Blending Calculation
Blending Calculation
A. Blended Gasoline RON 80
Blended Gasoline RON 80 Tank Capacity = 6000 m3
Light Naphtha Fraction = 52%
Reformate Fraction = 48%
Portion volume of Light Naptha = 3125 m3
Portion volume of Reformate = 2875 m3
Proposed LN blending pumps are = 6.0 m3/hr min.= 4.7 m3/hr
Proposed reformate blending pumps are = 5.5 m3/hr min.= 4.7 m3/hr
Result:
Filling time for Light Naphta = 21.8 days
Filling time for Reformate = 21.8 days
IKL propose:
The existing truck loading pumps P‐539 A/B (capacity 32 m3/hr) can be utilised as LN blending pumps
The existing truck loading pumps P‐537 A/B (capacity 32 m3/hr) can be utilised as reformate blending pumps
RO installed at discharge pump
B. Blended Gasoline RON 95
Blended Gasoline RON 95 Tank Capacity = 6000 m3
Reformate Fraction = 87%
Light Naphtha Fraction = 13%
Portion volume of Reformate = 5217 m3
Portion volume of Light Naptha = 783 m3
Proposed reformate blending pumps are = 26.5 m3/hr min.= 4.7 m3/hr
Proposed LN blending pumps are = 4.0 m3/hr min.= 3.3 m3/hr
Result:
Filling time for Reformate = 8.2 days
Filling time for Light Naphta = 8.2 days
IKL propose:
The existing MS RCFP pumps P‐511 A/B (capacity 20 m3/hr) can be utilised as LN blending pumps
The existing truck loading pumps P‐537 A/B (capacity 32 m3/hr) can be utilised as reformate blending pumps
RO installed at discharge pump