STANDARD WORK
WORK INSTRUCTIONS
Revision: 001
Authorization Approvals
Electronic authorization approval is the preferred method for approving Intelex Documents.
2 REFERENCES/SUPERSEDE...........................................................................................................................7
2.1 REFERENCE DOCUMENTS................................................................................................................................7
3 RESPONSIBILITY/AUTHORITY .....................................................................................................................7
MRB PROCESS FLOW.........................................................................................................................................8
MRB VISUAL MANAGEMENT.............................................................................................................................9
MRB CART .........................................................................................................................................................9
1.2 Scope
The scope of this document is the entire non-conforming material process in operations to include: Identifying discrepant material, visual
management of non-conforming material, disposition of material, and Oracle system processing of non-conforming material. The factory
operations team is responsible for executing this process and responsible roles include the operations manager, cell associates, buyer/planners,
material handlers, engineers, and designated qualified evaluator if that responsibility is not assigned to one of the aforementioned positions.
2 References/Supersede
2.1 Reference Documents
3 Responsibility/Authority
The Process Owner is responsible for the maintenance and notification to associates affected by changes to this document. Process owners
are also responsible to ensure that associate training is updated as required. Notification of changes and current revisions are accessed via
electronic network or other approved Document Control system.
This document is issued under the authority of the Sr. Materials Manager
No
Reoccurring Yes Move to disposition
Bring to Engineer/tech
to rework part issue? area
Evaluator to
Rework disposition NCM.
Fill out tag. Scrap
Qualified Evaluator
Place on
appropriate shelf
MRB Cart: The MRB Cart visually manages non-conforming material and allows for all factory members to stay informed on the disposition
and age of MRB. It provides color-coded indicators to keep the shelf life of MRB to <14 days. Big boxes will fit on a pallet next to the MRB cart
with kickstands and available labels to indicate placement on the cart.
Shelf 2: If disposition is
Escalate to Engineer, place on
Engineer Review shelf. Items
must be evaluated within 3 days
of arriving on the shelf.
Label Pouch
Quantity:
List Serial #(s) on tag and ALSO ON ITEM- if no serial numbers ,
write N/A; if multiple, continue on reverse side:
Disposition:
Scrap MRB
Transacted into MRB? (circle one) Yes/No
Occurrence No.: Date:
PO No./Line No.:
Name:
Date:
Evaluator Name:
Qualifed Evaluator
Dispostion:
Scrap Escalate to Engineer RTV
Use As Is Rework
Name of person to complete Rework: ________________
Comments:
Planner
Visual Management
Team keeps up with managing and following procedures of the MRB cart. Material Handlers will review the cart daily and make any visual
adjustments. The MRB Cart is reviewed on the team’s daily factory walk-through.
Disposition: Whether (or how) the material may or may not be used in the scope of Fluke Corporation operations, including: Invalid, Use As Is
(UAI), Use with Rework (Rework) or Do Not Use.
Disposal: How the material is to be moved from the MRB inventory after dispositioning, including: Rework, Scrap or Return to Vendor.
Invalid: Disposition assigned when the material thought to be nonconforming is found to be conforming.
Do Not Use: Disposition assigned when nonconforming material cannot be used and must be disposed of.
Nonconforming record (a.k.a. NCR): record of nonconforming incident in the Quality System Results collection plan.
Planner: Any Fluke employee charged with planning the item daily supply for production demands, including: Master Schedulers, Production
Schedulers, Planners, Planner-Buyers and Buyers (when a planner is not assigned).
Qualified Evaluator: Designated person (Team Lead, Planner/Buyer, Inspector, or other) who is responsible for evaluating and dispositioning
incoming MRB.
Related inventories: Inventory associated to the non-conforming discrepancy that may include, as examples: same purchase order receipt,
date/lot code or manufacturer’s id code (purchased items) or same job or process output (subassemblies).
Return to Vendor (a.k.a. RTV): Disposal method used when nonconforming nature is the fault of the supplier and the dollar value is sufficient to
process a Return to Vendor, according to management set criteria.
Rework: Disposal method used when nonconforming nature is correctable by affordable means, considering time and resources and is allowed
by engineering disposition.
Rework Order: A purchase order or internal order placed with an external or internal supplier, respectively, when NCM is dispositioned as able
to be reworked and the disposal decision is to be reworked.
Scrap: Disposal method used when nonconforming nature is due to manufacturing process or mishandling of material and is not the fault of
the supplier, or the dollar value is insufficient to process a Return to Vendor procedure.
Screen: A process of sampling or 100% examination of material or a lot of that material with the intent of determining that the documented
parameters (specification or drawing) of the material are satisfied.
Sort: A process that entails the separation of conforming from nonconforming material.
Use As Is (a.k.a. UAI): Disposition assigned when nonconforming material may be used as conforming without modification, once temporary or
permanent changes are made to the governing documentation.
End of Doc