0% found this document useful (0 votes)
700 views

Status Code Description

This document contains status codes and their descriptions used in a production or manufacturing system. Some of the key status codes include: CRTD for created, REL for released, MSCP for capacity shortage, AVAC for availability control active, ESTC for estimated costs, PRT for printed, CNF for confirmed, DLV for delivered, GEN1-GEN4 for general lists printed, OPL1-OPL4 for activity lists printed, SETC for settlement rule created, DSEX for date set by external system, MLTL for multi-level top level, MLBL for multi-level bottom level, MLDI for multi-level dummy info record, BUGD for budgeted, ORAS for order assigned

Uploaded by

pramod
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
700 views

Status Code Description

This document contains status codes and their descriptions used in a production or manufacturing system. Some of the key status codes include: CRTD for created, REL for released, MSCP for capacity shortage, AVAC for availability control active, ESTC for estimated costs, PRT for printed, CNF for confirmed, DLV for delivered, GEN1-GEN4 for general lists printed, OPL1-OPL4 for activity lists printed, SETC for settlement rule created, DSEX for date set by external system, MLTL for multi-level top level, MLBL for multi-level bottom level, MLDI for multi-level dummy info record, BUGD for budgeted, ORAS for order assigned

Uploaded by

pramod
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

Status Code Description

CRTD Created
REL Released
MSCP Capacity shortage
MSPT Material shortage

AVAC Availability control active


ESTC Estimated costs
PRT Printed
PPRT Part printed
CNF Confirmed
PCNF Partially confirmed
CPCK Capacity checked
DLV Delivered
DLT Deletion indicator
PCST Product costed
NCMP Not completed
PRC Pre-costed
ISSD Goods issued
Ntwk header: final
NHFD delivery
GEN1 General list 1 printed
GEN2 General list 2 printed
GEN3 General list 3 printed
GEN4 General list 4 printed
OPL1 Activity list 1 printed
OPL2 Activity list 2 printed
OPL3 Activity list 3 printed
OPL4 Activity list 4 printed
Settlement fields
SFMT maintained
SETC Settlement rule created
Date set by external
DSEX system
MLTL Multi-level: Top level
MLBL Multi-level: Bottom level
Multi-level: Dummy info
MLDI record
CNC Costs not current
Subordinate order
SORL released
Subordinate order
SOPR printed
Subordinate order
SOCF confirmed
UMGP Rescheduled

CONI Configuration incomplete


PREL Partially released
LKD Locked
TECO Technically completed
CLSD Closed
Open reservations
ORSP posted
STND Standard confirmation
MILE Milestone confirmation
MCNF Manually confirmed
Activity account
ACAS assignment
MSCP Capacity shortage
RELR Release rejected
VCAL Variances calculated
Rescheduling (Actl.)
NDAT required
CSPS Costs posted
PLCS Planned costs
PLLK Planning locked
DDLK Date definition locked
Budget management
BMLK locked
Account assignment
AALK locked
MDLK Master data locked
APPR Approved
BUDG Budgeted
OSNO Outstanding notification
NOPO Notification postponed
NOPR Notification in process
ORAS Order assigned
NOCO Notification completed
NOPT Notification printed
PDLV Partially delivered
WDFL Withdrawal failed
DLFL Deletion Flag
Transaction LVMS not
NOLV permitted

COL1 Component list 1 printed

COL2 Component list 2 printed

COL3 Component list 3 printed

COL4 Component list 4 printed


Results analysis carried
RESA out
PRL1 PRT list 1 printed
PRL2 PRT list 2 printed
PRL3 PRT list 3 printed
PRL4 PRT list 4 printed
Rescheduling required
NBDT (Basic)
Rescheduling required
NFDT (Frcst)
Goods movement in coll.
GMCO order
Confirmation in coll.
CFCO order
Sub-operation partially
SPCF conf.
Sub-operation finally
SCNF conf.
ISBD Insufficient budgeting
RVPS Revenue posted
MSPR PRT shortage
RVPL Revenue planned
FNBL Final billing
CRTE Created
AVLB Available
INST Installed
EHIS Entered historically
Settlemt rule created
SETM manually
Summary confirm.
SCNF carried out
SUST Setup started
SUIR Setup interrupted
SUFN Setup finished
PRST Processing started
PRIR Processing interrupted
PRFN Processing finished
TDST Teardown started
TDIR Teardown interrupted
TDFN Teardown finished
COMO Components for object
PRTO PRTs for object
CSER Error in cost calculation
Allocated to superior
ASEQ equipt
DSPT Scheduled
NTUP Dates are not updated
ACTV Active
Rental agreements
RACR created
ACLO Active lease-outs
NOLO No lease-outs

