0% found this document useful (0 votes)
191 views2 pages

OEE Calculation

The document outlines the calculation of Overall Equipment Effectiveness (OEE) which is a measure of how well a manufacturing operation is utilized. It breaks down OEE into its three components: availability, performance efficiency, and quality rate. Various metrics are provided such as planned downtime, operating time, parts produced, defects, and ideal cycle time to calculate the percentages for each component and the overall OEE.

Uploaded by

Sudha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views2 pages

OEE Calculation

The document outlines the calculation of Overall Equipment Effectiveness (OEE) which is a measure of how well a manufacturing operation is utilized. It breaks down OEE into its three components: availability, performance efficiency, and quality rate. Various metrics are provided such as planned downtime, operating time, parts produced, defects, and ideal cycle time to calculate the percentages for each component and the overall OEE.

Uploaded by

Sudha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

OEE

OEE Calculation
Equipment Date 08.09.99
Part Name Shift

Availability
A Total Available time min

B Planned down time min

C Net available time (A-B) 0 min

D Downtime
Taken from Downtime reports Minutes lost
D1 Breakdowns min
D2 Set ups / Adjustments min 0 min
D3 Minor stoppages min
(Operator intervention)

E Operating time (C - D) 0 min

F Equipment Availability (E * 100 / C) #DIV/0! %

Performance Efficiency
G Total Parts run parts
(Good and bad parts)

H Ideal cycle time min/part

J Performance efficiency ( H x G / E) x 100 #DIV/0! %

Quality rate
K Total defects parts
(Rejects and Scrap)

L Quality rate ( G - K ) x 100 / G #DIV/0! %

Overall Equipment Effectiveness

M OEE ( F x J x L ) / 10,000 #DIV/0! %