This document contains status codes and their descriptions used in a production or manufacturing system. Some of the key status codes include: CRTD for created, REL for released, MSCP for capacity shortage, AVAC for availability control active, ESTC for estimated costs, PRT for printed, CNF for confirmed, DLV for delivered, GEN1-GEN4 for general lists printed, OPL1-OPL4 for activity lists printed, SETC for settlement rule created, DSEX for date set by external system, MLTL for multi-level top level, MLBL for multi-level bottom level, MLDI for multi-level dummy info record, BUGD for budgeted, ORAS for order assigned
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
700 views
Status Code Description
This document contains status codes and their descriptions used in a production or manufacturing system. Some of the key status codes include: CRTD for created, REL for released, MSCP for capacity shortage, AVAC for availability control active, ESTC for estimated costs, PRT for printed, CNF for confirmed, DLV for delivered, GEN1-GEN4 for general lists printed, OPL1-OPL4 for activity lists printed, SETC for settlement rule created, DSEX for date set by external system, MLTL for multi-level top level, MLBL for multi-level bottom level, MLDI for multi-level dummy info record, BUGD for budgeted, ORAS for order assigned
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21
Status Code Description
CRTD Created REL Released MSCP Capacity shortage MSPT Material shortage
AVAC Availability control active
ESTC Estimated costs PRT Printed PPRT Part printed CNF Confirmed PCNF Partially confirmed CPCK Capacity checked DLV Delivered DLT Deletion indicator PCST Product costed NCMP Not completed PRC Pre-costed ISSD Goods issued Ntwk header: final NHFD delivery GEN1 General list 1 printed GEN2 General list 2 printed GEN3 General list 3 printed GEN4 General list 4 printed OPL1 Activity list 1 printed OPL2 Activity list 2 printed OPL3 Activity list 3 printed OPL4 Activity list 4 printed Settlement fields SFMT maintained SETC Settlement rule created Date set by external DSEX system MLTL Multi-level: Top level MLBL Multi-level: Bottom level Multi-level: Dummy info MLDI record CNC Costs not current Subordinate order SORL released Subordinate order SOPR printed Subordinate order SOCF confirmed UMGP Rescheduled
Results analysis carried RESA out PRL1 PRT list 1 printed PRL2 PRT list 2 printed PRL3 PRT list 3 printed PRL4 PRT list 4 printed Rescheduling required NBDT (Basic) Rescheduling required NFDT (Frcst) Goods movement in coll. GMCO order Confirmation in coll. CFCO order Sub-operation partially SPCF conf. Sub-operation finally SCNF conf. ISBD Insufficient budgeting RVPS Revenue posted MSPR PRT shortage RVPL Revenue planned FNBL Final billing CRTE Created AVLB Available INST Installed EHIS Entered historically Settlemt rule created SETM manually Summary confirm. SCNF carried out SUST Setup started SUIR Setup interrupted SUFN Setup finished PRST Processing started PRIR Processing interrupted PRFN Processing finished TDST Teardown started TDIR Teardown interrupted TDFN Teardown finished COMO Components for object PRTO PRTs for object CSER Error in cost calculation Allocated to superior ASEQ equipt DSPT Scheduled NTUP Dates are not updated ACTV Active Rental agreements RACR created ACLO Active lease-outs NOLO No lease-outs
RESI Residential Rental Agrmt
COMM Commercial Contract Comm. provisional COPA agrmnt CANC Canceled Rent adjustments RTAP planned THRD Utilized by third parties GRLO Used by group with LO PROP For own use UNOC Unoccupied RENT Intended for rent CRES Created (Standard WBS) Released (Standard RELS WBS)
CLOS Closed (Standard WBS)
GRFL Goods receipt failed IFSL Intended for sale SOLD Sold PURI Intended for purchase PURC Purchased PSLD Partially sold DEMO Demolition PDEM Partially demolished ERUI Economic ruin PECR Partial economic ruin Printout of changes POCR required BTRD Block transaction data DIVI Division declaration Partial division PDIV declaration INMD Inspection made
SECD Security deposit paid out
IFPF Intended for portfolio PORT In portfolio TSOS Task Outstanding TSRL Task Released TSCO Task Completed TSSC Task successful Outstanding task(s) OSTS exist(s) ATCO All Tasks Completed NOTI Notification (internal) NOTE Notification (external) DEFR Defects Recording Asset in construction AUC exists Cost To be costed Cstd Costed Follow-up action FUAC completed Notif. blocked by ARNB archiving