RESI Residential Rental Agrmt


COMM Commercial Contract
Comm. provisional
COPA agrmnt
CANC Canceled
Rent adjustments
RTAP planned
THRD Utilized by third parties
GRLO Used by group with LO
PROP For own use
UNOC Unoccupied
RENT Intended for rent
CRES Created (Standard WBS)
Released (Standard
RELS WBS)

CLOS Closed (Standard WBS)


GRFL Goods receipt failed
IFSL Intended for sale
SOLD Sold
PURI Intended for purchase
PURC Purchased
PSLD Partially sold
DEMO Demolition
PDEM Partially demolished
ERUI Economic ruin
PECR Partial economic ruin
Printout of changes
POCR required
BTRD Block transaction data
DIVI Division declaration
Partial division
PDIV declaration
INMD Inspection made

SECD Security deposit paid out


IFPF Intended for portfolio
PORT In portfolio
TSOS Task Outstanding
TSRL Task Released
TSCO Task Completed
TSSC Task successful
Outstanding task(s)
OSTS exist(s)
ATCO All Tasks Completed
NOTI Notification (internal)
NOTE Notification (external)
DEFR Defects Recording
Asset in construction
AUC exists
Cost To be costed
Cstd Costed
Follow-up action
FUAC completed
Notif. blocked by
ARNB archiving

ORD Created from sales order


Created from shipment
SHPT doc.
PREP Prepared
REJC Rejected
NPRT PRT not ready for use
Control Recipe
CRAB Discarded

ILNC Inspection lot not created


AUSS Scrap determined
ESTO In the warehouse
SLOR Assigned in sales order

EDEL Assigned in delivery note


Assigned in service
ESER contract
ECUS At customer site
EINS In Review
ELOK Locked
ETRA In transport
EAUS From warehouse
HUAS Handling Unit Assigned
PIAC Inventory Active
Insp. completion w/o
PAOR confirm.
PREQ Plan/specific. required
Characterist. must be
CHCR created

SPRQ Quantity posting required


LTIN Long-term inspection
Plan/specification
PASG assigned
Insp. characteristics
CCTD created
CALC Sample calculated
QLCH Quality level relevant
SKIP Skip lot
Sample drawing instr.
PRSI printed
Inspection instruction
PRII printed
INSP Inspection active
RREC Results confirmed
DEF Defects were recorded
SSAP Object created
Short-term insp.
STIC completed
All inspections
ICCO completed
Usage decision has been
UD made
SPST Stock posting started

SPCO Stock posting completed


STUP Statistics updated
QLUP Quality level updated
Quality info record
IRUP updated
LTCA Lot canceled
ARBL Blocked for Archiving
ARCH Lot archived
REO3 Lot detail data deleted

REO2 Lot sample data deleted


Charact. + operations
REO1 deleted
SUB Transmit to subsystem
IRCH Q-info record changed
Lot marked for
MCAN cancellation
MSUB Marked for subsystem

MtoO Make-to-order production


NoMP No make-to-order prod.
HCNF Order header confirmed
Confirmation issued
CPIS components
NOPR No PRTs

NOCP No material components


NOTR No trigger points
CRCR Control recipe created
NCHK Not checked
Not scheduled (forecast
NSCH dates)
SPLT Split
PSPL Partially split
ASGN Assigned
PTAS Partially assigned
PTDS Partially dispatched
Error creating transfer
ERTR reqmnt

ITAA Item account assignment


CECR Check ECR
CHKD ECR Checked
ECRA ECR Approved
ECOP ECO to be processed
ECPC ECO partially confirmed
ECCF ECO confirmed
ECCM ECO completed
ECOR ECO released
Object: insp. req. for
ECIR ECR

