Study Committee B2
“Overhead Lines”
Herbert Lugschitz, Secretary of B2
Austrian Power Grid (APG), Vienna
SC B2 Technical Meeting – Auckland, New Zealand - September 19, 2013
11.01.2014 2
The increasing demand of energy leads to an
increasing demand from lines.
The big majority of those lines (high voltage and
extra high voltages) will be overhead.
This concerns the replacements of existing lines,
building new ones, and uprated lines.
This is within the scope of B2
In many countries: OHL /UGC question – to be
solved on a case by case basis
Cigre Study Committee B2
SC B2 covers all fields of overhead lines activities, which is the
design
construction
operation of overhead lines
including the mechanical and electrical aspects
and the design of line components
conductors and ground wires
insulators
accessories
structures
foundations
validation tests
partially in cooperation with other study committees
Cigre Study Committee B2
It also covers the
study of in service performance
assessment of the state of line components
maintenance
refurbishment
upgrading and uprating of overhead lines.
SCB2 Scopes
– Increase Acceptability of OHL
– Increase Capacities of existing OHL
– Increase Reliability and Availability of OHL
To cover this SC B2 is composed of
24 Working Groups
two joint working groups (Live line maintenance B2/B3 and Environmental issues for rural and
urban areas C3/B1/B2)
7 Advisory Groups help to coordinate.
Structure of SC B2
• Members from 24 countries
Switzerland, Slovenia, Sweden, Brazil, United States of America, Ireland, Spain, Belgium, Norway,
Canada, Russia, Australia, Finland, China, Austria, South Africa, Britain, South Korea, France,
Germany, Italy, Czech and Slovak Republics, Japan, Poland
• Plus Observers (Iceland, Venezuela, India, Mexico, Portugal, the Netherlands, Romunia, Israel,
New Zealand)
• Chairman: Konstantin Papailliou/CH, Secretary: Herbert Lugschitz/AUT
• 24 WG with 311 members from 41 different countries
40
35
Members in WGs of B2
30
25
20
15
10
0
6
ES
GR
JP
TH
HU
NO
NP
IN
NL
NZ
IE
IL
IR
IS
IT
PL
PT
RU
ZA
FI
AT
AU
BR
DE
DK
FR
KR
MY
RS
SA
SE
SI
BE
RO
UK
CA
CH
CL
CZ
UA
US
WG members by continents
Oceania
Europe
Asia
Africa
America
7
Cigré SC-B2 WGs
Working Group
WG B2.21 Arc protection and diagnosis for composite string insulators
Geotechnical and structural design of the foundations of HV & UHV Lines,
WG B2.23
application to the updating to the refurbishment and upgrading guide
Qualification of HV and UHV Overhead Line Supports under static and dynamic
WG B2.24
Loads
Preparatory studies on specifications for revision of IEC testing of Self Damping
WG B2.25
and conductor fatigue characteristics (new IEC Spec.)
WG B2.28 Meteorological data for assessing climatic loads. Update of IEC TR 61774
Evaluation of High Surge Impedance Load solutions for increased natural
WG B2.38
capacity of OHL
Calculations of the electrical distances between live parts and obstacles for OHL :
WG B2.40
Preparatory studies for revision of IEC standard (IEC61…
WG B2.41 Guide to the conversion of existing AC lines to DC operation
WG B2.42 Guide to Operation of Conventional Conductor Systems above 100°C
Guide for Thermal Rating Calculations for Overhead Lines with high
WG B2.43
temperatures and real-time weather & load data
WG B2.44 Coatings for protecting overhead power network equipment in winter conditions
WG B2.45 Bushfire characteristics and potential impacts on Overhead Line Performance
8
Cigré SC-B2 WGs
Working Group
WG B2.46 Wind induced motion on bundle conductors (excluding ice galloping)
WG B2.47 Remedial actions for aged fittings and repair of conductors
WG B2.48 Experience with the mechanical performance of new conductor types
Safe design tension for conductors fitted with elastomer cushioned
WG B2.49
suspension units
WG B2.50 Safe handling of fittings and conductors
WG B2.51 Methods for optimized design of overhead transmission lines
WG B2.52 The use of robotic in assessment and maintenance of OHL
WG B2.53 Management guidelines for outsourcing OHTL technical expertise
Management of risk associated with severe climatic events and climatic
WG B2.54
change on OHL
WG B2.55 Conductors for the Uprating of existing Overhead Lines
Ground Potential Rise at Overhead AC Transmission Line Structures during
WG B2.56
Faults
JWG B2./B3.27 Live line maintenance : a management perspective
Environmental issues of high voltage transmission lines for rural and urban
JWG C3/B2/B1.13
areas
9
Content of presentation
Current activities of B2 (excerpt)
The use of robotics for maintenance
expected climatic change: consequences and influences on lines
New and alternative tower design to increase the acceptance of overhead lines
Conductors made of new and non-metallic core materials to work at higher temperatures to
carry more electric current
Thermal Rating systems to increase the capacity of existing lines depending on the present
climatic conditions
Especially for long connection: the use of direct current (DC) instead of alternating current (AC).
