document updates, prj plan updates , opa updates
Expert Judgment
Facitilaion techniques
Expert Judgment
Facitilaion techniques
Expert Judgment
Meetings
PMIS
Expert Judgment
Analytical Techniques
PMIS
Meetings
Expert Judgment
Change Control Tools
Meetings
Expert Judgment
Analytical Techniques
Meetings
Expert Judgment
Meetings
Focus Groups
Interviews
Facitilated Workshops
Grp Creativity Techniques
Grp Decision Making Techniques
Benchmarking
Questionnaries & Surveys
Prototypes
Observaions
Context Diagrams
Document Analysis
Product Analysis
Alternate Generation
Expert Judgment
Facitilated Workshops
Decomposition
Expert Judgment
Inspecton
Grp Decision Making Techniques
Variance Analysis
Expert Judgment
Analytical Techniques
Meetngs
Decomposition
Expert Judgment
Rolling Wave Planning
Analogous Esimating
Parametric Estimating
Three Pt Estimating
Expert Judgment
Grp Decision Making Techniques
Reserve Analysis
Project Charter
Change Request, Work Performance Information, Prj Document Updates , Prj Plan Updates
Requirement Documentation
Requirement Traceability Matrix
Project Scope Statement
Prj Document Updates
Scope Baseline
Prj Document Updates
Accepted Deliverables
Change Request
Work Performance information, Prj Document Updates
Change request, Work Performance information, Prj Document update, prj plan update, OPA update
Activity list
Activity attributes
Milestone list
Project Schedule
Schedule Data
Schedule Baseline
Project Calendar
Prj Document Update
Prj Plan updates
Schedule forecast, Change request, work performance info, Prj document update, prj plan update, opa update
Knowledge
Process Area Process Grp Input
Area
Develop Project Charter Business Case
Projet Statement of Work
Initatng Agreements
Enterprise Environmental Factors
Organizational Process Assets
Develop Project Management Plan Project Charter
Outputs from other processes
Planning
Enterprise Environmental Factors
Organizational Process Assets
Diret & Manage Project Work Project Management Plan
Approved Change Request
Executng
Organizational Process Assets
Integarton
Resource Calendar
prj scope statement
Planning
activity resource requirement
resource breakdown structure
T
Planning
Risk Register
Organizational Process Assets
Enterprise Environmental Factors
develop schedule Schedule Management Plan
Activity list
Activity attributes
Resource Calendar
prj scope statement
activity resource requirement
Planning activity duration estimate
resource breakdown structure
project schedule network diagram
project staff assignments
Organizational Process Assets
Risk Register
Enterprise Environmental Factors
control schedule Project Management Plan
project schedule
project calendar
Monitoring & Controlling schedule data
Organizational Process Assets
Work Performance Data
Planning
Expert Judgment
Facitilation techniques
Expert Judgment
Facitilation techniques
Expert Judgment
Meetings
PMIS
Expert Judgment
Meetings
PMIS
Analytical Techniques
Expert Judgment
Meetings
Change Control tools
Expert Judgment
Meetings
Analytical Techniques
Expert Judgment
Meetings
Focus Groups
Inerviews
Facitilated Workshops
Grp Creativity techniques
Grp Decision Making techniques
Observation
Prototypes
Benchmarking
Context Diagrams
Questionnaries & Surveys
Document Analysis
Facitilated Workshops
Product Analaysis
Alternate generation
Expert Judgment
Decomposition
Expert Judgment
Inspection
Grp Decision Making techniques
Variance Analysis
Expert Judgment
Analytical Techniques
Meetings
Decomposition
Expert Judgment
Rolling Wave Planning
Bottom up estimating
Expert Judgment
Published Data Estimating
prj management software
Alternate analysis
parameric estimating
analogous estimating
three pt esimating
reserve analysis
Expert Judgment
Grp Decision Making techniques
schedule network analysis
critical path method
critical chain method
scheduling tool
schedule compression
modeling technique
Leads & lags
resource optimization technique
scheduling tool
scheduling compression
modeling technique
Leads & lags
