0% found this document useful (0 votes)
43 views

Dialy Work Report: PT Pioneer

PT Pioneer conducted a top overhaul of the engines on vessel TB. Tirtayasa V - 208. They overhauled the starboard engine (6 AYM-ETE No. 1603) from October 14-23, 2014 and the port engine (6 AYM-ETE No. 1604) from October 16-23, 2014. The work included disassembling, cleaning, replacing parts as needed, and reassembling components such as the cylinder heads, fuel injection valves, manifolds, coolers, and turbochargers.

Uploaded by

rizky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Dialy Work Report: PT Pioneer

PT Pioneer conducted a top overhaul of the engines on vessel TB. Tirtayasa V - 208. They overhauled the starboard engine (6 AYM-ETE No. 1603) from October 14-23, 2014 and the port engine (6 AYM-ETE No. 1604) from October 16-23, 2014. The work included disassembling, cleaning, replacing parts as needed, and reassembling components such as the cylinder heads, fuel injection valves, manifolds, coolers, and turbochargers.

Uploaded by

rizky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

PT PIONEER

DIALY WORK REPORT


CUSTOMER : PT. JASA ARMADA INDONESIA

ADDRESS
NAME of VESSEL : TB. TIRTAYASA V - 208
ENGINE MODEL : 6 AYM - ETE
ENGINE NO. : STBD 1603
CONTACT PERSON : MR. BUDI
TYPE OF WORK : TOP OVERHAUL 6 AYM-ETE NO.1603 (STARBOARD)
DATE DETAILS OF WORK
10/14/2014 - Disassemble the cover and tube of fresh water cooler
- Disassemble the cover and tube of intercooler (air cooler)
- Disassemble the fuel pipe
- Disassemble the turbocharger inlet pipe
- Disassemble the turbocharger components
- Disassemble the suction manifold and exhaust manifold
- Disassemble the rocker arm, push rod and bridge valve
- Disassemble the cylinder head No. 1 - 6
- Disassemble the lubricant oil cooler
- Disassemble the suction valve and the exhaust valve from cylinder head

10/15/2014 - Cover, core and tube of fresh water cooler cleaned


- Cover, core and tube of inter cooler (air cooler) cleaned
- Cylinder head No. 1 - 6 cleaned
- Cover core and tubes of lubricant oil cooler cleaned
- Engine block cleaned
- Suction and exhaust manifold cleaned
- Bonets, push rod, rocker arm and bridge valve cleaned
- the suction valve and the exhaust valve lapping

10/16/2014 - Assemble the fresh water cooler


- Assemble the intercooler (air cooler)
- Measure the exhaust valve and suction valve
- Assemble the valve steam seals cylinder head No. 1 - 6
- Assemble the cylinder head No. 1 - 6
- Tie cylinder head bolts with torque 44 kg/cm
- Assemble the push rod, bridge and rocker arm
- Assemble the suction valve and the exhaust manifold

JALAN IR.H. JUANDA NO. 40-42 - JAKARTA 10120 INDONESIA


PHONE : (021) 3448486, (021) 2312312 (EXT.300 - 303) FAX : (021) 3848995, (021) 3846558
e-mail : [email protected], http : //www.pioneer-trading.com

PT PIONEER
DIALY WORK REPORT
CUSTOMER : PT. JASA ARMADA INDONESIA

ADDRESS
NAME of VESSEL : TB. TIRTAYASA V - 208
ENGINE MODEL : 6 AYM - ETE
ENGINE NO. : STBD 1603
CONTACT PERSON : Mr Budi
TYPE OF WORK : TOP OVERHAUL 6 AYM-ETE NO.1603 (STARBOARD)
DATE DETAILS OF WORK
10/17/2014 - Turbocharger components cleaned
- Assemble the fuel pipe
- Zinc anti-corrosive replaced
* For a Temporarily the job stopped due welding in the engine room

10/21/2014 - Disassemble and cleaned fuel injection valve No. 1 - 6


- Lapping fuel injection valveNo. 1 - 6
- Test preassure fuel injection valve No. 1 - 6
- Adjust pressure fuel injection valveat a pressure 31 Mpa

10/22/2014 - Assemble fuel injection valve cylinder head No. 1 - 6


- Check clearence of turbocharger
- Assemble the sea water pipe and fresh water pipe

