Boq-Rehabilition of Football Stadium and New Construction

This document is a bill of quantities for the rehabilitation of a football stadium and new construction. It includes 14 items under Preparation Work, 20 items under Football Field and Athletic Track Works, and 62 items under Main Tribune Works and Public Tribune Works. The items listed provide quantities and unit prices for excavation, fill materials, turf grass installation, fencing, lighting, plumbing fixtures, electrical work, finishes and furnishings needed for the stadium project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Boq-Rehabilition of Football Stadium and New Construction

This document is a bill of quantities for the rehabilitation of a football stadium and new construction. It includes 14 items under Preparation Work, 20 items under Football Field and Athletic Track Works, and 62 items under Main Tribune Works and Public Tribune Works. The items listed provide quantities and unit prices for excavation, fill materials, turf grass installation, fencing, lighting, plumbing fixtures, electrical work, finishes and furnishings needed for the stadium project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

BOQ-REHABILITION OF FOOTBALL STADIUM AND NEW CONSTRUCTION

No Item Description Unit Qty Unit Price(NRS)


I Preparation Work
1 Mobilisation and Demobilization ls 1.00
2 Site Office and Materials Storage m 2
50.00
3 Water for Construction works ls 1.00
4 Electrical for Construction works ls 1.00
5 Shop drawing and as build drawing ls 1.00
6 Laboratory test ls 1.00
7 Project Documentation ls 1.00
8 Demolish and site cleaning ls 1.00
Temporary fence or temporary barrier for
9 ls 1.00
construction
10 Project Name Board ls 1.00

Sub Total

Football Field and Athletic Track


II
Works
Soil fill layer above existing field & grass
1 m3 1,926.00
(100mm)
2 Sand and Soil Fill layer(1:3) m3 920.00
3 Crusher Stone layer dia. 200mm m3 714.00
4 Crusher Gravel 5/7 layer m 3
178.00
5 Red Ground layer m 3
142.00
6 Soil elevation and compacted m 2
###
7 Compacted Sand fill 100mm thick m 3
1,118.00
8 Grass plant works ( Bermnda Grass) m 2
8,344.91
Grass plant works ( Local Grass) in sides of
9 m2 1,636.71
athetic track
10 Compacted and water spray distribution m2 1,118.75
Supply of Goal bar made by G.I. pipe
11 unit 2.00
Dia.150mm include painting and rope
Supply of Flag Pole made by G.I. PIPE
12 unit 8.00
Dia.20mm include painting and flag

Supply of score board(3x2m) made by


combination plywood 20mm thick and
13 ls 1.00
hollow bar 50-100mm as frame include
assembling, painting and fittings

Line marked for football field and athletic


14 ml 4,191.00
track
Concrete kerb in side of the Athletic
15 m3 21.25
tracks(1:2:3

Sub Total
III Main Tribune Works
1 Excavation m3 88.10
Compacted sand bedding 100mm thick
2 m3 11.52
below pile cap and tie beam
Compacted sand bedding 200mm thick
3 m3 67.20
below floor
4 Compacted soil backfilling m3 84.04
5 Stranss pile dia.300mm, H=5800mm m 3
37.58
6 Pile Cap (PC-2, PC-3) m 3
37.76
7 Column (C1,C2,C3,C4 & CP) m 3
63.17
8 Tie Beam (TB01,TB02 & TB03) m3 20.15
9 Beam (B1,B2,B3,B4 & CS1) m3 36.05
10 Ring Balk (RB) m 3
3.66
11 Plate & Stair 160mm thick m 3
104.83
12 100mm thick Concrete floor (1:2:3) m 3
43.40
13 Wall block masonry (100X200x400mm) m 2
944.70
Wall plastering (1:4) include smoth
14 m 2
1,889.40
plastering
15 Floor tiles 600x600mm m 2
240.00
16 Floor and wall tiles 300x300mm m2 66.75
17 Granite floor tiles 600x600mm m2 48.00
Gypsum/Calsiboard for ceiling include
21 m2 370.44
hollow 40mm frame and fittings
Roof trusses made by G.i. 75-100mm
22 include Zincalume sheet 0.42mm and m2 617.21
fittings
Hand rail pipe made by G.i. 75mm include
23 ml 143.00
fittings
Wall painting use acrylic emulsion paint (2
24 m2 1,889.40
coats) include plammir
Ceiling painting use acrylic emulsion paint
25 m2 370.44
(2 coats) include plammir
Steel painting use enamel paint (1 coat)
26 m2 179.36
include anti rusty paint
Door (P1) double swing type made by solid
27 clear glass 6mm frameless includes set 1.00
fittings, handle and lock

