0% found this document useful (0 votes)
174 views5 pages

Pad Foundation (1000x300)

The document provides details of the calculation for the pad foundation of a proposed pre-treatment plant with a loading of 50 kN/m2. It finds that the initial rebar design is not sufficient to support the pressure below the pad footing. An updated rebar design is then provided with thicker rebar that is sufficient to support the pressure.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
174 views5 pages

Pad Foundation (1000x300)

The document provides details of the calculation for the pad foundation of a proposed pre-treatment plant with a loading of 50 kN/m2. It finds that the initial rebar design is not sufficient to support the pressure below the pad footing. An updated rebar design is then provided with thicker rebar that is sufficient to support the pressure.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

THE CALCULATION WITH 50kN/m2 OF LOADING

B K TAN CONSULTANTS
Job No: Sheet No:
Project: 06 JALAN BUROH

Subject: Designed By: Date:


PAD FOUNDATION FOR PROPOSED PRE- TRANG 11-Sep-17
TREATMENT PLANT Checked By: Date:
BKTAN 11-Sep-17
MATERIAL:
Concrete grade: 40 N/mm2
Steel grade: 460 N/mm2

LOADING:
Loading: 50 kN/m2
Selfweight of RC Plinth 7.2 kN/m2
Imposed load: 5 kN/m2

SOIL BEARING CAPACITY CHECK & REBAR DESIGN:

Dimension of pad RC Plinth:


B= 4.9 m Soil bearing capacity: 50 kN/m2
L= 33.6 m

1. Pressure below RC Plinth: 62.2 kN/m2 > 50 kN/m2 NOT OK


2. Rebar design:
Load: 62.2 kN/m2
Factored load: 88.1 kN/m2

Mmax= 99.1 kNm Vmax= 132.1 kN


b= 1000 mm
h= 300 mm d= 260 mm

M
K= = 0.037 < K' = 0.156
b.d2.fcu
z = d(0.5+(0.25-K/0.9)^0.5) = 248.9 mm
M
As = = 995 mm2
0.87.fy.z
Choose rebar:
T 16 @ 200 As= 1005 mm2 OK
Shear checking:
100As/bd= 0.39
vc= 0.79{100As/(bvd)}^(1/3) (400/d)^(1/4)/gm
vc = 0.09
v= Vmax/bd= 0.05 > 0.5vc= 0.045
Asv= 0.4bvsv/0.87fyv= 200 mm2
Links: T 13 @ 200
Asv= 664 mm2 OK
BKTAN CONSULTANTS
PROJECT STUDENT CARE CENTRE AT 300 TANGLIN HALT ROAD
Designed by: Date:
CLIENT CPG TRANG 9/11/2017
CODE Checked by: Revision:
JOB 1000x300mmTHK RC PAD FOOTING BKT 1
MATERIAL:
Concrete grade: fcu= 30 N/mm2
Steel grade: fy = 250 N/mm2
From staad pro:
Node 2: DL= 19.95 kN
LL= 26.25 kN
Total: 46.21 kN

SOIL BEARING CAPACITY CHECK & REBAR DESIGN:


Dimension of RC Plinth:
B= 1m Allowable soil bearing capacity: 50 kN/m2
L= 1.9 m
d= 0.3 m
Selfweight of pad footing: 7.2 kN/m2
Total unfactored load= 46 kN
1. Pressure below RC Plinth: 31.3 kN/m2 < 50 kN/m2 OK
2. Rebar design:
Load: 31.3 kN/m2
Factored load: 46.9 kN/m2
Considered 1m wide of pad footing:
Mmax= 15.7 kNm Vmax= 45.0 kN
b= 1000 mm
h= 300 mm d= 260 mm
M
K= = 0.008 < K' = 0.156
b.d2.fcu
z = d(0.5+(0.25-K/0.9)^0.5) = 257.7 mm
M
As = = 152 mm2
0.87.fy.z
Choose BRC A7 7 @ 200 As = 192 mm2 OK
CONSULTANTS
Date:
9/11/2017
Revision:
1

kN/m2
BKTAN CONSULTANTS
PROJECT STUDENT CARE CENTRE AT 300 TANGLIN HALT ROAD
Designed by: Date:
CLIENT CPG TRANG 9/11/2017
CODE Checked by: Revision:
JOB 700x700x200mmTHK RC PAD FOOTING F1 BKT 1
MATERIAL:
Concrete grade: fcu= 30 N/mm2
Steel grade: fy = 250 N/mm2
From column C1:
Total: 12.56 kN

SOIL BEARING CAPACITY CHECK & REBAR DESIGN:


Dimension of RC Plinth:
B= 0.7 m Allowable soil bearing capacity: 50 kN/m2
L= 0.7 m
d= 0.2 m
Selfweight of pad footing: 4.8 kN/m2
1. Pressure below RC Plinth: 30.4 kN/m2 < 50 kN/m2 OK
2. Rebar design:
Factored load: 30.4 kN/m2
Considered 0.7m wide of pad footing:
Mmax= 10.4 kNm Vmax= 14.9 kN
b= 700 mm
h= 200 mm d= 160 mm
M
K= = 0.019 < K' = 0.156
b.d2.fcu
z = d(0.5+(0.25-K/0.9)^0.5) = 156.5 mm
M
As = = 167 mm2
0.87.fy.z
Choose BRC A7 7 @ 200 As = 192 mm2 OK