CCO1 Object: change possible


Object: change not
CCO2 necessary
Object: change not
CCO3 possible

CCOB Object: to be processed


CCOI Object: in preparation
Object: change
CCOA completed

CCOF Object: change released


CRFI Control recipe finished
CCPO All objects checked
CCFO All objects released

WCRE Work center until release


SUPF Setup partially finished
Processing partially
PPF finished
Teardown partially
TDPF finished
BLLS Boycott list
EXLS Export control
Locked for system
CCSL changes

CCUL Locked for user changes


ORRQ Order record required
ORAC Order record archived
ORTE Order record terminated
ILAS Inspection lot assigned
Planned InspCharacs.
ICHA allocated
QMDA QM data recorded
Batch assignment
BREQ required
BASG Batch assigned

VACT Var. activity partial conf.


VACE Var. activity final. conf.
CAPP CAPP calculated
CLAS Complete Classification

CLQM Shortterm Classification


CUGT Copy attribute analysis
Error when processing
FKTF function
Confirmation with
RCKP personal ID
Certif.confirmation
CTCM missing
RA data in object
RAOC currency
RA data w/o object
RAWO currency
UDRE Usage decision reset
Secondary resource part
SRPC confd
Secondary resource
SRCF confirmed
VOBJ Subobject exists
ZUOD Assigned
REJT ECR Rejected
ICPL ECO incomplete
PERR ECO: processing errors

CHER Object: errors in change


Insp.lot cntd in order
ILOR record
Not available at request
NAVD date
Collect. order dates not
CONC curr.
FTC2 Control: Embargo
Control: Missing master
FTC3 data
FTC4 Control: Permission
Transfer prices for
TPA agreements
INAC Object Deactivated

GMPS Goods movement posted


APG Approval granted
APGS Single approval granted
Based on approved
APRC recipe
APNG Approval not granted
Process instructions
PIGN generated
APRS Approval withdrawn
OPGN Operation generated
GBST Confirmed
GBTS Counterconfirmed
BBGT Accounted
BUGÜ Exercised
BRFL Expired
AKNI Knocked in
AKNO Knocked out
AO01 Availability check error
AO02 Do availability check
AO03 Delivery groups present
MACM Material committed
ASSB Assembly lock
ECOC ECO complete
CCRD Case created
Case blocked for
CBLK settlement
SETT Settled
CHKD Tested
FAPP For approval
MCRD Measure created
RBMS Replaced by measure
MSPL Planning for task
REJD Rejected
Depreciation simulation
DEPS avail.

NEWQ New quantity calculation


Phys. sample no longer
USED exists
STRD Sample was stored
APRV Approved
Progress confirmation
PROG (MST)
Certificate receipt
CROK confirmed
LBPR Label printed
FM account assignmt
FMAI incomplete
Order to be handled in
BCRQ batches
Batch assignment
BASC complete
One dig. signature
SIG1 missing
Two dig. signatures
SIG2 missing
Three dig. signatures
SIG3 missing
Four dig. signatures
SIG4 missing
POAR Part objects archived
Based on approved insp.
APIP plan
Ext. operatn partly
EOPD delivered
External operation
EODL delivered
BRAR Batch record archived
SOAS Sales order assigned
Lot locked for batch
LOLK record
SerialNo maintenance
SERM required
BNAS Batch not assigned
IREP Under repair
TREP Partially repaired
REPA Repaired
Business decision
BDRQ required

BDMD Business decision made


BRRQ Batch record required
NOCH Changes forbidden
Effectivity parameter
CEFF copied
Manual adjustment
MADJ necessary
Release in network taken
RlNe place
QUCR Quotation created
QUAC Quotation accepted
INVD Invoiced
PTBL partially billed
Confirm./goods mvmnt
CGFB forbidden
REPR Repairs processing
PCMN Production campaign
Product cost collector
PCC used
ITG Inital tagging status
BTG Tag
PTAG Tag printed
ETG Tagged
BUG Untag
EUG Untagged
BTUG Untag Temporarily
ETUG Temporarily Untagged
LBNP Label not printed
RET Return

