0% found this document useful (0 votes)
365 views5 pages

Ded STR Pondasi at Garden Hotel

pondasi merupakan bagian struktur yang berpengaruh sangat penting untuk kekuatan struktur pada gedung at. garden hotel

Uploaded by

FahrulRozi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
365 views5 pages

Ded STR Pondasi at Garden Hotel

pondasi merupakan bagian struktur yang berpengaruh sangat penting untuk kekuatan struktur pada gedung at. garden hotel

Uploaded by

FahrulRozi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

P2

P2
P4

P4
PEMBANGUNAN

9
32.80

at. GARDEN HOTEL

7.20
Jl. KH. Abdul Halim No. 38 Kel. Munjul
Kec. Majalengka - Majalengka

1. Ir. ZAINAL ARIFIN

P3

P3
P1

P1
(arsitektur dan landscape)
8

25.60
2. FAHRUL ROZI, ST.
(struktur)

MANUNGGAL UTAMA
3. FINDRATAMA, ST.
(interior)
7.20

4. (contact person )
7 7'

22.01
- 081312222883

P4

P4
P3
20.70
P3
P6

P3

P2
P1

P1

P1

P1
28.80
6

18.40
P6
5' 5''

7.20

14.80
P6

P3

P3

P2
P4
13.85

Cipta
P3

P3

P4
P3
P6

P1

P1

P1

P1
5

11.20

P4
P5 P4
3 3' 4

8.90
CV. CIPTA

P5

P5

P4
MANUNGGAL UTAMA
7.20

7.60

P5

P5
P4
6.40
MUHAMAD ARIFIN, ST.
Direktur
P4

P3
P2

P2
2

4.00
3.97
1'

1.40

P5
P5
P5
P5
P5
P5

0.00
1

HANDY SUMANTRI
Owner
3.90 2.30 7.20 2.30 4.90 7.20 1.20 6.00 1.20 4.20

7.20 7.20 5.40


Skala Tanggal

D'
H'

E'
G
F'

B
C
J'

D
H

A
K

E
F
I
J

1:--- Agustus 2017


40.40

37.40

36.50

34.20

29.40

27.00

24.70

23.40

19.80

16.20

12.60

11.40

9.00

5.40

4.20

0.00
Kode Gbr. No. Lbr. Jml. Lbr.

A3-1.0
DENAH PONDASI STR 01 ---
Skala: 1:150
PEMBANGUNAN
at. GARDEN HOTEL

Jl. KH. Abdul Halim No. 38 Kel. Munjul


Kec. Majalengka - Majalengka

1. Ir. ZAINAL ARIFIN


(arsitektur dan landscape)

± 0.00 ± 0.00 2. FAHRUL ROZI, ST.


± 0.00 (struktur)

MANUNGGAL UTAMA
3. FINDRATAMA, ST.
(interior)

- 0.40 4. (contact person )


Tulangan Arah Y Tulangan Arah Y - 081312222883

25
10 - Ø 16 10 - Ø 16

- 0.65

Tulangan Arah X Tulangan Arah X


19

10 - Ø 19 10 - Ø 19
19

Tulangan Susut Tulangan Susut


90

MUTU BETON K 300 Ø 13-150 mm 3 - Ø 13


19
19

17 17 17 17 17 17 17 17 17 5 - 1.60

170

POTONGAN POLE CAP Prestressed Concrete Spun Piles


Tulangan Arah Y
D 300 Mm EX-WIKA Kelas -C

Cipta
10 - Ø 19
18
18

CV. CIPTA
MANUNGGAL UTAMA
18
18

Tulangan Arah Y
18

10 - Ø16 - 6.40 MUHAMAD ARIFIN, ST.


25 30 15 30 15 30 25 Direktur
18

25 30 15 30 15 30 25
18

25
18

Y
30
18

18 18 18 18 18 18 18 18 18
15

HANDY SUMANTRI

170
30

DENAH PENULANGAN PILE CAP


Owner
Prestressed Concrete Spun Piles
15

D 300 Mm EX-WIKA Kelas -C


Skala Tanggal
30

1 : 25 Agustus 2017

Y
25

40 90 40
Kode Gbr. No. Lbr. Jml. Lbr.
X
A3-1.0
DETAIL PONDASI TYPE P1 170
STR 20 ---
Skala: 1:25
PEMBANGUNAN
at. GARDEN HOTEL

Jl. KH. Abdul Halim No. 38 Kel. Munjul


Kec. Majalengka - Majalengka

1. Ir. ZAINAL ARIFIN


(arsitektur dan landscape)

2. FAHRUL ROZI, ST.


± 0.00 ± 0.00 (struktur)

MANUNGGAL UTAMA
± 0.00
3. FINDRATAMA, ST.
(interior)

4. (contact person )
- 0.40 - 081312222883
Tulangan Arah Y Tulangan Arah Y

25
8 - Ø 16 8 - Ø 16

- 0.65

Tulangan Arah X Tulangan Arah X


18

10 - Ø 19 10 - Ø 19

Tulangan Susut Tulangan Susut


70

70
18

MUTU BETON K 300


Ø 13-150 mm 2 - Ø 13
18

- 1.35

55
18 18 18 18 18 18 18

POTONGAN POLE CAP


Prestressed Concrete Spun Piles
D 300 Mm EX-WIKA Kelas -C
Tulangan Arah Y
8 - Ø 16

Cipta
56 47 56
14
14
14

CV. CIPTA
98

98

MANUNGGAL UTAMA
14

Tulangan Arah X
10-Ø19
14

- 6.40

30 30 30 MUHAMAD ARIFIN, ST.