ORD Created from sales order
Created from shipment SHPT doc. PREP Prepared REJC Rejected NPRT PRT not ready for use Control Recipe CRAB Discarded
ILNC Inspection lot not created
AUSS Scrap determined ESTO In the warehouse SLOR Assigned in sales order
EDEL Assigned in delivery note
Assigned in service ESER contract ECUS At customer site EINS In Review ELOK Locked ETRA In transport EAUS From warehouse HUAS Handling Unit Assigned PIAC Inventory Active Insp. completion w/o PAOR confirm. PREQ Plan/specific. required Characterist. must be CHCR created
SPRQ Quantity posting required
LTIN Long-term inspection Plan/specification PASG assigned Insp. characteristics CCTD created CALC Sample calculated QLCH Quality level relevant SKIP Skip lot Sample drawing instr. PRSI printed Inspection instruction PRII printed INSP Inspection active RREC Results confirmed DEF Defects were recorded SSAP Object created Short-term insp. STIC completed All inspections ICCO completed Usage decision has been UD made SPST Stock posting started
SPCO Stock posting completed
STUP Statistics updated QLUP Quality level updated Quality info record IRUP updated LTCA Lot canceled ARBL Blocked for Archiving ARCH Lot archived REO3 Lot detail data deleted
REO2 Lot sample data deleted
Charact. + operations REO1 deleted SUB Transmit to subsystem IRCH Q-info record changed Lot marked for MCAN cancellation MSUB Marked for subsystem
MtoO Make-to-order production
NoMP No make-to-order prod. HCNF Order header confirmed Confirmation issued CPIS components NOPR No PRTs
NOCP No material components
NOTR No trigger points CRCR Control recipe created NCHK Not checked Not scheduled (forecast NSCH dates) SPLT Split PSPL Partially split ASGN Assigned PTAS Partially assigned PTDS Partially dispatched Error creating transfer ERTR reqmnt
ITAA Item account assignment
CECR Check ECR CHKD ECR Checked ECRA ECR Approved ECOP ECO to be processed ECPC ECO partially confirmed ECCF ECO confirmed ECCM ECO completed ECOR ECO released Object: insp. req. for ECIR ECR
CCO1 Object: change possible
Object: change not CCO2 necessary Object: change not CCO3 possible
CCOB Object: to be processed
CCOI Object: in preparation Object: change CCOA completed
CCOF Object: change released
CRFI Control recipe finished CCPO All objects checked CCFO All objects released
WCRE Work center until release
SUPF Setup partially finished Processing partially PPF finished Teardown partially TDPF finished BLLS Boycott list EXLS Export control Locked for system CCSL changes
CCUL Locked for user changes
ORRQ Order record required ORAC Order record archived ORTE Order record terminated ILAS Inspection lot assigned Planned InspCharacs. ICHA allocated QMDA QM data recorded Batch assignment BREQ required BASG Batch assigned
CUGT Copy attribute analysis Error when processing FKTF function Confirmation with RCKP personal ID Certif.confirmation CTCM missing RA data in object RAOC currency RA data w/o object RAWO currency UDRE Usage decision reset Secondary resource part SRPC confd Secondary resource SRCF confirmed VOBJ Subobject exists ZUOD Assigned REJT ECR Rejected ICPL ECO incomplete PERR ECO: processing errors
CHER Object: errors in change
Insp.lot cntd in order ILOR record Not available at request NAVD date Collect. order dates not CONC curr. FTC2 Control: Embargo Control: Missing master FTC3 data FTC4 Control: Permission Transfer prices for TPA agreements INAC Object Deactivated
GMPS Goods movement posted
APG Approval granted APGS Single approval granted Based on approved APRC recipe APNG Approval not granted Process instructions PIGN generated APRS Approval withdrawn OPGN Operation generated GBST Confirmed GBTS Counterconfirmed BBGT Accounted BUGÜ Exercised BRFL Expired AKNI Knocked in AKNO Knocked out AO01 Availability check error AO02 Do availability check AO03 Delivery groups present MACM Material committed ASSB Assembly lock ECOC ECO complete CCRD Case created Case blocked for CBLK settlement SETT Settled CHKD Tested FAPP For approval MCRD Measure created RBMS Replaced by measure MSPL Planning for task REJD Rejected Depreciation simulation DEPS avail.
