Prefabricated Bridge Elements and Systems (PBES) are structural components of a bridge built offsite
Example 3 Hybrid C.I.P./Precast Hammerhead Pier
or in a near site casting yard in order to reduce onsite construction time as compared to conventional WEST
PALM
BEACH
Sheet 1 of 6 Pier Details FT MYERS
construction methods. PBES components and details will vary from project to project. These drawings
Sheet 2 of 6 Pier Details 75
are not standards or preferred details; these drawings are concepts intended to assist the Designer in NAPLES
the development of project specific components and details. Notes to Designers have been provided as
Sheet 4 of 6 Pier Details MIAMI
boxed text in the drawings. The information presented in this document should not be relied upon for
Sheet 5 of 6 Pier Details
specific application without competent professional examination and verification of accuracy, suitability,
Sheet 6 of 6 Pier Details
and applicability by a licensed Professional Engineer.
FISCAL SHEET
YEAR NO.
INFORMATION SHOWN IS FOR CONCEPT ONLY.
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.
1
2" Grout Joint
1
2" Grout Joint
Dowels for
insertion into
Couplers
Mechanical
Grouted
Coupler
Reinforcing Coupler
System
Sleeve System
Bridge
)
Typ.
Column Column
Column Prestressed
Concrete Piles (Typ.)
NOTES:
1. For Detail "A" at Match-Cast Joint see Sheet 3 of 4.
2. For Detail "B" at " Grout Joint see Sheet 4 of 4.
3. For Precast Column Segments, see Sheet 3 of 4. Require one full-scale mock-up of each unique grouted joint. Require component-to-component fit-up in the casting INFORMATION SHOWN IS FOR CONCEPT ONLY.
4. For Precast Pier Cap Details, see Sheet 4 of 4. yard of all components prior to shipping to the erection site. In lieu of component-to-component fit-up, the contractor APPLICATION IS DESIGNER'S RESPONSIBILITY.
may demonstrate interfacing elements or precast components do not conflict through the use of a transfer template. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.
Column
Column Column
A A
Alignment Key
H"
"
Mechanical
Coupler System
See Detail 'A'
B B
Key for alignment of
adjacent Precast Column
Section at Match-Cast Joint.
Match-Cast Joint
SECTION A-A SECTION B-B
ELEVATION (Typ. @ all Match-Cast Joints)
Mechanical
Couplers
C C
Grout
Tube
(Typ.)
Couplers and
Ties must
Match-Cast Joint meet cover
requirements.
A B C
Pier
Column
Pier
Grout Tubes
E E
Grout
SECTION D-D
SECTION A-A
Specify non-metallic shims (left in place) and DETAIL 'B'
Pier maximum shim height. Specialty Engineer is
to provide shim placement and loads as part
of the Erection Plan requirements.
1
2" Grout Joint with
Shim for Grade Control
Pre-Cast Column
Drilled Shaft
Connection
Dowels
(Plan Location)
Drilled Shaft
Rebar Cage
Grouted Splice
Coupler (Typ.)
1
2" Grout Joint
Foundation
Shim
Dowels
Grouted Splice
Joint
Foundation Foundation
Foundation
Pier
Dia.
Dia.
A A
Pseudo Match-Cast
Surface (Typ.)
Cast-In-Place Hammerhead
Pier Column and Pier Head
PT Ducts
Dowels for
Rebar Grouted
Sleeve Couplers
Shear Keys
B B
Dowels for
Rebar Grouted
Sleeve Couplers
ELEVATION
VIEW A-A
VIEW C-C
Size Precast Pier Wing for construction equipment and boom reach
using site specific construction access assessment. For over-land
Grouted Rebar
projects, include haul route assessment for element sizing.
Sleeve Couplers
ECI 6- 19
PT Ducts
ECI 6- 19
Shear Keys
Grouted
Rebar
Coupler
PLAN
F G
Grouted
Rebar
H
Coupler
ELEVATION
A Temporary PT System (Temporary PT Bars
shown) provides a compressive stress across the
Pseudo Match-Cast Joint until the epoxy has
cured. See LRFD 5.14.2.4.2 for requirements.
Temporary PT Bars
PT Bar (Typ.)
PT Bar (Typ.)
PT Bar (Typ.)
SECTION H-H
PT Bar (Typ.)
Grouted Rebar
Coupler (Typ.)
VIEW J-J
Left Steel
Bulkhead
Shear Key
24'-0" 1'-0"
Stage 2 Notes:
1. Precast the required number of Match-Cast Wings using a Pseudo Pier Head Form.
2. Submit a Pseudo Match-Casting Process and Mock-Up Test Procedure to the
Engineer for review and approval. A Mock-Up Test of the Joint shall be performed
successfully prior to beginning installation. The Mock-Up shall consist of the
following:
a. Same surface area and shear keys as depicted in the final constructed Joint.
b. Two-faced epoxy.
c. Provide a stress of 40 psi uniform compression across Joint.
d. Measure stress at joint interface (6 locations) using pressure cells.
Pseudo Pier Head Form
e. All measured stresses shall be between XXX psi and XXXX psi. Provide a report
documenting the process and results. If measured stress falls outside of the
XXX-XXXX psi range, resubmit revised Pseudo Match-Casting Process and
Mock-Up Test Procedure to the Engineer for review and approval. Repeat the
process on a new test specimen until test requirements are met.
Formwork
STAGE 2
(PSEUDO MATCH-CAST PROCESS)
INFORMATION SHOWN IS FOR CONCEPT ONLY.