CNOK Credit limit check invalid


Credit limit check
CCOK successful
PAGE Paging occurs
Advance shipment
ADVS occurred
CONF Conflict
Work Clearance
WCM Management
Mat.availability not
MANC checked
Capacity avail.not
CANC checked
PRT availability not
PRTA checked
New dummy quantity
DNEW calculation
UNT Untaggable
EXEC Released for execution
WOCO Work completed
PROC Processing
TENT Temporary entry
TEST Test cycle
Block technical
BLTC completion
PTST Test tag printed
VBCR Batch record created
VBAP Batch record approved
Batch rec. partially
VBPA approved
VBAR Batch record archived
Batch rec. partially
VBPC archived
Batch rec. contains
VBDE deviations
Batch rec.: new version
VBAW exists
CR Created
CO Conference
LO Locked
RE Released

HUM Handling units assigned


CONX Fix configuration
CHNG Change mode
POST Postscript
HI Historical
AC Active
IC Inactive
OP Created
IP In Process
CL Closed
DE Data Entered
In Process Outside
IPEX EH&S
DLEX Deleted Outside EH&S
FINV Further Investigation
REVS Reversed
PO Posted
ACPT Order accepted
ONHO On Hold
Changed by external
EXTS system

NMAT No material components


SPLT Split
CSPL Created by splitting
Ref. object under
UNCO construction
From created to
CRTC tech.completed
Automatic deletion
ADRJ rejected
MISM Mismeasurement
NOME No Measurement
PTME Partial Measurement
Measurement Results
MERR Recorded
SUPP Supplement

QUOT No material components


Assigned in quote
QUBP (bump)

SLBP Assigned in order (bump)


Assigned in quote (vers.
QUVC chg.)
Assigned in order (vers.
SLVC chg.)
SPTT License split
Operation Quantities
QADJ Adjusted
PHEX Physically Exists
WHSE In Warehouse
PLND Planned
LOAD Loaded
UNLD Unloaded
PPCm PPPI complete
LOCK Locked
WGHD Weighed
RESV Reserved for PP
PPPI reservation for GI
PPGI post.

PPSC PPPI sequence checked


PSTD Goods Issue Posted
DLTD Deleted
SGPR Visually Checked
APRQ Approval: Required
APOK Approval: OK
APRF Approval: Refused
CMSP CM: Object locked
CANG CM: Created
CBER CM: Baselining allowed
CABG CM: Object closed
CPER CM: Process allowed

CBRE CM: Baseline requested


CBAS Baselined (fixed)

CFVE Released for distribution


SU for Directly Assigned
DRCT Costs
No Automatic
NACO Confirmation
INIV In Inventory
INVE Physically Inventoried
OWNS Owner Settlement
Relevant to Results
RRA Analysis
SEPO Separate Order
ASIM Simulation
AORD Order
AVER Contract
AKUE Notice
AZUR To be settled
GZBE To be confirmed
Counterconfirmation
GZER required
AZAE Changed
AZST Reversed
DELD Deleted
EXPD Expired
INIT Initial
AFIX Fixing
FIXD Fixing executed
ROLL Rollover
PREM Premature Settlement
IRAD Interest rate adjustment
NOTG Notice Given
AANG Offer
IP In Process
FR For Release
RLRQ Release Required
RLRJ Release rejected
MKOS Cost Collector Created
External Conv.of
EXPL Planned Order
NC Noncritical Change
RE Released
IOPN IS-T: Opened
IINP IS-T: Being processed
ICMP IS-T: Completed
ICLK IS-T: Complete lock
IPLK IS-T: Partial lock
IICA IS-T: Item cancelled
IS-T: Operations
IOIN interruption
IINP IS-T: Being processed
IACT IS-T: Active
PROT Operational protection
PWP Work permit printed
VAL Valuated
MOBI Data on Mobile Device
PUSH Push Effected
PACC Push Accepted
PREJ Push Rejected
Push Maximum Time
PEXP Expired
PRST Push Reset
PPRJ Push Partially Rejected
SIGA Signature Attached
Case Marked Suppl.
CMSI Invoice
XSpr Control recipe created

XSez Control recipe in process


XSgn XStep Generated
Int. rate adjustment
IRAE executed
Int. rate adjustment
IRAC changed
Int. Rate Adjustment
IRAR Reversed
AFWD Maturity of forward
WEC: Date Adjustment
WCDR Requested
WEC: Date Adjustment
WCDC Completed
WEC: Date Adjustment
WCDP Pending
RSRV Reserved
NEWQ New
NOPR In Process
MADJ Completed
EXPR External Processing
QUIT Confirmed
DELF Deletion indicator
ARCH Blocked for Archiving