NEWQ New quantity calculation
Phys. sample no longer USED exists STRD Sample was stored APRV Approved Progress confirmation PROG (MST) Certificate receipt CROK confirmed LBPR Label printed FM account assignmt FMAI incomplete Order to be handled in BCRQ batches Batch assignment BASC complete One dig. signature SIG1 missing Two dig. signatures SIG2 missing Three dig. signatures SIG3 missing Four dig. signatures SIG4 missing POAR Part objects archived Based on approved insp. APIP plan Ext. operatn partly EOPD delivered External operation EODL delivered BRAR Batch record archived SOAS Sales order assigned Lot locked for batch LOLK record SerialNo maintenance SERM required BNAS Batch not assigned IREP Under repair TREP Partially repaired REPA Repaired Business decision BDRQ required
BDMD Business decision made
BRRQ Batch record required NOCH Changes forbidden Effectivity parameter CEFF copied Manual adjustment MADJ necessary Release in network taken RlNe place QUCR Quotation created QUAC Quotation accepted INVD Invoiced PTBL partially billed Confirm./goods mvmnt CGFB forbidden REPR Repairs processing PCMN Production campaign Product cost collector PCC used ITG Inital tagging status BTG Tag PTAG Tag printed ETG Tagged BUG Untag EUG Untagged BTUG Untag Temporarily ETUG Temporarily Untagged LBNP Label not printed RET Return
CNOK Credit limit check invalid
Credit limit check CCOK successful PAGE Paging occurs Advance shipment ADVS occurred CONF Conflict Work Clearance WCM Management Mat.availability not MANC checked Capacity avail.not CANC checked PRT availability not PRTA checked New dummy quantity DNEW calculation UNT Untaggable EXEC Released for execution WOCO Work completed PROC Processing TENT Temporary entry TEST Test cycle Block technical BLTC completion PTST Test tag printed VBCR Batch record created VBAP Batch record approved Batch rec. partially VBPA approved VBAR Batch record archived Batch rec. partially VBPC archived Batch rec. contains VBDE deviations Batch rec.: new version VBAW exists CR Created CO Conference LO Locked RE Released
HUM Handling units assigned
CONX Fix configuration CHNG Change mode POST Postscript HI Historical AC Active IC Inactive OP Created IP In Process CL Closed DE Data Entered In Process Outside IPEX EH&S DLEX Deleted Outside EH&S FINV Further Investigation REVS Reversed PO Posted ACPT Order accepted ONHO On Hold Changed by external EXTS system
NMAT No material components
SPLT Split CSPL Created by splitting Ref. object under UNCO construction From created to CRTC tech.completed Automatic deletion ADRJ rejected MISM Mismeasurement NOME No Measurement PTME Partial Measurement Measurement Results MERR Recorded SUPP Supplement
QUOT No material components
Assigned in quote QUBP (bump)
SLBP Assigned in order (bump)
Assigned in quote (vers. QUVC chg.) Assigned in order (vers. SLVC chg.) SPTT License split Operation Quantities QADJ Adjusted PHEX Physically Exists WHSE In Warehouse PLND Planned LOAD Loaded UNLD Unloaded PPCm PPPI complete LOCK Locked WGHD Weighed RESV Reserved for PP PPPI reservation for GI PPGI post.
