Foundation
Foundation
DOWEL BAR
SCEDULE OF PILE
TIE BEAM
150 150 TYPE DIA DIA NO DEPTH MAIN RING NOS.
OF OF OF OF OF STEEL OF PILE
pedestal pedestal
3-6 ø 3-6 ø
PILE PILE U/R U/R PILE(M)
20D 20D
D
D-150
75 TH. P.C.C
50
50
75
1 2 3 4 75 TH. B.F.S
75
75
11'-8" 9'-5" 11'-8"
150TH SAND FILLING
r
P2 300 750 02 6.00 5-10 ø 6-ø @150 C/C
h
C.L. OF.PILE
A
P2
P2
P2
P2
P3
P3
P3
P3
P3
11'-2"
00
12 h
r
150
pedestal 150 150
C.L.OF COLUMN T0TAL NOS OF PILE = 48
P2 P2
300300
600
B P3
P3 1 1
150
2'-5" STIRRUPS DOWEL BAR
75
P2 P2
C 600 600 300
P3
P3 75
300 TIE BEAM 150 150
TIE BEAM
P3
P3
DET.OF.PC3
3-6 ø pedestal pedestal 3-6ø
8'-11" 20D 20D
D-150
75 TH. P.C.C 75
50
50
75
75 TH. B.F.S 75
P3 P2 P2 150TH. SAND FILLING
P3
GROND LV. r h REIN DET OF PILE CAP
D P3
P3
C.L. OF.PILE
PILE PILE CAP NO.OF. NO.OF.
SECTION 2:2 CAP BELOWCOLUMN PILE.IN. PILE
h r
300/350
600
MARK THE.GOUP CAP 'D'
P3 P2 P2
P3
A1,A4,B3,B4,D3,D4,E1,
PC2 E2,E3,E4,F3,F4 2-12 ø 550 15-12 ø 14-12 ø
RING 300 300 PC3 A2,A3,C1,C2,D1,D2,F1, 3-12 ø 600 15-12 ø 14-10 ø
11'-4" 600 600
F4
75
300 300
150
MAIN STEEL 150 150
600
pedistal
2 2
150
P2 P2 P2 P2
1800
75
E DET.OF.PC1&PC2
P2 P2 P2 P2
C.L.OF COLUMN
11'-7"
P3
P3
1500
DU
F
P2
P2
P2
P2
P3
P3
P3
11'-8" 9'-5" P3
BUCKET LENGTH
11'-8"
TYPICAL DETS. OF DOUBLE
UNDER REAMED PILE