1.0 OBJECTIVES
1.1 Ensure that documents in all processes are approved prior to distribution.
1.2 Ensure that all requirements pertaining to the concessionaires/customers and
other related requirements are properly documented.
1.3 Ensure that all documented processes issued for use are adequate, controlled
and readily identifiable.
1.4 Ensure that a document from external origin that affects the QMS is
identifiable and properly disseminated.
1.5 Ensure that all records are maintained and controlled for identification,
storage, protection, retrieval, retention time and disposition.
2.0 SCOPE
This procedure defines the controls for QMS documents which are related to:
Revision 00 Page 1
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-02
3.0 REFERENCES
b) The ISO COORDINATOR shall ensure that all documents and all forms
used by BWD are systematically arranged and given specific identification
and audit status.
Revision 00 Page 2
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-03
c) The ISO COORDINATOR shall develop, update and keep a copy of all
forms to be used.
Revision 00 Page 3
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-04
e) The ISO COORDINATOR shall ensure that the Procedures and Work
Instructions Manual contain the following framework:
objectives
scope
references
responsibility and authority
process
records
Revision 00 Page 4
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-05
h) Once the QMS documents have been approved, it will be disseminated and
shall take its effectivity upon approval.
a) Once the Board of Director has approved the document, the ISO
COORDINATOR shall identify distribution of the documents and assign
control copy number using Document and Controlled Copy List. No QMS
document shall be reproduced in any form without the authorization of the
BOD through the General Manager.
b) Once the General Manager has signed the Document and Controlled Copy
List, the ISO COORDINATOR shall facilitate reproduction of the
documents to be issued ensuring clarity and completeness of pages.
Revision 00 Page 5
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-06
Revision Number
Initial Date of Approval
Date Prepared
Date of Approval
Control Number
Document Title
Revision 00 Page 6
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-07
a) All personnel shall strictly and consistently utilize controlled forms issued
for use to provide evidence of compliance with specified QMS
requirement.
c) All latest forms and other references from external origin that affects the
QMS shall be furnished to ISO COORDINATOR.
Revision 00 Page 7
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-08
e) Should there be discrepancies between records in soft and hard copy form,
the hard copy on file will be considered the valid and official ones.
Revision 00 Page 8
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-09
b) As a policy, all hard copy files per division are kept in arch file binder
folders, while personnel 201 files in individual envelope/folder maintained
under the custody of Administrative Manager. Other hard copy files for
reference use are maintained per folder.
a) Records in hard copy form are open for access by any personnel in the
organization with proper coordination to personnel having direct
responsibility for them. In cases where records are to be maintained in a
secured cabinet, a duplicate key shall be provided to the designated person
with office administration and/or personnel administration function.
a) All records in hard copy form are to be retained for the current year or
when deemed necessary and as declared in the Retention Records Table.
Revision 00 Page 9
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-10
a) All records in hard copy form upon reaching its retention period shall be
disposed accordingly as declared in the Retention Records Table.
Revision 00 Page 10
Procedure 01 Date prepared : December 27, 2016
Date approved : December 29, 2016
Effectivity Date : January 3, 2017
DOCUMENTED Revision No. : 00
INFORMATION Revision Date :
Control No. : PM01-11
a) All records in soft copy form shall to be retained for the current year or
when deemed necessary.
a) All records in soft copy form, upon reaching its retention period, shall be
disposed or transferred to back-up hard drive or any available medium
when deemed necessary.
7.0 RECORDS
Revision 00 Page 11