ROOF TILING - SAFE WORK METHOD STATEMENT No 1 RISK RATING = 1 High risk / 2 Medium Risk / 3 Low Risk
Site Address : _________________________________________________Builder / Owner:_________________________________
Contractor : _________________________________________________________________ ABN :_________________________
Sub-Contractor :_____________________________________________ Ph :____________________ Fax :____________________
Person Responsible : _____________________________________ Signed : ______________________________ Date : __ / __ / __
SWMS 1 NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
Standard activities Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
ACTIVITY HAZARD RISK Control Measures or Safe Job Procedures
1. Working on a roof Fall from the edge __ 1. CONTROL MEASURES ARE REQUIRED AT ANY HEIGTH WHERE THERE IS A RISK OF FALLING
or through the the such as Scaffolding (a securely fenced work platform) or secure perimeter screens, fencing, handrails or
roof other forms of physical restraints that are capable of arresting the fall of a person.
2. Keep the soles of shoes clean.
3. Use two pairs of shoes in damp conditions place a pair for walking on the ground at the base of the ladder,
e.g. gumboots for muddy conditions and roofing shoes for ladder and roof (ladder must be tied off).
4. Erect ladder on a level and solid base away from overhead obstructions
5. Place ladder bases one metre out from the wall for every four metres in height and a minimum height of 1metre
above the level of the roof access point.
6. Secure ladder with a gutter guard /ladder brackets and tie off.
7. Always maintain a minimum three point contact when climbing a ladder i.e. both hands and one foot do not
carry tools in your hands when climbing.
8. Use two pairs of shoes in damp conditions place a pair for walking on the ground at the base
9. Do not stand on metal fascia, fixing brackets are weak or may not be secured correctly. Consider nailing an
extra batten across the top of the rafter ends to place your foot.
10. For extra long rafter runs, greater than 9 metres, additional precautions may be required in the event of a slip
and fall. Consider the use of a safety harness.
11. Do not over stretch the string line when marking out bottom course it may break causing overbalance.
12. Replace frayed or damaged string lines.
13. Use extra caution on steel roof battens that twist when walked on.
14. Beware of overbalancing on loose battens when walking near edge.
15. Provide a minimum batten length of 2 rafter spacings.
16. Select timber battens which are not overly knotty, or cut out knots.
17. Roof surface to be dry avoid wet weather when laying tiles.
18. Use cutting tray or similar, e.g. carpet, to capture dust and debris.
19. Keep the roof area clean and free of trip hazards.
MRTSA / WorkCover 2007 SWMS
ROOF TILING - SAFE WORK METHOD STATEMENT No 2 RISK RATING = 1 High risk / 2 Medium Risk / 3 Low Risk
SWMS 2 NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
Standard activities Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
ACTIVITY HAZARD RISK Control Measures or Safe Job Procedures
20. Major hazard exists on thin terra cotta tiles.
21. Do not lay fractured tiles singers.
22. Always walk on the tile lap, never on the centre of the tile.
23. Extreme caution on green (uncured) concrete tiles.
24. Extra caution on greasy, damp or dewy valley irons also watch for silicon wiped off fingers by plumber etc.
25. Where practical use valley irons with rolled edges.
Lifting tiles 1. Do not carry too many tiles, 4 - 5 on average is recommended.
2. Use correct bending techniques at all times when lifting.
3. Where possible use a tile trolley for straight runs greater than 15 metres.
2. Use of Equipment Operate elevator 1. Use two or more tilers to position an elevator.
And PPE 2. Do not stand in the fall zone, or fall arch of the elevator.
3. Tie off the elevator after positioning.
4. Where practical use two or more tilers to pull up the elevator to roof level avoid putting weight on metal
fascia when doing so. Consider nailing an extra batten across the top of the rafter ends to place your foot on.
5. Check elevator drive belt is enclosed by safety guard/s.
Exposure to Ultra __ 1. Wear approved UV resistant clothing and sunglasses and a hat (seek advice from Cancer Council or Equiv
Violet(UV) Rays organization)and apply sunscreen before and during daily work routine.
Using a hand saw __ 1. Check that all handsaws are in good working order and that blades are sharp with no teeth missing.
Use of nail gun __ 1. Isolate area of work when using nail gun. Ensure consultation with any other tradesmen on site.
2. Keep fingers and hands away from the nail fixing location.
3. Use piston type nail gun.
4. Wear approved eye and hearing protection when operating nail gun.
Unsecured _ 1. Stabilize the mortar bucket by placing a soft lead sheet, or similar, under the buckets base to
equipment on the stop it from sliding off the roof.
roof 2. Secure any other tools within a nail bag and tool belt.
