Basic Subcontracting Process
Basic Subcontracting Process
We had completed and Subcontractor creation and respective linkage. As I said before
Subcontracting is part of Production process so that we need to define Routing. Now let’s see
detail routing process.
As part of routing process it is necessary to define either “Work Center” or “Machine Center”
as per your license. Here I am creating Work Center for respective routing.
Go to Manufacturing Capacities Work Center
General Tab:
1. Select “Subcontractor No.” from the vendor list (This is the area we tag this
particular work center is used for ICON Subcontracting.
2. System automatically will select Flushing Method as Manual. If you are
following different then select from the drop down
3. Select Gen. Prod. Posting Group from the list – For finance Use
Scheduling Tab:
1. Enter Unit of Measure code as per the Subcontractor (Minutes, Days, Hours)
2. Enter Capacity and Efficiency as defined above, Change the values if required
3. Select the Shop Calendar code from the list (It will define Subcontractor
Calendar and it is a part of our production planning)
Once you defined Shop calendar code then it is necessary to run the calendar.
Go to the Planning Menu Calendar
1. Work Center Calendar window will open then Click Functions Calculate
2. In Calculate Work Center window Go to Option Tab then enter Start Date
and End date then Click OK
3. Please note that Shift has been defined in the system
4. As per the diagram below Calendar entries will be generated
Routing Creation:
Go to ManufacturingProduct DesignRouting
1. Generate Routing No. manually or through System
2. Enter Description
3. Enter Operation No. as 10
4. Select type as Work Center
5. Select Your work center no. from the list
6. Enter run time (In Work Center card we defined UOM as Minutes so here
enter run time approx. in minutes)
7. Change the status to Certified
Creation of Semi-finished Item -- Raw Material Item – Production BOM
Semi-finished Item:
Go to Manufacturing Production Design Item
Check the following fields:
1. Item No.
2. Item Description
3. Base Unit of Measure
4. Invoicing Tab Gen. Prod. Posting Group, Inventory Posting Group
5. Replenishment Tab Replenishment System Should be a Prod. Order
6. Need to attach Prod. BOM No. and Routing. (we will see after creation of
BOM)
Raw Material Item
Check the following fields:
1. Item No., Item Description, Base Unit of Measure
2. Invoicing Tab Gen. Prod. Posting Group, Inventory Posting Group
3. Replenishment Tab Replenishment System Should be a Purchase
BOM Creation:
Go to Manufacturing Product Design Production BOM
Click LineRouting
Your Subcontracting Order has been generated now. Let’s go have a look.
Go to ManufacturingExecutionSubcontracting Order
Now we need to send Delivery Challan (57 F4) using the above Subcontracting Order.
Here you have two tabs 1. Delivery Details (Used for Sending material) 2. Receipt details
(for receiving Semi finished Parts)
1. In delivery, we needs to enter Delivery Comp. for column then system will
calculate Qty to send column automatically
2. If you want to send bulk raw material to the subcontractor then you can
directly put the value in Qty to send column.
3. Specify Delivery Challan date
4. Enter company location
5. Click Send
After Apply delivery Challan Click Receive. Quantity Accepted column is updated with you
Quantity
You can take GRN Print from Posted Receipts.