LEFT PRECAST CANTILEVER SHOWN; RIGHT PRECAST CANTILEVER SIMILAR
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.
STAGE 1 STAGE 3
Grout PT Tendons
STAGE 2 STAGE 4
Closure Pour
Rebar Cage/Plug
for Pile/Cap Connection
Cast-In-Place
Column Connection
Square
Prestressed
Concrete Pile
Shear Key
Pattern
Pile Void
Pre-Cast
Foundation
Plug
Plug
A A Pier
NOTES:
Form Shear Key with removable Specify shrinkage reducing Vent PVC Pipes
corrugated pipe for transfer of admixture and seven day
Pile
C C moist cure.
shear without need for
Grout and cover
reinforcement through plug-cap
Vents after use.
interface. Use hard pocket former
E E
Two-phase pour
Horizontal area for Shims consisting of
Pile
grouting to seal,
Use non-metallic shims (to be
SECTION A-A
Seal then monolithic
left in place). Specify maximum
concrete pour.
Inclined surface typical
shim height. Specialty Engineer Column
to minimize potential for
to provide shim placement and F F Class VI Concrete w/silica fume
trapped air and
loads as part of the erection (XXXX psi) (Min.)
honeycombing. Also
plan requirements.
facilitates concrete infill D D
placement around Pile.
Pile Void
3" pile
placement
tolerance.
Plug
SECTION F-F
PILE CONNECTION DETAIL
Void
Pedestal Cast
Monolithically with
Plug Closure
1
2" Grout Joint
Pre-Cast
Cap
Rebar Cage
* Fiction Collar
not shown for Plug
clarity
Step 5: Presoak
5 hours to SSD
condition. Cast
Plug and Pedestal.
Step 4: Field
Bend Pedestal
Bars
High Capacity Square
Prestressed Concrete Piles
Step 3: Insert Cage/Plug
See Detail 1
ELEVATION C C
Precast Concrete Cap
Pier Cap
Pier Cap
Beam
Concrete Prestressed
Pile (Type I) (Typ.)
SECTION B-B
SHEAR KEY DETAIL
Concrete Prestressed
Pile (Type I) (Typ.)
SECTION A-A
VIEW C-C
CAP/PILE INTERFACE REINFORCEMENT NOT SHOWN FOR CLARITY
D D A
C B
C B
Concrete Prestressed
Pile (Type I) (Typ.)
VIEW D-D
A
INFORMATION SHOWN IS FOR CONCEPT ONLY.
ELEVATION APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.
Size hole diameter for 3" pile 3. Erect Cap on temporary supports to appropriate elevations. Install Form around top of Pile and
placement tolerance. Use hard under Cap (if necessary). Ensure the surface of Cap and Pile are prepared in accordance with
to mitigate shrinkage cracks. Specify shrinkage reducing Phase one - use grout and friction collar to level Cap.
admixture and seven day Phase two - place concrete in Cap and Pile.
moist cure. 5. Contractor shall vibrate concrete to reduce the potential of trapping air in concrete.
6. After concrete reaches a strength of XXXX psi, remove Form at top of Pile.
7. Place zero slump grout at all locations not fully concreted in previous operations. All concrete
Require friction collars on
surfaces shall be wetted to Saturated Surface Dry (SSD) conditions prior to grouting.
piles to support cap prior to 1
2" Grout Joint
grouting. Do not use shims to
support cap due to the small
bearing area they provide and
because they tend to block the
flow of grout resulting in an Top of Pile EL.
insufficiently grouted interface.
A A
SECTION A-A
Seal Plug
NOTES:
Concrete Prestressed Pile & Void
1. Work this sheet with Bent Details Sheet 1 of 2.
2. Venting of the voided piles shall be provided by the use of 1" PVC conduit & shall remain open.
Contractor shall provide a galvanized steel wire cloth with 12" x12" mesh and 0.063" diameter wires over
the vent pipes to prevent vermin and debris from entering the void.
PGP
Construction Joint Construction Joint
SUPERSTRUCTURE SECTION
EPS
TYPICAL SECTION
JOINT DETAIL AT BEGIN/END BRIDGE
POCKET DETAIL Space Units and provide flexibility in Bearing Design to better accommodate shrinkage of
Topping. Specify gap distance greater than combined construction plus fabrication tolerances.
Staggered Hooks to
ELEVATION
facilitate placement
Staggered Hooks/
Headed Bars to
PLAN
facilitate placement
Coupler
Connections
Link Bar
Dowels for
Coupler Connection
Tolerance of Closure
Pour determined by gap
Hooked Bars
between Hooked Bars,
Hook Bar development
length, and fit of "U"
Shaped Rebar.
D/2 D/2
Precast Element/
Closure Pour U-Shaped Rebar
C.I.P. Closure Pour
(Top and Bottom)
P. Closure Pour
U-Shaped Bar
Coupler (Typ.) Stirrup Pairs
(Lapped)
I.
C.
Precast
Dowels from
Precast Element
Rotate Bars
as required
A U-Shaped Rebar
Precast Element Precast Element Dowels from
(Top and Bottom)
Precast Element
(Measured along D
Precast Element) Dimension "D" determined Precast Element/
D/2 D/2 by Hook Splice length. C.I.P. Closure Pour
B
Provide additional Confinement
Steel for Non-Contact Lap Splice. SECTION B-B
INFORMATION SHOWN IS FOR CONCEPT ONLY.
OVERLAP SPLICE
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.