Manufacturer Data: Job # Humidity Test Status Asset Id Date °F

FADFF

Uploaded by

Corey Porter
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Manufacturer Data: Job # Humidity Test Status Asset Id Date °F

FADFF

Uploaded by

Corey Porter
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

RELAY TEST REPORT

DATE 14/09/2017 PAGE 1

AMBIENT TEMP. F JOB #

SUBSTATION GTG-1 HUMIDITY % ASSET ID F34

POSITION TEST STATUS

EQUIPMENT LOCATION

Counter Clockwise Rotation 0-360 Lag


MANUFACTURER DATA
MANUFACTURER ABB MODEL REG316*4 SERIAL NUMBER HE701813-10/1
DEVICES OPERATED RK A PT RATIO 11 kV : 110 V

INSTRUCTION BOOKLET

3,200 :1 A 31.15 MW 11 kV 3,200 :1 A

1,634.95 A 1,634.95 A

0.511 A
0.511 A

Interposing CTs

Use I1,I2,I3 Use I4,I5,I6

Pickup 0.1 PU Pickup Tolerance 30 % Slope Through Origin

Trip Time 150 ms Trip Time Tolerance 30 % + 50 ms IBias Equation (|Ip| + |Is|)

Prefault Level 100 % Simulate Breaker NO Unrestrained Pickup 8

Prefault Time 500 ms Use Reference Voltage NO Slope IBias (p.u.) Gradient (%)
1 0.63 25
Off Delay 50 ms
2 1.5 25
Through Fault 100 %

Fault Duration 500 ms

Nominal Current Protected Object


Nameplate Format IEC

TEST EQUIPMENT USED: FREJA406 (SN201304060032) TESTED BY:

COPYRIGHT 2002-2017 POWERDB, INC. www.powerdb.com Form Schema 0, REVISED 06/07/2015


RELAY TEST REPORT

PAGE 2

Stabilization Test
Injected Currents Currents Observed From Relay
Phase

W1 W2 W1 W2
IBias IDiff
RMS (A) RMS (A) RMS (A) RMS (A)
0.511 0 0.511 180
R 0.000 0 0.000 0 0 0
1,634.9 0 1,634.9 180
0.511 120 0.511 300
Y 0.000 0 0.000 0 0 0
1,634.9 120 1,634.9 300
0.511 240 0.511 60
B 0.000 0 0.000 0 0 0
1,634.9 240 1,634.9 60

Stabilization Test Passed

Timing Test
Phase Fault Current Expected Maximum Trip Pass /
Tested % of Ibase Trip Time (s) Trip Time (s) Time (s) Fail

R 100.0 0.150 0.245 0.037 Pass

Y 100.0 0.150 0.245 0.033 Pass

B 100.0 0.150 0.245 0.038 Pass

RYB 100.0 0.150 0.245 0.033 Pass

Pickup Test
Primary Winding Secondary Winding
Phase

Pickup Percent Pickup Percent


Pickup Pickup Pass / Pickup Pickup Pass /
Setting Error Setting Error
(pu) (pu) (A) (%) Fail (pu) (pu) (A) (%) Fail

R 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

Y 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

B 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

RYB 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

COPYRIGHT 2002-2017 POWERDB, INC. www.powerdb.com Form Schema 0, REVISED 06/07/2015


RELAY TEST REPORT

PAGE 3

Slope Test (RYB)


Ibias Idiff W1 W2 Error Pass /
# (pu) (pu) (A) (A) (%) Fail

1 5.80 1.07 1.76 1.21 -26.0 Pass ...