Methods and Details of All Tests and Inspections (Stringing Work)
Methods and Details of All Tests and Inspections (Stringing Work)
DOCUMENT No. :
PLN APPROVAL NO. : 2013/REP/TL/S/B-III/01/010
CONTRACTORS NO. : HI-E-TL-TL-R2-00050-A
ISSUE STATUS
-OCTOBER-2017
DOC.No. : HI-E-TL-TL-
RAJAMANDALAHYDROELECTRICPOWERPLANT147MW R2-00050-A
METHODS AND DETAILS OF ALL TESTS AND Issue Date :
INSPECTIONS (STRINGING WORK) Rev.No. :
Page :
CONTENTS
1. Purpose
2. Scope
2.1. Check List for Tower Erection
2.2. Tower Inspection Report
2.3. Torque Bolt for Erection of Tower
2.4. Test Earthing System / Grounding
1. Purpose
This purpose of this inspection and test plan is to describe the process of
Inspection and Test which will perform at site to accomplish the Rajamandala
Transmission Line 150kV works.
2. Scope