resource optimization technique
performance reviews
prj management software
Expert Judgment
Analytical Techniques
Meetings
analogous estimating
parametric estimating
three pt esimating
Bottom up estimating
reserve analysis
prj management software
Expert Judgment
Vendor Bid Analysis
Cost of Quality
Grp Decision Making techniques
Cost Aggregation
Expert Judgment
Historical relationship
Funding limit reconcilation
Reserve Analysis
EVM
TCPI
Forecasting
performance reviews
reserve analysis
prj management software
Cost Benefit Analysis
Cost of Quality
Seven Basic Quality tools
Benchmarking
Additional Quality planning tools
Statistical sampling
Design of experiments
Meetngs
Quality Audits
Process Analysis
Quality Management & Control tools
Expert Judgment
Analytical Techniques
Meetings
Documentation reviews
Info Gathering Technique
SWOT analysis
Assumption analysis
Checklist analysis
Diagramming technique
Expert Judgment
Risk Audit
Risk reassessment
Variance & Trend analysis
Technical performance measurement
Meetings
reserve analysis
Output
Project charter
Deliverables, change request, Work performance Data, Doc update, Plan update
Work performance Reports, Change request, Prj Doc update, Prj plan update
Change log, accepted change request, Prj doc update, Prj plan update
Requirement Documentation
Requirement Traceability Matrix
Accepeted Deliverables
Work Performance Info
Change Request
Prj Document Updates
Change request
Work Performance Info
Prj Document Updates
Prj Plan updates
OPA update
Schedule Management Plan
Activity list
Activity attributes
Milestone list
Change Request
work performance info
schedule forecasts
Prj Document Updates
Prj Plan updates
OPA update
Cost Baseline
Project Funding Requirement
Prj Document Updates
Cost forecasts
Change Request
work performance info
OPA update
Prj Plan updates
Prj Document Updates
Quality Management Plan
Process Improvement Plan
Quality Metrics
Quality Checklists
Prj Document Updates
Change Request
Prj Plan updates
Prj Document Updates
OPA update
Validated Changes
Validated Deliverables
Change Request
Prj Plan updates
Prj Document Updates
OPA update
Work Performance Info
Quality control measurements
HR Management Plan
Change request
Prj Plan updates
Prj Document Updates
OPA update
EEF Updates
Communication Management Plan
Prj Document Updates
Project Communication
Prj Document Updates
Prj Plan updates
OPA update
Change Request
Work Performance Info
OPA update
Prj Plan updates
Prj Document Updates
Risk Management Plan
Risk Register
Planning
Cost
Basis of estimates
Risk Register
Planning Resource Calendar
Organisational Process Assets
Enterprise Environmental factors
Scope Baseline
Expert Judgment
Facitilation Techniques
Expert Judgment
Facitilation Techniques
Expert Judgment
Meetings
PMIS
Expert Judgment
Meetings
PMIS
Analytical Techniques
Expert Judgment
Meetings
Analytical Techniques
Expert Judgment
Meetings
Focus Groups
Interviews
Grp Creativity techniques
Grp Decsion making techniques
Facitilated Workshops
Questionnaries & Surveys
Observations
Prototypes
Benchmarking
Context Diagrams
Document Analysis
Product Analysis
Facitilated Workshops
Alternate Generation
Expert Judgment
Decomposition
Expert Judgment
Inspection
Grp Decsion making techniques
Variance Analysis
Expert Judgment
Analytical Techniques
Meetings
Decomposition
Expert Judgment
Rolling Wave Planning
Parametric estimating
Analogous esimating
three pt estimating
Expert Judgment
Prj Management Software
scheduling tool
schedule compression
modeling technique
resource optimization technique
Leads & lags
performance reviews
Prj Management Software
Expert Judgment
Analytical Techniques
Meetings
Cost of quality
Parametric estimating
Analogous esimating
Bottom Up estimating
three pt estimating
Benchmarking
Expert Judgment
Prj Management Software
Cost aggregation
Expert Judgment
Historical relationship
Fuding limit reconcilation
Reserve Analysis
performance reviews
Prj Management Software
Reserve Analysis
Inspection
Seven Basic Quality tools