Door (P2) double swing type made by solid


28 clear glass 6mm with aluminium frame set 3.00
includes fittings, handle and lock

Door (P3) single swing type made by


29 aluminium frame includes fittings, handle set 13.00
and lock

Door (P4) single swing type made by solid


30 clear glass 6mm with aluminium frame set 1.00
includes fittings, handle and lock
Door (P5) single swing type made by
31 aluminium frame and wood panel includes set 3.00
fittings, handle and lock

Ventilation (BV1) solid type made by solid


32 clear glass 6mm with aluminium frame set 2.00
includes fitting

Window (J1) locket type made by solid


33 clear glass 6mm with aluminium frame set 2.00
includes fitting

Window (J2) solid type made by solid clear


34 glass 6mm with aluminium frame includes set 1.00
fitting

Window (J3) swing type made by solid


35 clear glass 6mm with aluminium frame set 2.00
includes fitting and lock

Window (J4) swing type made by solid


36 clear glass 6mm with aluminium frame set 2.00
includes fitting and lock
Sliding Door made by solid iron plate with
37 set 2.00
iron frame includes fitting, handle and lock
Clean water pipe installation use
combination G.I. pipe dia.15-75mm and
38 ls 1.00
PVC pipe 15-75mm include fittings and
testing
Waste water pipe installation use PVC pipe
39 ls 1.00
50-125mm include fittings and testing
40 Monoblock Water Closet sitting type set 11.00
41 Monoblock Hand Basin set 5.00
42 Monoblock Urinoir set 6.00
43 Stainless Shower set set 8.00
44 Stainless Jet shower spray for water closet set 11.00
45 Stainless Floor drain pcs 19.00
46 Stainless Fancet for hand basin pcs 5.00
47 Flourescent Lamp 2x36W set 2.00
48 Flourescent Lamp 2x18W set 16.00
49 Flourescent Lamp 1x36W set 3.00
50 Baret Lamp set 5.00
51 PLC Lamp 18W set 19.00
52 Downlight Lamp 4'' set 40.00
53 Triple switch pcs 4.00
54 Double switch pcs 10.00
55 Single switch pcs 7.00
56 Power outlet pcs 11.00
57 Television outlet pcs 2.00
58 Cable connection include fititngs ls 1.00
Panel Group Box include breaker and
59 set 1.00
fittings
60 Plastic Chair include fittings set 117.00
61 Natural Stone 150x300mm dark colour m2 8.40
Aluminium Composite Panel 0.42mm thick
62 include hollow 50mm frame, painting and m2 310.00
fittings
Sub Total
IV Public Tribune Works
1 Excavation m3 158.98
Compacted sand bedding 100mm thick
2 m3 15.22
below plat foundation and sloof
Compacted sand bedding 200mm thick
3 m3 94.31
below floor
4 Compacted soil backfilling m3 350.20
5 Base stone/ crushed stone m 3
9.60
6 Stone massonry (1:5) m3 64.44
7 Stranss pile dia.300mm, H=5800mm m3 33.41
8 Pile Cap (PC-2, PC-3) m 3
31.10
9 Column (C3 & CP) m 3
29.60
10 Tie Beam (TB01,TB02 & TB03) m 3
15.26
11 Beam (B2,B3,B4 & CS1) m 3
27.60
12 Plate & Stair 160mm thick m 3
105.73
13 100mm thick Concrete floor (1:2:3) m 3
55.60
14 Wall block masonry (100X200x400mm) m2 1,151.15
15 Wall plastering (1:4) m2 2,302.30
16 Floor tiles 400x400mm m 2
242.00
17 Floor and wall tiles 300x300mm m2 113.40
Gypsum/Calsiboard for ceiling include
18 m2 236.00
hollow 40mm frame and fittings
Roof Zincalume sheet 0.42mm include
19 m2 56.00
hollow 50mm frame and fittings
Hand rail pipe made by G.i. 75mm include
20 ml 172.00
fittings
Wall painting use acrylic emulsion paint (2
21 m2 2,302.30
coats) include plammir
Ceiling painting use acrylic emulsion paint
22 m2 236.00
(2 coats) include plammir
Steel painting use enamel paint (1 coat)
23 m2 70.00
include anti rusty paint