MRTSA / WorkCover 2007 SWMS
ROOF TILING - SAFE WORK METHOD STATEMENT No 3 RISK RATING = 1 High risk / 2 Medium Risk / 3 Low Risk
SWMS 3 NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
Standard activities Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
ACTIVITY HAZARD RISK Control Measures or Safe Job Procedures
3. Finishing off Roof Removal of tile __ 1. Establish a number of clearly marked areas around the dwelling to remove broken and cut tiles.
pieces from the roof 2. Consult with other trades to ensure isolation of worksite below while tiling is in progress.
3. Prevent entry to areas where tile debris are being lowered.
4. For large jobs or areas where public safety is a concern, use a rubbish/rubble chute.
5. Place signs (as per the relevant Code of Practice) around the dwelling to warn others that roof tiling is in
progress.
Sweeping down __ 1. When sweeping, always keep your feet positioned in the clean (previously swept) area away
dusty tiles from the dust.
2. Keep roof areas clean and free of trip hazards particularly tile pieces.
3. When cleaning roof plumbing beware of slipping on the bottom tile course.
Carry Mortar __ 1. Do not carry excessive loads of mortar.
2. Use correct techniques when lifting bedding, or pointing mortar.
Use flexible pointing __ 1. Consult manufacturers Material Safety Data Sheet and wear recommended protective
material equipment fumes and contact with skin are an issue.
2. Avoid contact with cement.
4. Other Roofing Erecting a ladder __ 1. When erecting metal ladders take note of any overhead power lines near the work and ensure a
Procedures near power lines etc. minimum distance of 4.0 metres is maintained.
2. Where power lines are in close proximity to the work area (e.g. extension to existing dwelling) cover
with tiger tails, however if less than 4 metres power must be turned off as tiger tails are not insulators.
3. Avoid working in high winds near overhead power lines.
Working on roof __ 1. Check that supporting brickwork is in place temporary propping is not an acceptable form of
framing temporary structural support for roof framing.
propping
Working near voids __ 1. Provide minimum batten length of 2 rafter spacings.
between framing 2. Install safety mesh or approved safety sarking for rafters spacings greater than 600 mm.
3. Install safety net over stair wells
MRTSA / WorkCover 2007 SWMS
ROOF TILING - SAFE WORK METHOD STATEMENT No 4 RISK RATING = 1 High risk / 2 Medium Risk / 3 Low Risk
SWMS 4 NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
Power lines / temporary props Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
/ voids / power tools
ACTIVITY HAZARD RISK Control Measures or Safe Job Procedures
Use of power tools __ 1. Regularly check and tag extension leads and tools.
2. Extension leads to be secured or hooked minimum of 2 m above the ground.
3. Do not connect several extension leads together (in series). Get one long extension lead of the
correct duty for the length.
4. Earth leakage cut out switches must be fitted to all extension leads at source (i.e. where they
plug in).
5. Use approved covers to keep water out of plugs.
6. Wear approved eye and hearing protection when operating power tools.
Lift rolls of Sarking __ 1. Use lighter, more manoeuvrable, 30 metre rolls instead of 60 metre rolls.
2. Use mechanical aids or two workers to lift rolls
Laying sarking __ 1. Avoid sarking in windy conditions.
2. Extra caution required when cutting the mitre at a hip on the bottom course
3. Beware of Parachute Effect wind lifts sarking and framing causing temporary props to fall out.
Removal of tiles from __ 1. Establish a number of clearly marked areas around the dwelling to lower tiles in a controlled fashion.
roof 2. Prevent entry to areas where tile debris are being lowered.
3. For large jobs or areas where public safety is a concern, use a rubbish/rubble chute.
4. Place signs (as per the relevant Code of Practice) around the dwelling to warn others that roof
tiling is in progress.
Climb ladders __ 1. Erect ladder on a level and solid base away from overhead obstructions.
2. Place ladder base 1 metre out from the wall for every four metres in height and a minimum height of 1
metre above the level of the roof access point.
3. Secure ladder with a gutter guard or ladder bracket and tie off.
4. Always maintain a minimum three point contact when climbing a ladder i.e. both hands and one foot,
do not carry tools in your hands when climbing.
5. Use two pairs of shoes in damp conditions place a pair for walking on the ground at the base of the
ladder, e.g. gumboots for muddy conditions and roofing shoes for ladder and roof.