Statistical sampling
Meetings
Output
Project Charter
Deliverables
Change Request
Work performance data, prj doc update, prj plan update
Change Request
Work performance information
Prj doc updates
prj plan updates
Requirement Documentation
Requirement Traceability Matrix
Project Scope Statement
Prj doc updates
Scope Baseline
Prj doc updates
Accepted Deliverabes
Change request
Work performance information
prj plan updates
Prj doc updates
Change Request
Work performance information
prj plan updates
Prj doc updates
OPA update
Schedule Management Plan
Activity list
Activity attributes
Milestone list
Project Schedule
Schedule Baseline
Schedule Data
Project calendar
Prj doc updates
prj plan updates
change request
Work performance information
Prj doc updates
prj plan updates
OPA update
Cost Baseline
Prj funding requirement
Prj doc updates
Change request
Work performance information
prj plan updates
Prj doc updates
OPA update
Change requests
Work performance information
prj plan updates
Prj doc updates
OPA update
Knowledge
Process Area Process Grp Input
Area
Develop Project Charter Business Case
Agreements
Initatng Project SOW
Organizational Process Assets
Enterprise Environmental Factors
Develop project Managemen Plan Prj Charter
Outputs from other processes
Planning
Organizational Process Assets
Enterprise Environmental Factors
Direct & Manage Project Work Prj Management plan
Enterprise Environmental Factors
Executng
Organizational Process Assets
Integarton
Planning
Cost
Activity cost estimates
basis of estimate
Planning Resource calendar
Scope Baseline
Agreements
Risk Register
Executng
Human resources
Project staff assignments
Resource Calendar
Executng
Planning
make-or-buy decision
Executng
source selection criteria
project documents
Organizational Process Assets
seller proposals
Control procurement Prj Management plan
Expert Judgment
Facitilation Technique
Expert Judgment
Facitilation Technique
Expert Judgment
Meetings
PMIS
Expert Judgment
Analytical techniques
PMIS
Meetings
Expert Judgment
Analytical techniques
Meetings
Expert Judgment
Meetings
Focus Groups
Interviews
Grp Decision making techniques
Grp Creativity techniques
Questionnaries & Surveys
Observations
Benchmarking
Documentation Analysis
Prototypes
Context Diagrams
Facitilated Workshops
Product Analysis
Alternate generation
Facitilated Workshops
Expert Judgment
Decomposition
Expert Judgment
Inspection
Grp Decision making techniques
Variance Analysis
Expert Judgment
Analytical techniques
Meetings
Expert Judgment
Decomposition
Rolling Wave Planning
Bottom up estimating
Published estimating data
Expert Judgment
prj management software
Alternate analysis
Parametric estimating
Analogous estimating
three pt estimating
Grp Decision making techniques
Expert Judgment
reserve analysis
Scheduling tool
schedule compression
modeling technique
Leads & Lags
Resource optimization technique
Performance reviews
prj management software
Expert Judgment
Analytical techniques
Meetings
Parametric estimating
three pt estimating
Bottom up estimating
Analogous estimating
Expert Judgment
Grp Decision making techniques
reserve analysis
prj management software
Cost of quality
Vendor bid analysis
Expert Judgment
Historical relationship
reserve analysis
Funding limit reconcilation
Cost aggregaton
reserve analysis
forcasting
EVM
TCPI
Performance reviews
prj management software
Cost of quality
seven basic quality tools
Benchmarking
Design of experiments
Additional quality planning tools
Meetngs
Statistical sampling
cost benefit analysis
Quality management & control tools
Process analysis
Quality Audits
Expert Judgment
Analytical techniques
Meetings
Risk Audit
Risk reassessment
Variance & trend analysis
Technical performance measurement
reserve analysis
Meetngs
Expert Judgment
Make-or-buy analysis
Meetings
Market research
bidder conference
Analytical techniques
Proposal evaluation technique
Independent estmates
Procurement negotations
Expert Judgment
Advertsing
Expert Judgment
Meetings
