S.P. Mechanical Engineering Punch List

This document is a punch list for a test system for a plant equipment. It contains 10 items to be completed or addressed before acceptance of the equipment. The items are categorized as A, B, or C depending on whether they need to be completed before release, within two weeks of acceptance, or before commissioning. The punch list requires sign-off from the subcontractor, technical consultant, and client once the items are resolved.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views1 page

S.P. Mechanical Engineering Punch List

This document is a punch list for a test system for a plant equipment. It contains 10 items to be completed or addressed before acceptance of the equipment. The items are categorized as A, B, or C depending on whether they need to be completed before release, within two weeks of acceptance, or before commissioning. The punch list requires sign-off from the subcontractor, technical consultant, and client once the items are resolved.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

S.P. Mechanical Engineering Co.,Ltd.

TEST SYSTEM No. : CONTRACT No. :


PLANT : EQUIPMENT NO :
PUNCH LIST
CLIENT : IRPC SUBCONTRACTOR : S.P .Mechanical Eng.
ITEM NO. DESCRIPTION Category Action by SUBCONTR TECHNIP CLIENT
(Sign & Date) (Sign & Date) (Sign & Date)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

CATEGORY: A: Could not release Equipment if not completed


B: Should be completed within two weeks after acceptance
C: Should be completed before commissioning

DRB 06 Construction/NM