S.No. Item MB/PG Qty Unit AEE DEE EE Amount SE
S.No. Item MB/PG Qty Unit AEE DEE EE Amount SE
213.00
S.No.
Item MB/Pg Qty Unit AEE DEE EE SE
1
RCP-JP1 Steel 8007/2-20 17.620 MT 8/16/2016 8/17/2016 8/18/2016
2
JP3-JP4 Steel 8310/1-33 35.332 MT 11/4/2016 11/5/2016 11/6/2016 11/6/2016
3 JP2-JP3 slab concrete 8313/2-4 96.367 Cum 11/14/2016 11/15/2016 11/17/2016 11/26/2016
4 Service roads GSB R/S 8005/2-3 919.800 Cum 11/16/2016 11/17/2016 11/26/2016
5 Service roads WMM R/S 8005/4-5 894.600 Cum 11/18/2016 11/19/2016 11/26/2016
6 Service roads BM R/S 8005/9-11 220.500 Cum 11/18/2016 11/19/2016 11/26/2016
7 B/w Approaches GSB 8007/22-23 780.270 Cum 3/8/2017 3/9/2017 3/12/2017
8 B/w Approaches WMM 8007/24-25 780.270 Cum 3/9/2017 3/10/2017 3/12/2017
9 Service roads GSB L/S 8306/1-4 733.100 Cum 3/18/2017 3/19/2017 3/28/2017
10 Service roads WMM L/S 8306/5-8 957.680 Cum 3/22/2017 3/23/2017 3/28/2017
11 8306/11-14
Service roads BM &17-19 251.020 Cum 3/26/2017 3/27/2017 3/28/2017 3/28/2017
12 Canal retaining wall foundation 8413/3-4 355.500 Cum 4/28/2017 4/29/2017 5/15/2017
13 Canal retaining wall foundation 8413/10-11 573.750 Cum 5/9/2017 5/10/2017 5/13/2017 5/15/2017
14 Beyond approches, Service roads GSB 8711/3-7 794.350 Cum 6/20/2017 6/21/2017 6/22/2017 6/24/2017
15 Beyond approches, Service roads WMM 8711/8-12 783.550 Cum 6/12/2017 6/13/2017 6/14/2017 6/24/2017
16 Beyond approches, Service roads BM 8711/20-24 319.030 Cum 6/20/2017 6/21/2017 6/22/2017 6/24/2017
Amount
1149176.00
2304353.00
672931.00
1070647.00
1497560.00
1609871.00
908234.00
1306172.00
853328.00
1603156.00
1832697.00
1414535.00
2282951.00
924623.00
1311663.00
2329238.00
23071135.00