0% found this document useful (0 votes)
48 views1 page

Contract - Form 2012

The document is a requisition for engineering services on a fixed term contract from January 1, 2013 to December 31, 2013. It provides details on 3 proposed construction projects including a swimming pool, department building, and police station. The contract is for a draughtsman position with an estimated monthly salary of Rs. 14,250 to provide AutoCAD drafting services. The projects range in cost from Rs. 50 million to Rs. 310 million and have estimated completion dates between May 2013 and October 2013.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

Contract - Form 2012

The document is a requisition for engineering services on a fixed term contract from January 1, 2013 to December 31, 2013. It provides details on 3 proposed construction projects including a swimming pool, department building, and police station. The contract is for a draughtsman position with an estimated monthly salary of Rs. 14,250 to provide AutoCAD drafting services. The projects range in cost from Rs. 50 million to Rs. 310 million and have estimated completion dates between May 2013 and October 2013.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CENTRAL ENGINEERING CONSULTANCY BUREAU

To: General Manager Ref:

REQUISITION FOR SERVICES ON FIXED TERM CONTRACT

(A) Project Information


A-1 Project Name & Location : 1. Proposed swimming pool for provincial
sports complex at Babulla
2. Proposed building for department of
transport & logistic management
3. Proposed police station for jaffan

A-2 Client's Name : 1. Ministry of sports


2. University of moratuwa
3. Department of police
A-3 Job No. : 1. D1373
2. C783
3. D1393
A-4 Cost of the Projects : 1. Rs. 50M
2. Rs.112M
3.Rs.310M
A-5 a) Agreement Signed /Not Signed : Signed
b) Date of Agreement :-
A-6 Income
(a) Estimated Consultancy Fee : 1. Rs. 0.75M
2. Rs. 0.35 M
or 3. Rs. 1.0M
(b) Estimated Income of Turnkey Project : : Rs. -
A-7 Schedule date of completion of project : 1. May 2013
2. March 2013
3. Octomber 2013
(B) Details on Contract
B-1 Designation : Draughtsman
B-2 Job description : Auto Cad drafting

B-3 Period of Contract : From 01/01/2013 to 31/12/2013


B-4 Monthly Salary : Rs.14250

Date:……………………… …………………………………………..
AGM (DRD)

You might also like