A-8 Control Plan Checklist Yes No N/A Comment / Action Required Due Date Person Responsible
The 3 sentence summary is:
The checklist ensures that a control plan was developed according to APQP guidelines, includes all PFMEA controls and special characteristics, and addresses material specifications, processing, assembly, packaging, testing and dimensional requirements. Gages and equipment availability are confirmed, and measurement systems are compatible with customer requirements. Sample sizes are based on statistical methods.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
285 views
A-8 Control Plan Checklist Yes No N/A Comment / Action Required Due Date Person Responsible
The 3 sentence summary is:
The checklist ensures that a control plan was developed according to APQP guidelines, includes all PFMEA controls and special characteristics, and addresses material specifications, processing, assembly, packaging, testing and dimensional requirements. Gages and equipment availability are confirmed, and measurement systems are compatible with customer requirements. Sample sizes are based on statistical methods.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1
A-8 CONTROL PLAN CHECKLIST
Customer or Internal Part No. Revision Level
Person Question Yes No N/A Comment / Action Required Due Date Responsible Was the control plan developed according to the methodology described in Chapter 6 of the 1 APQP Manual? Have all the controls identified in the PFMEA 2 been included in the control plan? Area all special product/process characteristics 3 included in the control plan? Were DFMEA and PFMEA used to prepare the 4 control Plan? Are Material specifications requiring inspection 5 identified? Does the control plan address incoming (material/components through 6 processing/assembly including packaging? Are engineering performance testing and 7 dimensional requirements identified? Are gages and test equipment available as 8 required by the control plan? If required, has the customer approved the 9 control plan? Are the gage Methodology and compatibility 10 appropriate Have to meet customer measurement requirements? systems analysis been completed in accordance with customer 11 requirements? Are sample sizes based upon industry standards, statistical sampling plan tables, or other statistical process control methods or 12 techniques?