Door (P1) swing type made by solid iron


24 plate with iron frme includes fittings, set 6.00
handle and lock

Door (P2) swing type made by solid clear


25 glass 6mm with aluminium frame includes set 6.00
fittings, handle and lock

Door (P3) single swing type made by


26 aluminium frame and panel includes set 20.00
fittings, handle and lock
Door (P4) single swing type made by
27 aluminium frame and wood panel includes set 9.00
fittings, handle and lock

Window (J1) locket type made by solid


28 clear glass 6mm with aluminium frame set 2.00
includes fitting
Clean water pipe installation use
combination G.I. pipe dia.15-75mm and
29 ls 1.00
PVC pipe 15-75mm include fittings and
testing
Waste water pipe installation use PVC pipe
30 ls 1.00
50-125mm include fittings and testing
31 Monoblock Water Closet sitting type set 20.00
32 Monoblock Hand Basin set 10.00
33 Monoblock Urinoir set 10.00
34 Stainless Shower set set 20.00
35 Stainless Jet shower spray for water closet pcs 20.00
36 Stainless Floor drain pcs 10.00
37 Flourescent Lamp 2x18W set 24.00
38 Flourescent Lamp 1x36W set 7.00
39 PLC Lamp 18W set 26.00
40 Double switch pcs 14.00
41 Single switch pcs 11.00
42 Power outlet pcs 18.00
43 Cable connection include fititngs ls 1.00
Panel Group Box include breaker and
44 set 2.00
fittings
45 Main Panel Box include breaker and fittings set 2.00
Aluminium Composite Panel 0.42mm thick
46 include hollow 50mm frame, painting and m2 190.80
fittings

Sub Total

V Drainage Works
1 Excavation m3 972.34
2 Sand and Soil Fill layer(1:3) m 3
99.78
3 Crusher Gravel 5/7 layer m 3
268.64
4 PVC pipe 1/2'' ml 168.00
5 PVC pipe 6'' ml 1,326.00
6 PVC pipe 8'' ml 540.00
7 Geotextile TS 30 m2 167.90
Reinforcement Control box + concrete
8 m 3
20.48
cover
9 HRPC concrete drain ml 189.40
10 Stone massonry (1:5) m 3
100.98
11 Wall block masonry (100X200x400mm) m 2
268.80
12 Wall plastering (1:4) m 2
403.20
13 Compacted soil back fill m 3
67.16
M.S. Grating made by angle bar and rebar
14 ml 189.40
dia.10mm include painting

Sub Total

VI External Works
1 Excavation m3 413.30
2 Stone massonry foundation m 3
42.30
3 Reinforcement concrete works for fence m 3
77.28
4 Wall block masonry (100X200x400mm) m 2
1,739.00
5 Wall plastering (1:4) m 2
3,478.00
Wall painting use acrylic emulsion paint (2
6 m2 3,478.00
coats) include plammir
7 Compacted soil back fill m3 49.60
Bore water for clean water distribution
8 ls 1.00
include bore pad
Ground tank 25m3 includes distribution
9 unit 4.00
pipe and fitting
Elevated water tank 500 liter include
10 unit 2.00
fittings
11 Water pump include fittings unit 2.00
12 3000mm high BRC fence include fittings ml 380.00
Steel Gate made by iron plate and iron
13 unit 2.00
frame include fitting, painting and lock
Septic tank + absobtion include pipe and
14 unit 4.00
fitting
Name board made by Gold colour of letter
15 ls 1.00
include frame and fittings

Sub Total

Total
TAX
Grand Total
CONSTRUCTION

Amount(NRS)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

You might also like