0% found this document useful (0 votes)
213 views

Fan Sizing VENTILATION

This document provides calculations for the volume and heat load requirements for the ventilation system of different rooms in a project. It lists 9 rooms with their dimensions, air change requirements per hour, equipment heat loads, occupancy loads, exposed surface area loads and the total heat load calculated. The total air requirement is calculated based on both volume basis and heat load basis. The selected exhaust fan capacity is also provided for each room to meet the air changes per hour.

Uploaded by

Arun Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
213 views

Fan Sizing VENTILATION

This document provides calculations for the volume and heat load requirements for the ventilation system of different rooms in a project. It lists 9 rooms with their dimensions, air change requirements per hour, equipment heat loads, occupancy loads, exposed surface area loads and the total heat load calculated. The total air requirement is calculated based on both volume basis and heat load basis. The selected exhaust fan capacity is also provided for each room to meet the air changes per hour.

Uploaded by

Arun Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Volume calculation for the P&V system (Wet Type & Exhaust ventilation system)

Project : M/s.VIDUL BIO MASS PVT LTD Volume basis calcualtion Heat load calcualtion Delta T :36.25-33.2 3 S=0.24kj/kg°c @

Total room
Total Air
Equipment people Exposed Exposed wall Q= HC x860 Air volume to be
final air
Capacity for
Sl.no Description Room size (m) Air changes / hour requirement Light (KW) Total heat load (KW) changes /
size (m3)
(m3 /hr)
(KW) (KW) roof (KW) (KW) --------------- conisered
hr
Exhaust fans

40w/sq. m  X SX (T0-Tr)
L B H LxBxH 1 watt/sq.ft 250w/person 50w/sq.m (two sides m3/hr m3/hr
only)
TOTAL Air
TOTAL Air requirement
0.00 requirement heat 0.00
@volume basis
load basis

B EXHAUST Ventilation Selected 240000 240000

1 TG building layout 0.0m lvl 22 10 5 1100 15 16500 2.37 5.00 0.5 0 8.4 16.27 17663.50 18000.00 15 18000.00

2 TG building layout 0.0m lvl -MCC ROOM 22 7 5 770 25 19250 1.66 20.00 0.5 0 7.2 29.36 31877.33 32000.00 25 32000.00

TG building layout Operating floor +5.0m


3 22 10 8.5 1870 15 28050 2.37 1.00 0.5 11 14.28 29.15 31649.36 31650.00 15 31650.00
floor level

4 Equipment room in WTP building 14 5 6 420 15 6300 0.75 2.00 0.5 3.5 5.76 12.51 13587.44 14000.00 15 14000.00

5 WTP MCC panel room 3 4 4 48 25 1200 0.13 1.00 0.5 0.6 0.48 2.71 2941.70 3000.00 25 3000.00

6 TG MCC room panel @4.4m lvl 5 9.5 5 237.5 25 5938 0.51 0.80 0.5 2.375 1 5.19 5631.29 5938.00 25 6000.00

Battery & battery charger room @ 4.4m


7 2.3 5.7 5 65.55 15 983 0.14 0.60 0.25 0.6555 1.6 3.25 3525.29 3525.00 15 3600.00
floor lvl

Raw water cum fire water pump house


8 6.1 11.5 4 280.6 15 4209 0.75 0.00 0.5 3.5075 3.792 8.55 9288.65 9288.65 15 10000.00
room

9 Toilet at 10.0m lvl (Right side of lift) 3.3 2.3 5 37.95 10 380 0.08 0.00 0.25 0.3795 0.66 1.37 1488.88 1481.00 10 1489.00