Analytical techniques
Management skills
Interpersonal skills
Communicaion methods
Prj Charter
Deliverables
Change Request
Work performance Data
Prj Plan updates, prj doc updates
Work performance reports
Change Request
Prj Plan updates, prj doc updates
Change log
Approved Change requests
Prj Plan updates, prj doc updates
Requirement Documentation
Requirement Traceability Matrix
Project Scope Statement
Prj Doc update
Scope Baseline
Prj Doc update
Accepted Deliverables
Change Request
prj doc updates
Work Performance Information
Activity list
Activity attributes
Milestone list
Project Schedule
Schedule Data
Schedule Baseline
Project Calendar
Prj Plan updates, prj doc updates
Change Request
Prj Plan updates, prj doc updates
OPA update
Work Performance Information
Schedule forecasts
Cost Baseline
Prj funding requirement
prj doc update
Cost forecasts
Change request
Prj Plan updates, prj doc updates
Work Performance Information
OPA update
Validated deliverables
validated changes
Change Request
prj plan update
prj doc update
Work Performance Information
OPA update
Quality control measurements
HR Management plan
Change request
prj doc update
prj plan update
OPA update
EEF update
Change request
Work Performance Information
OPA update
Prj doc update
prj plan update
Risk Management Plan
Risk register
Prj doc updates
Closed procurements
OPA update
Stakeholder register
Expert Judgment
Facitilation Technique
Expert Judgment
Facitilation Technique
Expert Judgment
PMIS
Meetings
Expert Judgment
Analytical Techniques
Meetings
PMIS
Expert Judgment
Analytical Techniques
Meetings
Expert Judgment
Meetings
Focus Groups
Interviews
Facitilated Workshops
Grp Creativity techniques
Grp Decision making techniques
Benchmarking
Questionnaries & Surveys
Observations
Prototypes
Context Diagrams
Document Analysis
Product Analysis
Alternate Generation
Facitilated Workshops
Meetings
Decomposition
Expert Judgment
Inspection
Grp Decision making techniques
Variance Analysis
Expert Judgment
Analytical Techniques
Meetings
Decomposition
Expert Judgment
Rolling Wave Planning
Bottom up estimating
published estimating data
Alternate analysis
Expert Judgment
Parametric Estimating
Three pt estimating
Analogous estimating
Expert Judgment
Reserve Analysis
Performance reviews
Scheduling tool
Schedule compression
Resource optimization technique
Leads & lags
Modeling technique
Prj management software
Expert Judgment
Meetings
Analytical Techniques
Parametric Estimating
Bottom up estimating
Analogous estimating
Three pt estimating
Reserve Analysis
Grp Decision making techniques
Output
Project Charter
Change Request
Deliverables
Prj Doc Update , Prj Plan update
Work Performance Data
Change Request
Work performance report
Prj doc update
prj plan update
Change log
Accepted Change request
Prj doc update
prj plan update
OPA Update
Final Product, service or result
OPA Update
Requirement Documentation
Requirement traceability Matrix
Project Scope Statement
Prj Doc updates
Scope Baseline
Prj Doc updates
Accepted Deliverables
Change Request
Prj Doc updates
Work performance Info
Change Request
Prj plan update
prj doc update
Work performance Info
OPA Update
Schedule Management Plan
Activity list
Activity attributes
Milestone list
Project Schedule
Schedule Baseline
Schedule Data
Project Calendar
Prj Doc update
prj plan update
Schedule forecast
Prj plan update
prj doc update
OPA Update
Change request
Work performance info
Project Schedule
HR Management Plan
Planning
Scope Baseline
Organizaional Process Assets
Enterprise Environmental Factors
Cost
Planning
Cost
Basis of estimate
Risk Register
Planning Resource Calendar
Scope Baseline
Organizaional Process Assets
Proejct Schedule
Agreements
Control Costs Project Management Plan
Project Funding requirement
Work performance data
Monitoring & Controlling
Organizaional Process Assets
Executng
Human resource
project staff assignments
Resource Calendar
Executng
Planning
Expert Judgment
Facitilation technique
Expert Judgment
Facitilation technique
Expert Judgment
