Boq-Rehabilition of Football Stadium and New Construction
Boq-Rehabilition of Football Stadium and New Construction
Sub Total
Sub Total
III Main Tribune Works
1 Excavation m3 88.10
Compacted sand bedding 100mm thick
2 m3 11.52
below pile cap and tie beam
Compacted sand bedding 200mm thick
3 m3 67.20
below floor
4 Compacted soil backfilling m3 84.04
5 Stranss pile dia.300mm, H=5800mm m 3
37.58
6 Pile Cap (PC-2, PC-3) m 3
37.76
7 Column (C1,C2,C3,C4 & CP) m 3
63.17
8 Tie Beam (TB01,TB02 & TB03) m3 20.15
9 Beam (B1,B2,B3,B4 & CS1) m3 36.05
10 Ring Balk (RB) m 3
3.66
11 Plate & Stair 160mm thick m 3
104.83
12 100mm thick Concrete floor (1:2:3) m 3
43.40
13 Wall block masonry (100X200x400mm) m 2
944.70
Wall plastering (1:4) include smoth
14 m 2
1,889.40
plastering
15 Floor tiles 600x600mm m 2
240.00
16 Floor and wall tiles 300x300mm m2 66.75
17 Granite floor tiles 600x600mm m2 48.00
Gypsum/Calsiboard for ceiling include
21 m2 370.44
hollow 40mm frame and fittings
Roof trusses made by G.i. 75-100mm
22 include Zincalume sheet 0.42mm and m2 617.21
fittings
Hand rail pipe made by G.i. 75mm include
23 ml 143.00
fittings
Wall painting use acrylic emulsion paint (2
24 m2 1,889.40
coats) include plammir
Ceiling painting use acrylic emulsion paint
25 m2 370.44
(2 coats) include plammir
Steel painting use enamel paint (1 coat)
26 m2 179.36
include anti rusty paint
Door (P1) double swing type made by solid
27 clear glass 6mm frameless includes set 1.00
fittings, handle and lock
Sub Total
V Drainage Works
1 Excavation m3 972.34
2 Sand and Soil Fill layer(1:3) m 3
99.78
3 Crusher Gravel 5/7 layer m 3
268.64
4 PVC pipe 1/2'' ml 168.00
5 PVC pipe 6'' ml 1,326.00
6 PVC pipe 8'' ml 540.00
7 Geotextile TS 30 m2 167.90
Reinforcement Control box + concrete
8 m 3
20.48
cover
9 HRPC concrete drain ml 189.40
10 Stone massonry (1:5) m 3
100.98
11 Wall block masonry (100X200x400mm) m 2
268.80
12 Wall plastering (1:4) m 2
403.20
13 Compacted soil back fill m 3
67.16
M.S. Grating made by angle bar and rebar
14 ml 189.40
dia.10mm include painting
Sub Total
VI External Works
1 Excavation m3 413.30
2 Stone massonry foundation m 3
42.30
3 Reinforcement concrete works for fence m 3
77.28
4 Wall block masonry (100X200x400mm) m 2
1,739.00
5 Wall plastering (1:4) m 2
3,478.00
Wall painting use acrylic emulsion paint (2
6 m2 3,478.00
coats) include plammir
7 Compacted soil back fill m3 49.60
Bore water for clean water distribution
8 ls 1.00
include bore pad
Ground tank 25m3 includes distribution
9 unit 4.00
pipe and fitting
Elevated water tank 500 liter include
10 unit 2.00
fittings
11 Water pump include fittings unit 2.00
12 3000mm high BRC fence include fittings ml 380.00
Steel Gate made by iron plate and iron
13 unit 2.00
frame include fitting, painting and lock
Septic tank + absobtion include pipe and
14 unit 4.00
fitting
Name board made by Gold colour of letter
15 ls 1.00
include frame and fittings
Sub Total
Total
TAX
Grand Total
CONSTRUCTION
Amount(NRS)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00