TEMPORARY SIGN BOARD - JEBEL ALI LABOUR CITY
Prepared by Dubai Office
Drawing
Sl No. Description Total Requested Difference
SWD/TM/01 SD/TM/TT/01 SD/TM/DW/01 SWD/SEW/TM/01
1 Men at Work with Text 11 x 9 7 27
2 Men at Work x 16 x 1 17
3 Men at Work End 1 x 1 1 3
4 T junction Chevron 2 x x x 2 20 -18
5 Chevron Keep Left 13 x x x 13
6 Chevron Keep Right 1 x x x 1
7 No Entry 1 x x x 1 20 -19
8 No Entry Construction Vehicles Only x x x 3 3
9 Al Asayal Road Left 1 x x x 1 10 -9
10 Al Asayal Road Right 1 x x x 1 10 -9
11 Reduce Speed Now 5 x 14 7 26
12 Reduce Speed x 4 x x 4
13 Lane One Way 2 x x x 2 20 -18
14 Solar Illuminated Keep Left 1 x 7 4 12
15 Keep Left x x 1 x 1
16 Right turn closed, Only Left 1 x x x 1
17 Straight Line closed with Right Arrow 1 x x x 1 15 -14
18 Straight Line closed with Left Arrow x x x x 0 15 -15
19 Median Cross 1 x x x 1 10 -9
20 Deep Excavation x 15 x 7 22
21 Right Lane Closed - Two Way Road ahead x 1 13 3 17
22 Right Lane Closed - straight ahead x 1 x x 1
23 Three lane straight, work in progress to right x 1 x x 1
24 End of Roadworks - Sorry for any delay x x x 1 1
25 Left and Right Lane x x x x 0 1 -1