Basic Subcontracting Process

1. The document outlines the basic subcontracting process in Navision, which involves creating a subcontracting location card, tagging the location to a vendor, defining a work center routing, and creating a released production order to generate a subcontracting order. 2. Key steps include creating a semi-finished item and production BOM, attaching the BOM and routing to the item, then generating a released production order which will create a subcontracting worksheet when calculated. 3. From the worksheet, a subcontracting order is generated which can be used to send a delivery challan to the subcontractor and later receive the semi-finished parts back by applying the challan.

Uploaded by

Dhiraj Ganwir
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

Basic Subcontracting Process

1. The document outlines the basic subcontracting process in Navision, which involves creating a subcontracting location card, tagging the location to a vendor, defining a work center routing, and creating a released production order to generate a subcontracting order. 2. Key steps include creating a semi-finished item and production BOM, attaching the BOM and routing to the item, then generating a released production order which will create a subcontracting worksheet when calculated. 3. From the worksheet, a subcontracting order is generated which can be used to send a delivery challan to the subcontractor and later receive the semi-finished parts back by applying the challan.

Uploaded by

Dhiraj Ganwir
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 16

Basic Subcontracting Process

One kind of production process at vendor location is subcontracting. In Navision we cannot


create Subcontracting Order directly because it is re-routed through released production
order. Please follow the steps to create subcontracting cycle

Creation of Location Card

As said above, it is process at supplier location and it is mandatory to create location in


location card and tag as subcontracting location. See the following

Go to Warehouse Setup  Locations


In Excise Tab, We need to declare as this location is subcontracting location as said
above. This location needs to tag to Vendor card of “Icon Technologies” then Subcontractor
No. ‘ICON01’will come automatically here

Tagging Location to Vendor Card:

We had completed and Subcontractor creation and respective linkage. As I said before
Subcontracting is part of Production process so that we need to define Routing. Now let’s see
detail routing process.

As part of routing process it is necessary to define either “Work Center” or “Machine Center”
as per your license. Here I am creating Work Center for respective routing.
Go to Manufacturing Capacities  Work Center

General Tab:

1. Work Center No. has been generated from Number Series


2. Enter Work Center Name
3. Select Work Center Group Code from the list (It is used when you are
calculating efficiency of similar type of work centers)
Posting Tab:

1. Select “Subcontractor No.” from the vendor list (This is the area we tag this
particular work center is used for ICON Subcontracting.
2. System automatically will select Flushing Method as Manual. If you are
following different then select from the drop down
3. Select Gen. Prod. Posting Group from the list – For finance Use

Scheduling Tab:
1. Enter Unit of Measure code as per the Subcontractor (Minutes, Days, Hours)
2. Enter Capacity and Efficiency as defined above, Change the values if required
3. Select the Shop Calendar code from the list (It will define Subcontractor
Calendar and it is a part of our production planning)
Once you defined Shop calendar code then it is necessary to run the calendar.
Go to the Planning Menu  Calendar

1. Work Center Calendar window will open then Click Functions  Calculate
2. In Calculate Work Center window Go to Option Tab then enter Start Date
and End date then Click OK
3. Please note that Shift has been defined in the system
4. As per the diagram below Calendar entries will be generated
Routing Creation:
Go to ManufacturingProduct DesignRouting
1. Generate Routing No. manually or through System
2. Enter Description
3. Enter Operation No. as 10
4. Select type as Work Center
5. Select Your work center no. from the list
6. Enter run time (In Work Center card we defined UOM as Minutes so here
enter run time approx. in minutes)
7. Change the status to Certified
Creation of Semi-finished Item -- Raw Material Item – Production BOM
Semi-finished Item:
Go to Manufacturing  Production Design  Item
Check the following fields:
1. Item No.
2. Item Description
3. Base Unit of Measure
4. Invoicing Tab Gen. Prod. Posting Group, Inventory Posting Group
5. Replenishment Tab Replenishment System Should be a Prod. Order
6. Need to attach Prod. BOM No. and Routing. (we will see after creation of
BOM)
Raw Material Item
Check the following fields:
1. Item No., Item Description, Base Unit of Measure
2. Invoicing Tab Gen. Prod. Posting Group, Inventory Posting Group
3. Replenishment Tab Replenishment System Should be a Purchase
BOM Creation:
Go to Manufacturing Product Design  Production BOM

Tagging Production BOM & Routing into Semi finished Item


Go to I 1001 item Card and select the following:

1. Routing No. – Select from the Routing list ICON R


2. Production BOM No. – Select from the Production BOM List
(Note: We have finished setups and linkages. Now we will see Subcontracting Process)
Creation of Release Prod. Order for Subcontracting
Go to Manufacturing  Execution Released Production Orders
Steps to create:
1. Select Production No. by clicking F3
2. Select Source Type as Item and Source No. is I 0001 (Our semi-finished
Item)
3. Enter Quantity and Due date
4. Posting Tab  Select location
5. Click Functions Refresh
6. System will create line based on your BOM and Routing
7. To See Components Click Lines  Components
8. To See Routing Click Lines  Routing
Released Production Order:
Click Line  Components

Click LineRouting

Creation of Subcontracting Order:


Go to Manufacturing Planning Subcontracting Worksheets
After window Opens, Click FunctionsCalculate Subcontracts.
In Prod. Order routing line Tab, Select your released Production No. then Click OK
After clicking OK system will generate a line in Subcontracting worksheet.

Then, Click FunctionsCarryout Action Message

Your Subcontracting Order has been generated now. Let’s go have a look.

Go to ManufacturingExecutionSubcontracting Order
Now we need to send Delivery Challan (57 F4) using the above Subcontracting Order.

Click LineOrder Subcon. Details

Here you have two tabs 1. Delivery Details (Used for Sending material) 2. Receipt details
(for receiving Semi finished Parts)

1. In delivery, we needs to enter Delivery Comp. for column then system will
calculate Qty to send column automatically
2. If you want to send bulk raw material to the subcontractor then you can
directly put the value in Qty to send column.
3. Specify Delivery Challan date
4. Enter company location
5. Click Send

After Clicking Send Delivery Challan Posted get updated with 1

Go to Delivery Challan PostedDrill down Select your delivery


challanDeliveryCard then you can print 57 F4
Receive Material from Subcontractor:
1. Go to Receipt Details Enter Qty to Accept
2. System will update Qty to consume column
3. Give Vendor Shipment No. and Posting Date in Header column
4. Now, We have adjust consumption against 57 F4. For that
5. Click Function Apply Delivery Challan
In Apply Delivery Challan window select App. Delivery Challan No. from the lookup and Qty
to Consume is 10.

After Apply delivery Challan Click Receive. Quantity Accepted column is updated with you
Quantity
You can take GRN Print from Posted Receipts.