FLEX Specifications Assigned


External Processing
EXKU Customer
1100 Can be archived
1101 Archived
1102 Can be deleted
OREL Released
OCOM Completed
OASS Assigned
OINF Informed
OREJ Rejected
OACC Accepted
OCUS At customer site
BLKE Blocked (Error)
BLKW Blocked (Warning)
CDEN Flagged for Archiving
CGBL Locked
CCOM Do Not Contact
CDEL Marked for deletion
ARCR Can be archived
DelA Archived
DELT Deleted
LOCK Locked
PARC To archive
INAC Inactive
NREL Not Released
Pld Planned
Rqst Requested
App Approved
Rej Rejected
Act Active
Obsl Obsolete
MvtC Reused Order
AM00 Being Created
AM01 In Process
AM02 Released
AM03 Completed
AM04 Locked
AM05 To Be Archived
AM06 Archived
AM07 To Be Approved
AM08 Rejected
AM09 Approved
AM10 Deletion Flag
AM11 Canceled
AM12 Unplanned Audit(s)
Question List(s)
AM13 Assigned
AM14 Download Completed
AM15 Confirmed
AM16 Report Created
AM17 Signature Provided
AM18 Outstanding Actions
AM19 Actions Completed
Completed w.
AM20 Outstanding Actns
AM21 Created
AM22 Outstanding
AM23 Forced Completion
AM24 Valuation Executed
Changeable copy to be
SDVC checked
SDVY Copy checked - OK
SDVN Copy checked - not OK
PLAN Planned
APPL Requested
Released by Material
RELE Owner
APPR Approved
LOCK Locked
DELP Flagged for Deletion
DELA Deletion Requested
OBSO Obsolete
REJE Rejected
APLA Planned
AAPP Requested
AAPR Approved
ALOC Locked
AOBS Obsolete
AREJ Rejected
DPLA Planned
DAPP Requested
Released by Material
DREL Owner
DAPR Approved
DLOC Locked
DDLP Flagged for Deletion
DDLA Deletion Requested
DOBS Obsolete
DREJ Rejected
EPLA Planned
EAPP Requested
Released by Material
EREL Owner
EAPR Approved
ELOC Locked
EDLP Flagged for Deletion
EDLA Deletion Requested
EOBS Obsolete
EREJ Rejected
FPLA Planned
FAPP Requested
Released by Material
FREL Owner
FAPR Approved
FLOC Locked
FDLP Flagged for Deletion
FDLA Deletion Requested
FOBS Obsolete
FREJ Rejected
GPLA Planned
GAPP Requested
GAPR Approved
GREJ Rejected
GOBS Obsolete
GLOC Locked
HPLA Planned
HAPP Requested
HAPR Approved
HREJ Rejected
HACT Active
HOBS Obsolete
CNEW In Process
CREL Released
CLOC Locked
CINC Inconsistent
CDIS Distributable
ARCV To Archive
NEW Trial Created
DECL Trial Definition Closed
EXPO Trial Data Exported
PLOR Planned Order Assigned
Master Recipe
MRCP Generated

PROR Process Order Assigned


Results
RESU Entered/Imported
RECF Results Confirmed
CLOS Trial Closed

JOB Background Processing


CONV Trial Converted
QMCL QM Planning Closed
Creation of Change Docs
CHGD Active
FFUE From Follow-Up Entry
From History New
FHNC Construction
In History New
IHNC Construction
GMDR Initial draft
GMPR Proposal
GMAP Application
GMAW Award
GMCL Closing
GMCX Closed
GMCA Cancelled
Rcp0 In process
Rcp1 Processing Closed
Rcp2 Rejected
Rcp3 Released
Rcp4 Released for Scope
Rcp5 Inactive
Rcp6 Obsolete
SPEC RE:Spec home
CONT RE:Contingency order
RE: Re-Sell to new
RESL customer
Process Order Created
CSPT by Split
Process order was
MRGM merged
Process order merged
MRGS an order
RSTR Restart
RWRK Rework Insert