A mix of both will be studied on a “AC/DC hybrid line” to use the advantages of both techniques
Uprating of OHL by increasing the voltage
Robotics
Generally not to take over the responsibility from the maintenance staff.
But: to assist the maintenance staff
Used
if too risky for personnel
under poor access conditions
unmanned helicopters for long distance checks
robots for conductor check and small repair work
B2 Session 2013 Auckland, Symposium papers 262, 263
WG B2.52 The use of robotic in assessment and maintenance of OHL
Multicopter
Small helicopters
1 pilot
1 observer
legal situation needs to
be checked (permissions)
pictures: RTE (above) and APG / AIBOTIX (below)
video
Climatic change
We cannot allow ourselves to disregard
significant changes in the climate in the
future
B2 Session 2013 Auckland, Symposium papers 122, 123, 125
WG B2.54 Management of risk associated with severe climatic events and climatic change on OHL
climatic change
• No consensus about effects and if: which and how severe
• Example: melting permafrost in Russia
• Example: in Norway less ice at the coats but more ice in the inland
Pictures: Cigre, S. Fikke
14
Extreme weather conditions
Possible influences on OHL
heat waves and droughts
heavy rain
ice and snow accreation
storms, typhoons
landslides
floods
hunderstorms
Pictures: Cigre
H. Hawes
11.01.2014
Typhoon “Haiyan”
at the Philippines November 2013
Wind speeds up to 340km/h
600 km diameter typhoon
Most severe typhoon ever
Climatic change (IPCC)
Intergovernmental Panel on Climate Change 2012
Example: extreme “Fire Weather”
– Aged and poorly maintained lines have a high risk of component failure causing fire
– Conductor clashing under strong winds in extreme fire weather also creates the increased risk
exposure to fire starts
– Satellite observation (left: south Africa indicating OHL with actual fires near the line);
right: Europe indicating actual fires) Pictures: Cigre, H. Vosloo
Climatic change
(concluding remarks)
Evolution in climate must be accounted for (e.g. sufficient reserves in the design)
Consider cheap actions (e.g. tower spotting) before you are forced to take on expensive ones
(e.g. rebuild towers or re-route the line)
Consider life time of OHL in relation to time scales for changes in climate
Notify and file events in your grid
Picture: Cigre, S. Fikke
Alternative tower design
To increase the acceptance of OHL
pictures: Cigre, Joao da Silva, P. Meyer EDF/RTE, T.
Sörensen energinet, fingrid, REE, www
tower design competition
Iceland
Pictures: Cigre, Session 2011 Reykjavik
Other ideas – Iceland, France
RTE, Amnesville
Pictures: Cigre, Session 2011 Reykjavik;
RTE (E. Paroucheva)
tower design competition
Norway, Iceland
Pictures: Cigre, Session 2011 Reykjavik
tower design competition
Norway
Pictures: Cigre, Session 2011 Reykjavik
Design study from University of Arts
SCIONIC / Linz / AT
400kV lines
Lattice steel tower is optimized
I.D.E.A.L. Industrial Design Education Austria Linz Seite 25 03.12.2009
new tower design
the Netherlands, Tennet, Randstad
2 x 400kV lines
also: 2x 110kV + 2 x 400kV
Paper at Cigre 2014 Paris
Example: compact line 420 kV - Dubai (since 2008)
Comparison of standard
and compact line design
2 x quadruple bundle
Picture: Cigre, Session 2010 Paris B2-112, F. Schmuck
WG B2.51 Methods for optimized design of overhead transmission lines
different acceptance of OHL
red – white red coloured
towers not disturbing
(Austria)
Nest for storks
Military side effect (Italy) line not disturbing?
28 (Germany) B2 members taking pictures
29
New conductor materials
Principle: conductors which allow a higher
service temperature (more than 80°C) to
transport more current. 150/180/210°C
challences
not much increase of sag
similar tension forces
thermal capability of the materials
no or only little adaptions on existing
towers
Substations must allow higher current
Check the legal situation (permisson) to
run the line with the desired current
Diagramm: Cigre, D. Douglass
WG B2.42 Guide to Operation of Conventional Conductor Systems above 100°C
WG B2.55 Conductors for the Uprating of existing Overhead Lines
WG B2.48 Experience with the mechanical performance of new conductor types
New conductor materials
Next step: conductors with „knee point“ to
reduce the increase of sag with temperature
Temperatures up to 250°C
At temperatures above the „knee point“ the sag
does not increase linearely.
Diagramm: Cigre, Session 2000 Paris 22-202
New conductor materials
overview on conductor types (not complete)
AAAC All Aluminium Alloy Conductor
ACSR Aluminium Conductor Steel Reinforced
TACSR Thermal resistant Aluminium Conductor Steel Reinforced
G(Z)TACSR Gap-type (Super) Thermal resistant Aluminium alloy Conductor Steel Reinforced
(Z)TACIR (Super) Thermal resistant Aluminium alloy Conductor Invar Reinforced
ACAR Aluminium Conductor Alloy Reinforced
ACSS Aluminium Conductor Steel Supported
ACCC Aluminium Conuctor Composite Core
ACCR Aluminium Conductor Composite Reinforced
Picture: 3M, ACCR Picture: CTC, ACCC Picture: Lumpi-Berndorf, TACSR (coated)
New conductor materials
When speaking about high temperature conductors also the losses need to be
considered:
The current losses are 4 times higher if the current is doubled
The total losses rise more than that as the conductor´s resistance rises with the
temperature.
