Stockpile and Cut-Off Optimization Module
Stockpile and Cut-Off Optimization Module
Four-X Analyser™
The module re-schedules the mining sequence,
Maximise Economic Performance taking into account all the constraints and setting
Four-X Analyser is a suite of strategic mine
in Four-X Analyser and optimising the stockpile
planning tools designed for professional mine
utilisation and cut-off strategy. The process uses
planners. There is a growing range of modules
a Whittle adaptation of the Lane approach to
which can be added to Analyser, further
stockpile and cut-off optimisation.
increasing its performance and utility.
It can be used to:
The Stockpile & Cut-off Module provides
comprehensive grade-stockpile and cut-off • Determine the optimum usage of grade
STRATEGIC MINE PLANNING SOFTWARE
Model manipulation
Discounted Pit Shells
Push Back Chooser
Express NPV Output
Advanced Analysis
Multi -analysis
Push Back 50
Mining Width
Pit optimization
Economic /
operational
modelling
strategic mine planning suite to adapt and evolve
Analysis and graphs with individual users requirements. A whole new
Data export range of mine planning analysis possibilities is now
3D interactive model
visualisation available to mine planning professionals.
Whittle
There are many technical papers and case studies on the use of Whittle software. Request literature from:
Whittle Programming Pty Ltd, Level 4, 1013 Whitehorse Road, Box Hill, Vic 3128, Australia
Telephone +613 9899 3799 Facsimile +613 9899 3755 email: [email protected] web: www.whittle.com.au ©2001 Whittle Programming Pty Ltd