10/23/2014 - Check sea water pump


- Sea water pump impeller replaced
- Engine oil crankcase cleaned
- Filter turbo charger cleaned
- Assemble the filters turbo charger
JALAN IR.H. JUANDA NO. 40-42 - JAKARTA 10120 INDONESIA
PHONE : (021) 3448486, (021) 2312312 (EXT.300 - 303) FAX : (021) 3848995, (021) 3846558
e-mail : [email protected], http : //www.pioneer-trading.com

PT PIONEER
DIALY WORK REPORT
CUSTOMER : PT. JASA ARMADA INDONESIA

ADDRESS
NAME of VESSEL : TB. TIRTAYASA V - 208
ENGINE MODEL : 6 AYM - ETE
ENGINE NO. : PORT 1604
CONTACT PERSON : Mr Budi
TYPE OF WORK : TOP OVERHAUL 6 AYM-ETE NO.1604 (PORT)
DATE DETAILS OF WORK
10/16/2014 - Disassemble the cover and tube of fresh water cooler
- Disassemble the cover and tube of intercooler (air cooler)
- Disassemble the fuel pipe
- Disassemble the turbocharger inlet pipe
- Disassemble the turbocharger components
- Disassemble the suction manifold and exhaust manifold
- Disassemble the rocker arm, push rod and bridge valve

10/17/2014 - Disassemble the cylinder head No. 1 - 6


- Disassemble the lubricant oil cooler
- Disassemble the suction valve and the exhaust valve from cylinder head
- Engine block cleaned
* For a Temporarily the job stopped due welding in the engine room

10/18/2014 - Cover, core and tube of fresh water cooler cleaned


- Cover, core and tube of inter cooler (air cooler) cleaned
- Cylinder head No. 1 - 6 cleaned
- Cover core and tubes of lubricant oil cooler cleaned
- Suction and exhaust manifold cleaned
- Bonets, push rod, rocker arm and bridge valve cleaned
- the suction valve and the exhaust valve lapping
* For a Temporarily the job stopped due welding in the engine room and Balasting on the deck

10/19/2014 - Continuing the suction valve and the exhaust valve lapping
- Measure the exhaust valve and suction valve
- Suction manifold cleaned
* For a Temporarily the job stopped due welding in the engine room and Balasting on the deck

JALAN IR.H. JUANDA NO. 40-42 - JAKARTA 10120 INDONESIA


PHONE : (021) 3448486, (021) 2312312 (EXT.300 - 303) FAX : (021) 3848995, (021) 3846558
e-mail : [email protected], http : //www.pioneer-trading.com

PT PIONEER
DIALY WORK REPORT
CUSTOMER : PT. JASA ARMADA INDONESIA

ADDRESS
NAME of VESSEL : TB. TIRTAYASA V - 208
ENGINE MODEL : 6 AYM - ETE
ENGINE NO. : PORT 1604
CONTACT PERSON : Mr Budi
TYPE OF WORK : TOP OVERHAUL 6 AYM-ETE NO.1604 (PORT)
DATE DETAILS OF WORK
10/20/2014 - Assemble the valve steam seals cylinder head No. 1 - 6
- Assemble the cylinder head No. 1 - 6
- Tie cylinder head bolts with torque 44 kg/cm
- Assemble the push rod, bridge and rocker arm
- Assemble the suction valve and the exhaust manifold
- Assemble the fresh water cooler
- Assemble the intercooler (air cooler)
- Turbocharger components cleaned
- Assemble the fuel pipe
- Zinc anti-corrosive replaced

10/21/2014 - Disassemble and cleaned fuel injection valve No. 1 - 6


- Lapping fuel injection valveNo. 1 - 6
- Test preassure fuel injection valve No. 1 - 6
- Adjust pressure fuel injection valveat a pressure 31 Mpa

10/22/2014 - Assemble fuel injection valve cylinder head No. 1 - 6


- Check clearence of turbocharger
- Assemble the sea water pipe and fresh water pipe
- Zinc anti-corrosive replaced

10/23/2014 - Check sea water pump


- Sea water pump impeller replaced
- Engine oil crankcase cleaned
- Filter turbo charger cleaned
- Assemble the filters turbo charger

JALAN IR.H. JUANDA NO. 40-42 - JAKARTA 10120 INDONESIA


PHONE : (021) 3448486, (021) 2312312 (EXT.300 - 303) FAX : (021) 3848995, (021) 3846558
e-mail : [email protected], http : //www.pioneer-trading.com

You might also like