Therefore the total losses of a high temperature conductor at full load are app. 6
times higher compared with a „standard“ ACSR (example for a conductor ACSR
or AAAC 340/110 at 80°C)
Thermal rating systems
The ampacity of an overhead line depends on several factors
clearances to ground , buildings, obstacles
maximum allowable conductor temperature (mechanical)
substations must be prepared for higher current
load flow considerations of the grid
legal situation (permisson) to run the line with the
desired current
The actual temperature of the conductor
depends on the ambient conditions and
the electric current
Picture: Cigre 2008 Paris B2-101
Guide for Thermal Rating Calculations for Overhead Lines with high temperatures and real-
WG B2.43
time weather & load data
Influences on conductor temperature
ambient temperature
35°C
Electric current
windspeed and direction
global radiaton
900 W/m²
0,6 m/s
11.01.2014 35
Wind speed and temperature at summer 2007 at two locations in the European Alps
Windspeed m/sec
Windspeed m/sec
Example: Blue values are examples from Table: example, no general statement!
standards Wind 0,6 m/sec, ambient
temperature 35°C. ambient wind speed Ampacity
temperature (rectangular)
When the ambient conditions are different, the 35°C 0,6 m/sec 100 %
line can be loaded higher
20°C 0,6 m/sec 115 %
Thermal rating depends on the environmental
situation. It does not substitute the 20°C 2 m/sec 150 %
transmission line development.
Thermal rating methods
(examples)
Pictures: Cigre, Session 2006 Paris B2-311;
Ampacimon, MICCA
AC/DC hybrid lines
Existing 2 x 400kV AC line
will be changed to:
- 1x420kV AC
- 1x +/- 400kV CD
Investigations about
influences from ion currents
Interaction AC-DC and DC-
AC ?
Influences in substations
(e.g. transformers)
B2 Session 2013 Auckland, Symposium papers 141, 142
WG B2.41 Guide to the conversion of existing AC lines to DC operation
Voltage uprating
Example: uprating of a 300kV line to 420kV (Norway)
Additional 40% capacity
Uprating of a major portion planned (20% shall be uprated in 2030)
Relatively small visual changes
The world´s largest uprating project
Cigre session 2012 Paris, B2-102-2012
Symposium, Tutorial, Colloquium
Example: International Colloquium on Ultra High Voltage
in association with CIGRE April 2013 in New Delhi
Example: September 2013 Cigré B2 Session
in Auckland/New Zealand
100 papers and more than 350 attendees from 35 countries
Symposium
Extreme weather and environmental conditions (heavy rain, humidity, seismic, etc.)
Lifetime management, asset management, maintenance techniques
Upgrading and uprating of Transmission and Distribution asset
HV and MV equipment
New requirements for combined AC & DC networks
Tutorial
Methods for the optimized design of overhead transmission lines
Transmission Line Upgrading with High-Temperature Low-Sag (HTLS) Conductors
Engineering Guidelines Relating to Fatigue Endurance Capability of Conductor/Clamp Systems
Evaluation of Aged Fittings
How does Cigre work?
a) Discussion of “preferential subjects” (items of general interest, new developments, at the Paris
session every 2 years (even years)
Definition of “preferential subjects” for each SC
Submission of suggested contributions from SC members to TC of Cigre (acceptance or refusal)
“Special reporter” system
• The Special Reporter poses questions prior to the meeting (published on www)
• Answers and discussion at the meeting
b) Production of technical brochures
Study committee meetings – yearly (in Paris in even years and elswhere in odd years)
Working Groups (incl. task forces) produce Working Group documents
Confirmation of WG documents - after revision and discussion by the SC as Cigre paper
Publication
c) Seminars, Tutorials, Colloquiums
about pending questions/developments, new materials, methods, approaches
With practical reference for the transmission line engineer
Preferencial Subjects
2014 Paris Session
PS1 Minimizing the Impact of new Overhead Lines
Design, construction and operation
Ecology, vegetation and wildlife management
Routing and visual acceptance
Design of, and experiences with, transitions to underground sections
PS2 Reliability and Design Optimization
Tools and methods
Impact of different designs on initial and life cycle costs
Cost effects of environmental, regulatory and public influence
PS3 Conductors : Installation and Long Term Performance
Installation, maintenance and replacement methods including
live line techniques
Creep and fatigue issues on new conductor types
Mechanical behavior of new bundle configurations
B2 Green Book
B2 will issue a „green book“, planned for 2014.
It shall present the main topcs of the OHL business in an easy readable
manner.
The basic priciples will be given but also new developments will be presented.
Comparison OHL and UGC
2015 Session in Delhi
between Februar and May 2015?
Eventually can be held along with Grid Tech 2015 biannual Exhibition
Radical new tower design ?
Voltage uprating