Meetings
PMIS
Expert Judgment
Meetings
PMIS
Analytical Techniques
Expert Judgment
Analytical Techniques
Meetings
Expert Judgment
Meetings
Focus Groups
Interviews
Facitilated Workshops
Grp Creativity techniques
Grp Decisionmaking techniques
Benchmarking
Prototypes
Observation
Questionnaier & Surveys
Context Diagrams
Document Analysis
Facitilated Workshops
Product Analysis
Alternate generation
Expert Judgment
Decomposition
Expert Judgment
Inspection
Grp Decisionmaking techniques
Variance Analysis
Expert Judgment
Meetings
Analytical Techniques
Decomposition
Expert Judgment
Rolling Wave Planning
PDM
Leads & Lags
Dependency Determination
Three pt estimating
Analogous estimating
Paramteric estimating
Expert Judgment
reserve analysis
Grp Decisionmaking techniques
scheduling tool
schedule compression
modeling technique
Leads & Lags
resource optimzation technique
Performance reviews
Prj management software
Expert Judgment
Meetings
Analytical Techniques
Analogous estimating
Three pt estimating
Bottom up estimating
Paramteric estimating
Expert Judgment
Reserve analysis
Prj management software
Grp Decisionmaking techniques
Cost of quality
Vendor Bid Analysis
Cost aggregation
Historical relationship
Funding limit reconcilation
Expert Judgment
reserve analysis
reserve analysis
EVM
TCPI
Performance reviews
Prj management software
forecastng
Cost benefit analysis
Cost of quality
Seven basic quality tools
Benchmarking
additional quality planning tools
Design of expermients
Meetings
Statistical sampling
Quality Audits
Process Analysis
Quality management & conrol tools
Inspection
Statistical sampling
Seven basic quality tools
Approved change request review
Communication technology
Communication models
Communication methods
Communication requirement Analysis
Meetings
Communication technology
Communication methods
communication models
Informaton management system
performance reportng
Expert Judgment
Meetings
Information management system
Expert Judgment
Meetings
Analytical Techniques
Risk reassessment
Risk Audit
Variance & trend analysis
Technical performance measurement
reserve analysis
Meetings
Expert Judgment
Make-or-buy analysis
Meetings
market research
Bidder Conference
proposal evaluation technique
Independent estimates
Advertising
Procurement Negotation
Expert Judgment
Analytcal Techniques
Expert Judgment
Analytical Techniques
Meetings
Communication methods
Interpersonal Skills
Management skills
Expert Judgment
Meetings
Information management system
Output
Project Charter
Requirement Documentation
Requirement Traceability Matrix
Project Scope Statement
prj doc update
Scope Baseline
prj doc update
Accepeted Deliverables
Change Request
Prj Doc updates
Work performance Information
Change Request
Prj plan update
prj doc update
Work performance Information
OPA Update
Schedule Management Plan
Activity list
Activity attributes
Milestone list
Project Schedule
Schedule baseline
schedule data
project calendar
prj doc update
prj plan update
Schedule forecast
change request
prj doc update
Work performance Information
prj plan update
OPA Update
Cost Baseline
Prj funding requirements
prj doc update
Cost forcasts
Change Request
Work performance Information
prj doc update
Prj plan update
OPA Update
Quality management plan
Quality metrics
Quality checklists
process improvement plan
prj doc updates
change request
Work performance Information
prj doc update
prj plan update
OPA Update
Validated changes
Quality control measurements
Validated deliverables
HR Management plan
Change request
Prj plan update
prj doc update
OPA Update
EEF update
OPA update
Prj doc update
Project communicatons
prj plan update
Change request
prj doc update
prj plan update
Work performance Information
OPA Update
Risk Management Plan
Risk Register
Prj doc updates
change request
Work performance Information
prj doc update
prj plan update
OPA Update
Change request
prj plan update
prj doc update
Work performance Information
OPA update
Closed Procurements
OPA Update
Stakeholder register