SPL Process Order was Split


Process Order Split
SPTM Multiple
NEWO New/In Process
RELO Released
CLOS Completed
DIST Distributable
NEW New
Act Active
REL Released
CHK For Checking
END Completed
NEWR ECR Processible
ACCE ECR Approved
REVI ECR Rejected
CLOR ECR Completed
CREA New IP-Data
CGAT Changed in Revision
System Status : Change
CGMN Manual
System Status :
INPR Inprocess
System Status :
CMTD Completed
DELD Deleted in Revision
HOLD System Status : Hold
CBEX CM: Baseline exploded
CMOB CM: Baseline obsolet
CM: Background
CMBG processing
MEBS MEB-Controlled
ORCR Order created by MEB
OCRR Order creation required
TBUS To be Used
Master Data Creation
MDCI Initiated
Master Data Created /
MDCU Updated
Master Data Creation
MDFL Failed
NUSD Not Used
BLFA Set Archive Indicator
DFRD Deferred
COCE Completion Certified
Completion Partially
CPCE Certified
Meas. Doc. Creation
MDRQ Required
DOCC Document Created
COMP Completed
CACL Cancelled
INPC In Process
XR01 In Process
XR02 Rejected
XR03 Release for Test
XR04 Released
XR05 Obsolete
XR06 Flagged for Archiving
XR07 Archived
XR20 Approved
XR21 Discarded
Current Signature
XR40 Process
UPNW Created
UPSV Saved
UPRL Released
UPSD Distributed
UPRC Received
UPAP Approved
UPRJ Rejected
UPER Errors found
UPPO Updated
UPIN Partially Posted
UPSP Partially Sent
UPSE Error Sending Data
INTR In transit
CKIN Checked in
LOST Load started
LOPF Load partly finished
LOCM Load complete
ULST Unload started
ULPF Unload Partly finished
ULCO Unload complete
MVPR Move process
WEPR Weigh process
AVWE Available for weight
AVLO Available for load
AVUL Available for unload
AVMO Available for move
AVCO Available to check-out
WACR WA-PRO: Created
WALO WA-PRO: Locked
WACS WA-PRO: Closed
crea Created
actv Active
lega Legally Active
inac Inactive
calc Calculation Relevant

WADL WA-PRO: To Be Deleted


LRCL Land Register Closed
PRCS Parcel Ceased to Exist
liqi In Liquidation
liqd Liquidated
OFRJ Rejected
RELF Release Forbidden
INIT Initial Status
IBDE Deletion flag
IBIN Deactivate
IB04 Avail.
IB05 Avail.
Service Entry Sheet
CRE created
Service Entry Sheet
SREL released
Service Entry Sheet
CANL cancelled
CCIN new
CCAK Released
CCLO Blocked
CCDL Logically Deleted
CCAR Ready for Archiving
INIT New
DRFT Draft
REVW Review
REWK Rework
IP In Process
OPEN Open
RSLV Resolved
CLSD Closed
REAS Reassessment
VLDT Validated
SBMT Submitted
Test In Process
ATCL Auto Closed
SHIP Shipping taken place
TVER Partial Shipping
KLAU Clinical Order Created
Basic Med. Doc. in
MDIP Process
Basic Med. Doc.
MDCP Complete
Basic Med. Doc. to Be
MDTC Checked
OINA Inactive
OACT Active
DFS Deletion flag set
Asgd Allocated
VNE Value does not exist
VMSG Value missing
VVAK Valid value
VEST Value was estimated
VI Value implausible
Value entered/changed
VCHG manually

VREL Value has been released


VLCK Value is locked
VPRO Value is protected
VARC Value was activated
VEPL Value was extrapolated
VINT Value was interpolated
Val. Manually Chngd
VaCh Externally
Version Not In Validity
VNVP Period
RINA Route Inactive
RACT Route Active
DFLS Deletion Flag Set
DINS Deletion Indicator Set
RIPR Route in Processing
Waste Disposal Order
HANG Created
Waste Disposal Order
HPLN Planned
Waste Disposal Order
HAUS Output
HCOP CO Posting
Deletion Flag for WDO
HLVM Header
PANG WDO Item Created
PAUS WDO Item Output
PPZM Positive Confirmation
PNZM Negative Confirmation
PZUR WDO Item Postponed
PABG WDO Item Billed
Debit Memo Request
PLST Generated
PBEH Container Transport
Container
PBCH Del/Remove/Replace.
Deletion Flag for WDO
HLKZ Header

You might also like