SU for Directly Assigned DRCT Costs No Automatic NACO Confirmation INIV In Inventory INVE Physically Inventoried OWNS Owner Settlement Relevant to Results RRA Analysis SEPO Separate Order ASIM Simulation AORD Order AVER Contract AKUE Notice AZUR To be settled GZBE To be confirmed Counterconfirmation GZER required AZAE Changed AZST Reversed DELD Deleted EXPD Expired INIT Initial AFIX Fixing FIXD Fixing executed ROLL Rollover PREM Premature Settlement IRAD Interest rate adjustment NOTG Notice Given AANG Offer IP In Process FR For Release RLRQ Release Required RLRJ Release rejected MKOS Cost Collector Created External Conv.of EXPL Planned Order NC Noncritical Change RE Released IOPN IS-T: Opened IINP IS-T: Being processed ICMP IS-T: Completed ICLK IS-T: Complete lock IPLK IS-T: Partial lock IICA IS-T: Item cancelled IS-T: Operations IOIN interruption IINP IS-T: Being processed IACT IS-T: Active PROT Operational protection PWP Work permit printed VAL Valuated MOBI Data on Mobile Device PUSH Push Effected PACC Push Accepted PREJ Push Rejected Push Maximum Time PEXP Expired PRST Push Reset PPRJ Push Partially Rejected SIGA Signature Attached Case Marked Suppl. CMSI Invoice XSpr Control recipe created
XSez Control recipe in process
XSgn XStep Generated Int. rate adjustment IRAE executed Int. rate adjustment IRAC changed Int. Rate Adjustment IRAR Reversed AFWD Maturity of forward WEC: Date Adjustment WCDR Requested WEC: Date Adjustment WCDC Completed WEC: Date Adjustment WCDP Pending RSRV Reserved NEWQ New NOPR In Process MADJ Completed EXPR External Processing QUIT Confirmed DELF Deletion indicator ARCH Blocked for Archiving
FLEX Specifications Assigned
External Processing EXKU Customer 1100 Can be archived 1101 Archived 1102 Can be deleted OREL Released OCOM Completed OASS Assigned OINF Informed OREJ Rejected OACC Accepted OCUS At customer site BLKE Blocked (Error) BLKW Blocked (Warning) CDEN Flagged for Archiving CGBL Locked CCOM Do Not Contact CDEL Marked for deletion ARCR Can be archived DelA Archived DELT Deleted LOCK Locked PARC To archive INAC Inactive NREL Not Released Pld Planned Rqst Requested App Approved Rej Rejected Act Active Obsl Obsolete MvtC Reused Order AM00 Being Created AM01 In Process AM02 Released AM03 Completed AM04 Locked AM05 To Be Archived AM06 Archived AM07 To Be Approved AM08 Rejected AM09 Approved AM10 Deletion Flag AM11 Canceled AM12 Unplanned Audit(s) Question List(s) AM13 Assigned AM14 Download Completed AM15 Confirmed AM16 Report Created AM17 Signature Provided AM18 Outstanding Actions AM19 Actions Completed Completed w. AM20 Outstanding Actns AM21 Created AM22 Outstanding AM23 Forced Completion AM24 Valuation Executed Changeable copy to be SDVC checked SDVY Copy checked - OK SDVN Copy checked - not OK PLAN Planned APPL Requested Released by Material RELE Owner APPR Approved LOCK Locked DELP Flagged for Deletion DELA Deletion Requested OBSO Obsolete REJE Rejected APLA Planned AAPP Requested AAPR Approved ALOC Locked AOBS Obsolete AREJ Rejected DPLA Planned DAPP Requested Released by Material DREL Owner DAPR Approved DLOC Locked DDLP Flagged for Deletion DDLA Deletion Requested DOBS Obsolete DREJ Rejected EPLA Planned EAPP Requested Released by Material EREL Owner EAPR Approved ELOC Locked EDLP Flagged for Deletion EDLA Deletion Requested EOBS Obsolete EREJ Rejected FPLA Planned FAPP Requested Released by Material FREL Owner FAPR Approved FLOC Locked FDLP Flagged for Deletion FDLA Deletion Requested FOBS Obsolete FREJ Rejected GPLA Planned GAPP Requested GAPR Approved GREJ Rejected GOBS Obsolete GLOC Locked HPLA Planned HAPP Requested HAPR Approved HREJ Rejected HACT Active HOBS Obsolete CNEW In Process CREL Released CLOC Locked CINC Inconsistent CDIS Distributable ARCV To Archive NEW Trial Created DECL Trial Definition Closed EXPO Trial Data Exported PLOR Planned Order Assigned Master Recipe MRCP Generated
