Control of Changes
Control of Changes
Control of Changes
Version 3
April 05, 2018
NOTICE: This document is confidential and may not be used without permission
from QMI.
Approved Version
4/5/2018
RAM BIR
Author Date
TABLE OF CONTENTS
1. TARGET OF THE PROCEDURE ............................................................................................3
3. REFERENCES.......................................................................................................................3
5. RELEVANT REGULATIONS..................................................................................................3
Approved Version
8. RECORD RETENTION..........................................................................................................8
9. ANNEXES............................................................................................................................8
2. Application’s area
This procedure is applicable to all sites of SMR North India.
3. References
QWINN-MAN-8.5.6-001-Rxx-Change Point Control Matrix
QWINN-MAN-8.5.6-004-Rxx-Abnormal Situation flow chart
Approved Version
5. Relevant Regulations
NA
6. List of Abbreviations
AWR – As & When Required
ECN – Engineering Change Note
7. Process Description
In SMR, four types of changes will occurs:
1. Engineering changes – changes that will be done in drawing / specifications during NPD and mass
production. All the engineering changes will be implemented as described in section 7.1.
Approved Version
2 Fill all the details in "ECR" format and provide the same to Engineering department All Concerned
Receiving the Change request from concerned department or customer and enter the details
3 Engg.
in QFINN-ENG-8.5.6-003-Rxx-ECN LOG BOOK.
4 Inform the CFT about the same and call the ECN Meeting Engg.
Conduct the feasibility review (Review changes and drawing thoroughly). If request is from CFT
customer then review application timing, compensation for tooling & part and cost impact
5
and inform customer about the review result.
If not feasible, close the request and inform the customer or requester about the same Engg.
6 If feasible, conduct risk analysis including product homologation CFT
If High Risk or any cost impact, Inform mgmt. (For internal request) or customer (For
7 customer initiated request) for approval before proceed further. Engg.
If not approved, close the request and inform the customer or requester about the same
For Internal request, Raise change request* in customer specified format*** to customer**
8 and get approval. Engg.
If rejected by customer, close the request and inform the requester about the same
9 If approved, decide the disposition of current stock and ECN implementation date. CFT
Make a time plan for all the required activities and release the ECN along with initial drawing
10 ECN Team
and affected document list
Prepare sample parts and trial out the parts
11 (In case of special requirement of samples from customer before ECN approval, sample can ECN Team
be submitted on deviation)
12 Inspect, test and review the result (before / after) and process capability (if applicable) QA
13 If Fail, Define & Implement corrective action & submit fresh samples ECN Team
If Pass, update the drawing and release accordingly. Drawing & ECN register to be updated
14 Engg.
for revision.
Approved Version
Interim update affected documents, submit PPAP package for internal validation by QA HOD
15 ECN Team
with relevant documents
16 Approve internal PSW with supporting document QA Head
17 Sample submission to customer with Customer specific IPP tag# for approval ECN Team
20 If approved by customer, Get PSW approval from customer if applicable ECN Team
21 Updated the affected documents as per the affected documents list ECN Team
Implement the ECN as per decided date, ensuring that the current stock disposition has been
22 ECN Team
done. Start mass production and send parts to customer with IPP tag and record lot details
Start of "Initial Supply Control" phase. Monitor the effectiveness↗.
23 ECN Team
Follow QPINN-QA-8.6.1-Rxx-Initial Supply Control.
24 Update the ECN LOG BOOK ECN Leader
*For MSIL and M&M – 01 Month; For HCIL – 03 Months prior to implement the change
**For MSIL – Inform Engineering, For HCIL – Inform Purchasing, MPD and MPQ and For M&M –
Inform Engineering Department
***For MSIL – Use CARV, For HCIL – Use Countermeasure request form (CRF) and For M&M – Use
ECN format
↗For MSIL and M&M – 15 Days, For HCIL – 30 Days
2 Fill all the details in "PCR" format and provide the same to ME department All concerned
Receiving the change request from concerned department and enter the details in change
3 ME
tracking register
4 Inform the CFT about the same and call the PCN meeting ME
Conduct the feasibility review and risk analysis of requested change. Make action plan for
5 CFT
high risk items and take approval from management.
If required (as per QWINN-MAN-8.5.6-003-Rxx-Change Point Control Matrix), inform
6 customer## in customer specific format*** about the change. If rejected, close the request QA
Approved Version
10 Prepare sample parts as per proposed changes and trial out the parts ME
Conduct EJO or process / product validation (as per requirement) for proposed change. ME / QA /
9
Release report accordingly. Prod.
Evaluate the results with before & after comparison / dimension results / cpk study (for
10 QA
critical dim.) and validate the product for Fit, form and function
If Not OK, scrap all the sample parts, take suitable action against observations and conduct ME / QA /
11
EJO again. Prod.
12 If OK, update the affected documents as per affected document list ME
***For MSIL – Use CARV, For HCIL – Use Advance IPP form
↗For MSIL and M&M – 15 Days, For HCIL – 30 Days
##For
MSIL, send monthly 4M change report for the changes which are not required to
communicate to customer before implementation.
*For MSIL and M&M – 01 Month; For HCIL – 03 Months prior to implement the change
**For MSIL – Inform Engineering, For HCIL – Inform Purchasing, MPD and MPQ and For M&M –
Inform Engineering Department
↗For MSIL and M&M – 15 Days, For HCIL – 30 Days
All the abnormal changes trcked in QFINN-QA-8.5.6-002-Rxx-4M change tracking and summary sheet.
For customer / Supplier raised requests related to engineering specifications, Change request
will be reviewed by Engg. within 02 working days, Feasibility review will be completed by 07
working days. Customer / Supplier will be informed about the review result within max. 10
working days after receiving of request.
For Internal raised requests related to ECN and PCN, feasibility study and risk analysis will be
completed within 07 working days. Timeplan and raising of ECN/PCN with initial data will be
done within 07 working days after implementation decision.
Change management meeting to be conducted every week to review the status of changes
w.r.t. defined timeplan and current status. All the issues in open changes and effectiveness of
implemented changes will be reviewed in this meeting. Change management meeting will be
headed by Unit Head / Operations Head and all concerned persons from Engg., ME, QA,
Production, Purchase / STA (If required), and any change specific required person.
All the change requests will be entered in change tracking register and status will be updated
on weekly basis as an output of change management meeting.
Approved Version
It is the responsibility of QA Head to ensure that the proper tracking of changes through weekly
meeting will be done.
All the open issues related to changes, open change requests and change effectiveness data
will be then reviewed in MRM by top management.
8. Record retention
Supervision of this procedure is at the QA / Engg. / ME department and/or an authorized QMS
Coordinator / Quality Head in the SMR North India. This and the referred documents must be
handled as per QWINN-QA-7.5.3-001-R02-Record Retention and according to the general
Documentation procedure in the QM-System (CEBOS).
9. Annexes
NA