0% found this document useful (0 votes)
27 views

Legend For Value Stream Map (VSM) : Customer Process Step Waits Between Info./Software Flow Starburst Data Box

This document provides a legend for creating a value stream map (VSM). It explains that yellow post-its should be used for identifying customers, process steps, and notes. Hot pink post-its indicate waits within or between process steps. Green post-its map information or software flow, with arrows connecting them to process steps. Blue post-its add data on cycle times, errors, and waits within steps. Starburst-shaped post-its identify improvement opportunities. The legend is meant to standardize how a VSM visually maps a process from the customer perspective and identifies areas for improvement.

Uploaded by

vandyrana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Legend For Value Stream Map (VSM) : Customer Process Step Waits Between Info./Software Flow Starburst Data Box

This document provides a legend for creating a value stream map (VSM). It explains that yellow post-its should be used for identifying customers, process steps, and notes. Hot pink post-its indicate waits within or between process steps. Green post-its map information or software flow, with arrows connecting them to process steps. Blue post-its add data on cycle times, errors, and waits within steps. Starburst-shaped post-its identify improvement opportunities. The legend is meant to standardize how a VSM visually maps a process from the customer perspective and identifies areas for improvement.

Uploaded by

vandyrana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

LEGEND FOR VALUE STREAM MAP (VSM)

Step # Step Name Post-It Color & Shape/Symbol Notes

Identify your Customer: Who's requesting the


1 Yellow, Crown
service? How do they request it (trigger)?

Identify the 1st process step & subsequent steps


2 Yellow, Process Box
Use a separate post-it for "notes".
Identify "waits" within the process step, Inside the process box, draw a
3
if applicable. waiting triangle.
Identify "wait" between process step(s),
4 Hot Pink, Warning Triangle
if applicable.
Yellow, Process Box &
5 Map the Customer's experience.
Hot Pink, Warning Triangle
Map Information flow/software used, if applicable. Green, Information Flow Box
6 Draw arrow line connecting the
process step to the info flow box.
7 Add data boxes; C/T, errors, waits within Blue, Data Box
Add Kaizen Bursts aka Starbursts. Designated shape for
8
(improvement opportunities and ideas) Starburst post-it

C/T =
PROCESS -
Error =
XYZ -
Wait W/I=
Corporation -

Customer Process Step Waits Between Data Box


Info./Software Flow Starburst

You might also like