S.No. Item MB/PG Qty Unit AEE DEE EE Amount SE

This document contains details of various construction items including slabs, retaining walls, service roads, and canal works. It lists 16 items with information on measurement book reference, quantity, unit, actual early and delayed early dates, and estimated and supervised amounts. The total supervised amount for all 16 items is Rs. 23,07,11,35.00.

Uploaded by

Phani Pitchika
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

S.No. Item MB/PG Qty Unit AEE DEE EE Amount SE

This document contains details of various construction items including slabs, retaining walls, service roads, and canal works. It lists 16 items with information on measurement book reference, quantity, unit, actual early and delayed early dates, and estimated and supervised amounts. The total supervised amount for all 16 items is Rs. 23,07,11,35.00.

Uploaded by

Phani Pitchika
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

S.No.

Item MB/Pg Qty Unit AEE DEE EE Amount SE


1 RMP1-KRCP &KNP1-KRCP Slab 7999/41-47 150.40 Cum 9/5/2016 9/6/2016 10.00
2 JP2-JP3 slab concrete 8313/2-4 96.36 Cum 11/14/2016 11/15/2016 6.00
3 RCP-JP1, JP1-JP2 Slab 7995/46-53 181.00 Cum 9/20/2016 9/21/2016 12.00
4 Service Roads WMM 8005/4-5 894.60 Cum 11/18/2016 11/19/2016 14.00
5 Service Roads SDBC 8005/12-13 11/26/2016 11/27/2016 11/29/2016 10.00
6 JP3-JP4 slab concrete 8405/1-3 197.36 Cum 11/28/2016 11/29/2016 12/2/2016 13.00
7 Kakinada side Retaining wall ( Non Viaduct)
foundations 7999/50-51 103.00 Cum 12/17/2016 12/19/2016 5.00
8 Foot path kerbs 8314/7-9 86.00 Cum 2/2/2017 2/3/2017 6.00
9 Retaining wall Foundation (Non viaduct) 8006/42-43 84.58 Cum 2/6/2017 2/7/2017 3.00
10 Foot path kerbs 8314/10-13 208.00 Cum 2/8/2017 2/9/2017 2/11/2017 14.00
11 Wearing coat 8411/1-10 360.76 Cum 3/8/2017 3/9/2017 3/13/2017 36.00
12 WMM service, Beyond approches roads 8306/5-8 957.60 Cum 3/22/2017 3/23/2017 16.00
13 Canal retaining wall foundation 8413/3-4 355.50 Cum 4/28/2017 4/29/2017 14.00
14 Canal retaining wall Sub structure 8413/5-6 299.00 Cum 5/1/2017 5/2/2017 5/3/2017 10.00
15 SDBC beyond approches 8306/22-26 5/4/2017 5/5/2017 10.00
16 Canal retaing wall foundation 8413/10-11 573.75 Cum 5/9/2017 5/10/2017 5/13/2017 23.00
17 WMM service, Beyond approches roads 8414/16-18 391.00 Cum 5/12/2017 5/15/2017 6.50
18 Canal retaining wall Sub structure 8413/12 249.00 Cum 5/15/2017 5/16/2017 9.00
19 Canal retaining wall Sub structure 8007/32-33 353.00 Cum 5/23/2017 5/24/2017 12.00
20 SDBC service, Beyond approches roads 8414/28-30 Cum 5/27/2017 5/29/2017 8.00
21 Beyond approches SDBC 8711/28-31 6/23/2017 6/24/2017 6/27/2017 15.00
22 Canal Retaing wall foot paths 8652/15-16 361.00 Cum 6/26/2017 6/27/2017 13.00
265.50
S.No.
Item MB/Pg Qty Unit AEE DEE EE Amount SE
1
RCP-JP1 Steel 8007/2-20 17.62 MT 8/16/2016 8/17/2016 11.50
2
RMP1-KRCP,KNP1-KRCP Concrete 7999/40-47 150.55 Cum 9/5/2016 9/6/2016 9/8/2016 10.00
3
RCP-JP1, JP1-JP2 Slab 7995/46-53 181.00 Cum 9/20/2016 9/21/2016 12.00
4
JP2-JP3 Steel 8309/1-22 20.58 MT 10/13/2016 10/14/2016 13.00
5
JP3-JP4 Steel 8310/1-33 35.00 MT 11/4/2016 11/5/2016 11/6/2016 23.00
6
JP2-JP3 slab concrete 8313/2-4 96.36 Cum 11/14/2016 11/15/2016 11/17/2016 6.00
7
Service roads WMM R/S 8005/4-5 894.50 Cum 11/18/2016 11/19/2016 15.00
8
JP3-JP4 slab concrete 8405/1-3 197.36 Cum 11/28/2016 11/29/2016 12/2/2016 13.00
9
B/w Approaches WMM 8007/24-25 780.20 Cum 3/9/2017 3/10/2017 2/11/2017 13.00
10
Service roads WMM L/S 8306/5-6 957.68 Cum 3/22/2017 3/23/2017 16.00
11
Service roads BM 8306/15-19 169.50 Cum 3/26/2017 3/27/2017 12.00
12
Canal retaining wall foundation 8413/3-4 355.50 Cum 4/28/2017 4/29/2017 14.00
13
Beyond approches, Service roads WMM 8414/16-18 391.00 Cum 5/12/2017 5/15/2017 6.50
14
Canal retaining wall Sub structure 8007/32-33 353.00 Cum 5/23/2017 5/24/2017 12.00
15
Beyond approches, Service roads WMM 8711/8-12 783.55 Cum 6/12/2017 6/13/2017 6/14/2017 13.00
16
Beyond approches, Service roads BM 8711/20-24 319.03 Cum 6/20/2017 6/21/2017 6/22/2017 23.00