Direktur
56 47 56
41

41

Y
17

18 18 18 18 18
X
30

24 113 24
82

82

98
DENAH PENULANGAN PILE CAP
41

Prestressed Concrete Spun Piles


D 300 Mm EX-WIKA Kelas -C
HANDY SUMANTRI
Owner
30

17
17
Skala Tanggal
41
Y
21

1 : 25 Agustus 2017
82
24
X 113 24

Kode Gbr. No. Lbr. Jml. Lbr.

A3-1.0
DETAIL PONDASI TYPE P2 STR 21 ---
Skala: 1:25
PEMBANGUNAN
at. GARDEN HOTEL

Jl. KH. Abdul Halim No. 38 Kel. Munjul


Kec. Majalengka - Majalengka

1. Ir. ZAINAL ARIFIN


(arsitektur dan landscape)

2. FAHRUL ROZI, ST.


(struktur)
± 0.00 ± 0.00

MANUNGGAL UTAMA
3. FINDRATAMA, ST.
(interior)
Tulangan Arah Y Tulangan Arah Y
7 - Ø 13 5-Ø 13 4. (contact person )
- 0.40 - 0.40 - 081312222883
- 0.45 - 0.45
14

Tulangan Arah X Tulangan Arah X Tulangan Arah X Tulangan Arah X


5 - Ø 16 5 Ø 16 5-Ø 16 5-Ø 16
Tulangan Susut Tulangan Susut Tulangan Susut Tulangan Susut
60

60

60
15

MUTU BETON K 300 MUTU BETON K 300


Ø 12-150 mm Ø 12-150 mm 2-Ø 12 2-Ø 12
14

- 1.05 - 1.05
55

17 20 20 20 20 17 70
130 Tulangan Arah X Tulangan Arah Y
7 - Ø 13 POTONGAN POLE CAP 5-Ø 13
POTONGAN POLE CAP Tulangan Arah Y
Tulangan Arah Y
5-Ø 13
7- Ø 13
Prestressed Concrete Spun Piles Prestressed Concrete Spun Piles
D 300 Mm EX-WIKA Kelas -C D 300 Mm EX-WIKA Kelas -C

5
15
5

15
15

Tulangan Arah X

Cipta
70
5-Ø16

15
15

Tulangan Arah X
70

5 - Ø16

5 15
15

Y
5 15

5 15 15 15 15 5
Y 70
X
5 20 20 20 20 20 20 5
DENAH PENULANGAN PILE CAP
130 CV. CIPTA
X MANUNGGAL UTAMA
- 6.40 30 30 30 - 6.40

DENAH PENULANGAN PILE CAP 60


70

Prestressed Concrete Spun Piles MUHAMAD ARIFIN, ST.


D 300 Mm EX-WIKA Kelas -C
Prestressed Concrete Spun Piles Direktur

35
D 300 Mm EX-WIKA Kelas -C
70

70
Y

35
Y

20 30 30 30 20
X 130 35 35
X

HANDY SUMANTRI
Owner

Skala Tanggal
A3-1.0
DETAIL PONDASI TYPE P3 A3-1.0
DETAIL PONDASI TYPE P4 1 : 25 Agustus 2017
Skala: 1:25 Skala: 1:25

Kode Gbr. No. Lbr. Jml. Lbr.

STR 22 ---
PEMBANGUNAN
at. GARDEN HOTEL

Jl. KH. Abdul Halim No. 38 Kel. Munjul


Kec. Majalengka - Majalengka

40 30

1. Ir. ZAINAL ARIFIN


(arsitektur dan landscape)

2. FAHRUL ROZI, ST.


(struktur)

MANUNGGAL UTAMA
3. FINDRATAMA, ST.
± 0.00 ± 0.00 (interior)
±0.00 ±0.00
4. (contact person )
- 0.15 - 0.15 - 081312222883
40

40
- 0.40 - 0.40

4-Ø16 4-Ø16

6-Ø12 4-Ø12

95
105

Ø10-15 Ø10-15

- 1.35
- 1.45 Ø12-15

30
Ø12-15 Ø13-15
Plat Pondasi Telapak 120x120x40

Cipta
40

5
- 1.70
Ø16-15
- 1.85 Lantai Kerja 1:3:5
5

- 1.90

∅12 - 15

80
15
CV. CIPTA
MANUNGGAL UTAMA

∅13 - 15
∅12 - 15

120
20

40 MUHAMAD ARIFIN, ST.


80 Direktur

∅16 - 15

40
120

HANDY SUMANTRI
Owner

Skala Tanggal
DETAIL PONDASI TYPE P5 A3-1.0
DETAIL PONDASI TYPE P6
A3-1.0 Skala: 1:25 1 : 25 Agustus 2017
Skala: 1:25

Kode Gbr. No. Lbr. Jml. Lbr.

STR 23 ---

You might also like