Life Cycle Integrity Management: Pre-Feed & Feed

During each stage of an oil and gas asset's lifecycle, from initial planning through decommissioning, integrity processes ensure the asset's integrity is maintained. The key stages are pre-front end engineering design (pre-FEED), FEED, design, construction & commissioning, operations, and decommissioning. During pre-FEED and FEED, integrity objectives are to determine feasibility and define cost-effective solutions, which may include assessing corrosion conditions to select materials of construction.

Uploaded by

Dana Guerrero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
463 views1 page

Life Cycle Integrity Management: Pre-Feed & Feed

During each stage of an oil and gas asset's lifecycle, from initial planning through decommissioning, integrity processes ensure the asset's integrity is maintained. The key stages are pre-front end engineering design (pre-FEED), FEED, design, construction & commissioning, operations, and decommissioning. During pre-FEED and FEED, integrity objectives are to determine feasibility and define cost-effective solutions, which may include assessing corrosion conditions to select materials of construction.

Uploaded by

Dana Guerrero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Life Cycle Integrity Management

During the lifecycle of an oil and gas asset, activities are carried out that ensure
the integrity of the asset to be maintained from first operation through to
decommissioning. This article describes the key integrity processes that are
required during each of the stage of the asset lifecycle.
The lifecycle stages of a project comprise of:
Pre-FEED
FEED
Design
Construction & Commissioning
Operations
Decommissioning
Pre-feed
Design
Construct
Operations
Decommissioning
Field Extension
FEED
Factors that contribute to integrity of the facility during each of the phases are discussed
below.
Pre-FEED & FEED
Pre FEED and FEED are the stages of a project that enable scope to be defined in more
detail and risks minimized thereby reducing the overall project costs. Pre-FEED refers
to the concept stage of the project where the integrity objectives are to determine the
overall feasibility of a project and define a cost effective solution for delivery. At this
early stage only general proposals for integrity control are normally addressed, for
example, what generic options should be considered that are likely to be cost effective.
At the pre-FEED stage it is typical to carry out a high level assessment of corrosion
conditions to determine whether carbon steel (with or without chemical treatment) is a
suitable material or whether high capital cost corrosion resistant materials will be
required. This stage involves assessment of fluid from early explorations and high level
life cycle costs. These are combined with an assessment of the uncertainty in the data
available and the acceptable level of risk for the asset to select the main materials of
construction (typically pipelines and high cost facilities)