213.00
S.No.
Item MB/Pg Qty Unit AEE DEE EE SE
1
RCP-JP1 Steel 8007/2-20 17.620 MT 8/16/2016 8/17/2016 8/18/2016
2
JP3-JP4 Steel 8310/1-33 35.332 MT 11/4/2016 11/5/2016 11/6/2016 11/6/2016
3 JP2-JP3 slab concrete 8313/2-4 96.367 Cum 11/14/2016 11/15/2016 11/17/2016 11/26/2016
4 Service roads GSB R/S 8005/2-3 919.800 Cum 11/16/2016 11/17/2016 11/26/2016
5 Service roads WMM R/S 8005/4-5 894.600 Cum 11/18/2016 11/19/2016 11/26/2016
6 Service roads BM R/S 8005/9-11 220.500 Cum 11/18/2016 11/19/2016 11/26/2016
7 B/w Approaches GSB 8007/22-23 780.270 Cum 3/8/2017 3/9/2017 3/12/2017
8 B/w Approaches WMM 8007/24-25 780.270 Cum 3/9/2017 3/10/2017 3/12/2017
9 Service roads GSB L/S 8306/1-4 733.100 Cum 3/18/2017 3/19/2017 3/28/2017
10 Service roads WMM L/S 8306/5-8 957.680 Cum 3/22/2017 3/23/2017 3/28/2017
11 8306/11-14
Service roads BM &17-19 251.020 Cum 3/26/2017 3/27/2017 3/28/2017 3/28/2017
12 Canal retaining wall foundation 8413/3-4 355.500 Cum 4/28/2017 4/29/2017 5/15/2017
13 Canal retaining wall foundation 8413/10-11 573.750 Cum 5/9/2017 5/10/2017 5/13/2017 5/15/2017
14 Beyond approches, Service roads GSB 8711/3-7 794.350 Cum 6/20/2017 6/21/2017 6/22/2017 6/24/2017
15 Beyond approches, Service roads WMM 8711/8-12 783.550 Cum 6/12/2017 6/13/2017 6/14/2017 6/24/2017
16 Beyond approches, Service roads BM 8711/20-24 319.030 Cum 6/20/2017 6/21/2017 6/22/2017 6/24/2017
Amount

1149176.00

2304353.00

672931.00

1070647.00

1497560.00

1609871.00

908234.00

1306172.00

853328.00

1603156.00

1832697.00

1414535.00

2282951.00

924623.00

1311663.00

2329238.00

23071135.00