1. This document provides a load schedule and circuit details for a lighting panel (LP) and power panel (PP). 2. The LP contains 4 circuits to power lighting fixtures on the first, second, third floors and deck. The total load is 732VA. 3. The PP contains 14 circuits to power various loads including outlets, water heaters, pumps, appliances and air conditioners. The loads require a total of 48.18A from a 250AT main breaker.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
344 views1 page

Load Schedule and Single Line Engr Gorospe

1. This document provides a load schedule and circuit details for a lighting panel (LP) and power panel (PP). 2. The LP contains 4 circuits to power lighting fixtures on the first, second, third floors and deck. The total load is 732VA. 3. The PP contains 14 circuits to power various loads including outlets, water heaters, pumps, appliances and air conditioners. The loads require a total of 48.18A from a 250AT main breaker.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LIGHTING PANEL

LP

LOAD SCHEDULE 2 - 3.5 mm mm mm


LP 20 AT, 100 AF, 2P, 230V Circuit Breaker 35AT

L.O. C.O. Cable Breaker Conduit 15AT 15AT


Ckt No. UNITS UNITS ACU Load Description VA Volt Amp
mm G mm AT/AF IMC (mm ) LIGHTING FIRST FLOOR 1 2 LIGHTING SECOND FLOOR
15AT 15AT
1 11 Lighting Fixture w/ exhaust fan 246 230 1.07 2-3.5 1-3.5 15 100 15
LIGHTING THIRD FLOOR 3 4 LIGHTING DECK
2 13 Lighting Fixture w/ exhaust fan 230 230 1 2-3.5 1-3.5 15 100 15
3 9 Lighting Fixture 108 230 0.47 2-3.5 1-3.5 15 100 15
4 10 Lighting Fixture 148 230 0.64 2-3.5 1-3.5 15 100 15

TOTAL 732 3.18 1-14.0mm


Ground

LOAD SCHEDULE 2 - 60 mm mm mm
PP 175 AT, 200 AF, 2P, 230V Circuit Breaker
POWER PANEL
L.O. C.O. Cable Breaker Conduit PP
Ckt No. UNITS UNITS HP Load Description VA Volt Amp
mm G mm AT/AF IMC (mm )
1 3 Convenience Outlet Waterproof 540 230 2.35 2-3.5 1-3.5 15 100 15
250AT
2 1 Water Heater 1500 230 6.52 2-3.5 1-3.5 15 100 15
15AT 15AT
3 7 Conveniece Outlet 1260 230 5.48 2-3.5 1-3.5 15 100 15
Convenience Outlet WP 1 2 Water Heater
4 1 Electric Range 7000 230 30.43 2-3.5 1-3.5 40 100 15
15AT 40AT
5 1/3 Water Pump 828 230 3.6 2-3.5 1-3.5 15 100 15 Electric Range
Convenience Outlet 3 4
6 1 Water Heater 1500 230 6.52 2-3.5 1-5.5 15 100 15 15AT 15AT

7 7 Convenience Outlet 1260 230 5.48 2-3.5 1-3.5 15 100 15 Water Pump 5 6 Water Heater

8 7 Convenience Outlet 1260 230 5.48 2-3.5 1-3.5 15 100 15 15AT 15AT

Convenience Outlet 7 8 Convenience Outlet


9 1 Washer 5000 230 21.74 2-5.5 1-3.5 30 100 15
10 1 Dryer 5000 230 21.74 2-5.5 1-3.5 30 100 15 30AT 30AT

9 10 Dryer
11 5 Convenience Outlet Water Proof 900 230 3.91 2-3.5 1-3.5 15 100 15 Washer
15AT 15AT
12 2 Split Type ACU 2760 230 12 2-5.5 1-5.5 15 100 15
Convenience Outlet WP 11 12 FCU
13 1.5 Split Type ACU 2300 230 10 2-3.5 1-3.5 15 100 15
15AT 15AT

14 1.5 Split Type ACU 2300 230 10 2-3.5 1-3.5 15 100 15 FCU
FCU 13 14
15 1.5 Split Type ACU 2300 230 10 2-3.5 1-3.5 15 100 15 15AT 15AT

16 1.5 Split Type ACU 2300 230 10 2-3.5 1-3.5 15 100 15 FCU 15 16 FCU

17 1 Laundry Circuit 1500 230 6.52 2-3.5 1-3.5 100 15


15 15AT

Laundry Circuit 17 18 Spare


18 Spare

19 Spare
Spare 19 20 Spare
20 Spare

TOTAL 41808 171.77

1-14.0mm
Ground

E7 LOAD SCHEDULE E7 SINGLE LINE DIAGRAM


1 SCALE 1:100 2 SCALE 1:100

PROJECT OWNER: SHEET TITLE: SHEET NO. :


FEU - INSTITUTE OF TECHNOLOGY
DE CHAVEZ, ALJON G. LOAD SCHEDULE AND
EEE DEPARTMENT SINGLE FAMILY DWELLING UNIT GOROSPE, MARIA ANGELICA C. E6
SINGLE-LINE DIAGRAM