MRTSA / WorkCover 2007 SWMS
ROOF TILING - SAFE WORK METHOD STATEMENT No RISK RATING = 1 High risk / 2 Medium Risk / 3 Low Risk
SWMS NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
Standard activities Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
ACTIVITY HAZARD RISK Control Measures or Safe Job Procedures
MRTSA / WorkCover 2007 SWMS
ROOF TILING - SAFE WORK METHOD STATEMENT (Part 2)
Site Address : ____________________________________________________ Builder / Owner:______________________________
Contractor : __________________________________________________________________ ABN :_________________________
Sub-Contractor :________________________________________________Ph :__________________ Fax :____________________
Person Responsible : _____________________________________ Signed : ______________________________ Date : __ / __ / __
SWMS NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
(PART 2) Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
Name Qualifications and Experience : Duties and Responsibilities : Any Training Required to Complete Work ?
Plant / Equipment : Maintenance Checks :
Read and Signed by All Employees on Site :
MRTSA / WorkCover 2007 SWMS
ROOF TILING - SAFE WORK METHOD STATEMENT No 1 RISK RATING = 1 High risk / 2 Medium Risk / 3 Low Risk
Site Address : lot 147 Smith Street SEVEN HILLS Builder / Owner: Barry Brown _____
Contractor : __ABCD ROOFING Pty Ltd _________________________ ___ ABN : XXX XXX XXX
Sub-Contractor :__JONES & SMITH ______________________ Ph : 0418 XXX XXX Fax : 02)XXXX XXXX
Person Responsible : GARY SMITH Signed : G SMITH Date : 10 / 10/ 2007
SWMS 1 NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
Standard activities Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
ACTIVITY HAZARD RISK Control Measures or Safe Job Procedures
1. Working on a roof Fall from the edge 1 1. CONTROL MEASURES ARE REQUIRED AT ANY HEIGTH WHERE THERE IS A RISK OF FALLING
or through the the such as Scaffolding (a securely fenced work platform) or secure perimeter screens, fencing, handrails or
roof other forms of physical restraints that are capable of arresting the fall of a person.
2. Keep the soles of shoes clean.
3. Use two pairs of shoes in damp conditions place a pair for walking on the ground at the base of the ladder,
e.g. gumboots for muddy conditions and roofing shoes for ladder and roof (ladder must be tied off).
4. Erect ladder on a level and solid base away from overhead obstructions
5. Place ladder bases one metre out from the wall for every four metres in height and a minimum height of
1metre above the level of the roof access point.
6. Secure ladder with a gutter guard /ladder brackets and tie off.
SAMPLE
7. Always maintain a minimum three point contact when climbing a ladder i.e. both hands and one foot do not
carry tools in your hands when climbing.
8. Use two pairs of shoes in damp conditions place a pair for walking on the ground at the base
9. Do not stand on metal fascia, fixing brackets are weak or may not be secured correctly. Consider nailing an
extra batten across the top of the rafter ends to place your foot.
10. For extra long rafter runs, greater than 9 metres, additional precautions may be required in the event of a slip
ONLY
and fall. Consider the use of a safety harness.
11. Do not over stretch the string line when marking out bottom course it may break causing overbalance.
12. Replace frayed or damaged string lines.
13. Use extra caution on steel roof battens that twist when walked on.
14. Beware of overbalancing on loose battens when walking near edge.
15. Provide a minimum batten length of 2 rafter spacings.
16. Select timber battens which are not overly knotty, or cut out knots.
17. Roof surface to be dry avoid wet weather when laying tiles.
18. Use cutting tray or similar, e.g. carpet, to capture dust and debris.
19. Keep the roof area clean and free of trip hazards.
MRTSA / WorkCover 2007 SWMS
ROOF TILING - SAFE WORK METHOD STATEMENT (Part 2)
Site Address : lot 147 Smith Street SEVEN HILLS ___ Builder / Owner: BARRY BROWN
Contractor : _ABCD ROOFING Pty Ltd ___________________ ____ ABN : XXX XXX XXX
Sub-Contractor :_JONES & SMITH_ _____________ Ph : 0418 XXX XXX Fax : 02)XXXX XXXX
Person Responsible : GARY SMITH Signed : G SMITH Date : 10 / 10/ 2007
SWMS NOTES : Refer O.H.& S. Act 2000, O.H.& S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information
(PART 2) Safe Work on Roofs Part 2 for Residential Buildings, Electrical Practices for Construction Work
Name Qualifications and Experience : Duties and Responsibilities : Any Training Required to Complete Work ?
K. Jones Roof tiler / Slater 30 years Supervisor / Hazard Control Measures N/A
G. Smith Roof Tiler 5 years General activities Working on Steep work
SAMPLE
ONLY
Plant / Equipment : Tile Elevator Maintenance Checks : Weekly - 9 / 7 / 2007
Read and Signed by All Employees on Site :
Keith Jones Keith Jones Garry Smith G Smith
MRTSA / WorkCover 2007 SWMS