Power System Analysis: Merger Test
Power System Analysis: Merger Test
Sitemap
[email protected]
+2348-053-900-000
Search...
Search
Menu
Home
Testing
http://www.tyronpowerservices.com/?p=2364 1/8
5/19/2018 Power System Analysis
specifications
Power
are being
Systemmet
Analysis
and uncover underlying problems that might cause particular systems to
not be up toArc
par.
Flash
TheAnalysis
expert’s at TPS will perform a power quality audit on each particular system by:
Power Plant Services
Assessing power quality throughout facility
Electrical Consultants
Identify harmful power problems that can infect data and hardware.
Electrical Repair
Provide ways and options to correct potential threats to the health of valuable equipment
Circuit Breaker Repair
Determine if existing power infrastructure capacity is being approached or can accommodate
Automatic Transfer Switch
planned growth
Installations
Protective Relay Coordination
Transformer Rigging And Moving
Transformer Assembly, Installation & Commissioning
Relay Process
and coordination studies pinpoint traits of circuit breakers, fuses, and relays used for protection
within a power system.
Service They
Project help Form
Inquiry identify potential problems and hazards that might arise with faulty
equipment and
Contact Usdamaged electrical connections that can lead to broken lines, outages, and ultimately
building shutdowns. The purpose of relay and coordination is to limit potential hazards to personnel
and equipment.
Harmonics
Fundamental harmonic frequency consists of 60 hertz. Any distortion from the fundamental frequency
will be equal to the product of the fundamental frequency multiplied by an integer. For example, the
second harmonic distortion is 120 hertz or (60hertz x 2). Harmonic power system studies look to
determine the existence of harmonic distortions within the system as designed by IEEE (Institute of
Electrical and Electronic Engineers). The study consists of harmonic distortion data collection and
analysis of the data in order to design solutions and recommendations to fix the problem. A typical
solution would be installing a harmonic filter bank to help regulate frequency and prevent
unnecessary distortions.
performed by the circuit at a specified time. Loads with lower power factors draws more current than
loads with a higher power factor since more energy is loss through transmission of the current
through lower power factors. In turn, it is more costly to run current at a lower power factor since it
requires more current, larger wires to accommodate the current, and more energy dissipated through
heat loss. TPS’s team of expert technician and engineers will determine the ideal power factor for
your distinct system and take preventative measures to ensure smooth flow, decrease system losses,
and minimal differences between real power and apparent power in the circuit.
Motor Starting
Motor starting studies are used to verify the power of the motor at the start along with the input
voltage and current. Furthermore, motor starting studies help determine the amount of time required
before a motor is going at full capacity.
Data Collection
Power System Modeling
http://www.tyronpowerservices.com/?p=2364 3/8
5/19/2018 Power System Analysis
See more
http://www.tyronpowerservices.com/?p=2364 4/8
5/19/2018 Power System Analysis
Home
Testing
Merger Test
Switchgear Testing
Power Transformer Testing
Neta Testing
Power Cable Testing
Circuit Breaker Testing
Protective Relay Testing
Generator Testing
Instrument Testing
Hi Pot Testing
Fall of Potential Ground Test
SF6 Circuit Breaker Testing
Ground Fault Testing
High Voltage Testing
Maintenance
Substation Maintenance Services
Transformer Maintenance
Switchgear Maintenance
Circuit Breaker Maintenance
SF6 Maintenance
http://www.tyronpowerservices.com/?p=2364 5/8
5/19/2018 Power System Analysis
Neta Maintenance
Other Services
Power System Analysis
Arc Flash Analysis
Power Plant Services
Electrical Consultants
Electrical Repair
Circuit Breaker Repair
Automatic Transfer Switch
Installations
Transformer Rigging And Moving
Transformer Assembly, Installation & Commissioning
Process
Service Project Inquiry Form
Contact Us
Report
Map data a map
©2018 error
Google
Testing Services
Circuit Breaker Testing
Fall of Potential Ground Test
Generator Testing
High Voltage Testing
http://www.tyronpowerservices.com/?p=2364 6/8
5/19/2018 Power System Analysis
Instrument Testing
Power Cable Testing
Neta Testing
Maintenance Services
SF6 Circuit Breaker Maintenance
Switchgear Maintenance
Circuit Breaker Maintenance
Neta Maintenance
Transformer Maintenance
Substation Maintenance Services
Contact Us
Tyron Power Servicesr
Tyron Ultra Applications Limited
400 Gbazango Extension,
Along Arab Road,
Kubwa Abuja
Nigeria
Phone +2348-053-900-000
Fax +2348-053-900-000
Home
Testing Services
Careers
Contact Us
http://www.tyronpowerservices.com/?p=2364 7/8
5/19/2018 Power System Analysis
Back to Top
http://www.tyronpowerservices.com/?p=2364 8/8