CONV Trial Converted QMCL QM Planning Closed Creation of Change Docs CHGD Active FFUE From Follow-Up Entry From History New FHNC Construction In History New IHNC Construction GMDR Initial draft GMPR Proposal GMAP Application GMAW Award GMCL Closing GMCX Closed GMCA Cancelled Rcp0 In process Rcp1 Processing Closed Rcp2 Rejected Rcp3 Released Rcp4 Released for Scope Rcp5 Inactive Rcp6 Obsolete SPEC RE:Spec home CONT RE:Contingency order RE: Re-Sell to new RESL customer Process Order Created CSPT by Split Process order was MRGM merged Process order merged MRGS an order RSTR Restart RWRK Rework Insert
SPL Process Order was Split
Process Order Split SPTM Multiple NEWO New/In Process RELO Released CLOS Completed DIST Distributable NEW New Act Active REL Released CHK For Checking END Completed NEWR ECR Processible ACCE ECR Approved REVI ECR Rejected CLOR ECR Completed CREA New IP-Data CGAT Changed in Revision System Status : Change CGMN Manual System Status : INPR Inprocess System Status : CMTD Completed DELD Deleted in Revision HOLD System Status : Hold CBEX CM: Baseline exploded CMOB CM: Baseline obsolet CM: Background CMBG processing MEBS MEB-Controlled ORCR Order created by MEB OCRR Order creation required TBUS To be Used Master Data Creation MDCI Initiated Master Data Created / MDCU Updated Master Data Creation MDFL Failed NUSD Not Used BLFA Set Archive Indicator DFRD Deferred COCE Completion Certified Completion Partially CPCE Certified Meas. Doc. Creation MDRQ Required DOCC Document Created COMP Completed CACL Cancelled INPC In Process XR01 In Process XR02 Rejected XR03 Release for Test XR04 Released XR05 Obsolete XR06 Flagged for Archiving XR07 Archived XR20 Approved XR21 Discarded Current Signature XR40 Process UPNW Created UPSV Saved UPRL Released UPSD Distributed UPRC Received UPAP Approved UPRJ Rejected UPER Errors found UPPO Updated UPIN Partially Posted UPSP Partially Sent UPSE Error Sending Data INTR In transit CKIN Checked in LOST Load started LOPF Load partly finished LOCM Load complete ULST Unload started ULPF Unload Partly finished ULCO Unload complete MVPR Move process WEPR Weigh process AVWE Available for weight AVLO Available for load AVUL Available for unload AVMO Available for move AVCO Available to check-out WACR WA-PRO: Created WALO WA-PRO: Locked WACS WA-PRO: Closed crea Created actv Active lega Legally Active inac Inactive calc Calculation Relevant
WADL WA-PRO: To Be Deleted
LRCL Land Register Closed PRCS Parcel Ceased to Exist liqi In Liquidation liqd Liquidated OFRJ Rejected RELF Release Forbidden INIT Initial Status IBDE Deletion flag IBIN Deactivate IB04 Avail. IB05 Avail. Service Entry Sheet CRE created Service Entry Sheet SREL released Service Entry Sheet CANL cancelled CCIN new CCAK Released CCLO Blocked CCDL Logically Deleted CCAR Ready for Archiving INIT New DRFT Draft REVW Review REWK Rework IP In Process OPEN Open RSLV Resolved CLSD Closed REAS Reassessment VLDT Validated SBMT Submitted Test In Process ATCL Auto Closed SHIP Shipping taken place TVER Partial Shipping KLAU Clinical Order Created Basic Med. Doc. in MDIP Process Basic Med. Doc. MDCP Complete Basic Med. Doc. to Be MDTC Checked OINA Inactive OACT Active DFS Deletion flag set Asgd Allocated VNE Value does not exist VMSG Value missing VVAK Valid value VEST Value was estimated VI Value implausible Value entered/changed VCHG manually
VREL Value has been released
VLCK Value is locked VPRO Value is protected VARC Value was activated VEPL Value was extrapolated VINT Value was interpolated Val. Manually Chngd VaCh Externally Version Not In Validity VNVP Period RINA Route Inactive RACT Route Active DFLS Deletion Flag Set DINS Deletion Indicator Set RIPR Route in Processing Waste Disposal Order HANG Created Waste Disposal Order HPLN Planned Waste Disposal Order HAUS Output HCOP CO Posting Deletion Flag for WDO HLVM Header PANG WDO Item Created PAUS WDO Item Output PPZM Positive Confirmation PNZM Negative Confirmation PZUR WDO Item Postponed PABG WDO Item Billed Debit Memo Request PLST Generated PBEH Container Transport Container PBCH Del/Remove/Replace. Deletion Flag for WDO HLKZ Header