0% found this document useful (0 votes)
257 views9 pages

Project Deliverable 1: Project Plan Inception

The document provides details about ABC Corp, a company that collects and analyzes web data using various analytics tools. It discusses the company's background, business processes, outsourcing activities, personnel, and information systems. ABC Corp is looking to upgrade its IT infrastructure and systems to handle rapid growth expected over the next 18 months. It currently outsources legal work and offshore development. Data collected includes website visitors, page views, repeat visitors, customer feedback and behaviors. The company uses various web analytics tools and information systems to process and analyze the collected data.

Uploaded by

nelson gomes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
257 views9 pages

Project Deliverable 1: Project Plan Inception

The document provides details about ABC Corp, a company that collects and analyzes web data using various analytics tools. It discusses the company's background, business processes, outsourcing activities, personnel, and information systems. ABC Corp is looking to upgrade its IT infrastructure and systems to handle rapid growth expected over the next 18 months. It currently outsources legal work and offshore development. Data collected includes website visitors, page views, repeat visitors, customer feedback and behaviors. The company uses various web analytics tools and information systems to process and analyze the collected data.

Uploaded by

nelson gomes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Running head: PROJECT PLAN INCEPTION 1

Project Deliverable 1: Project Plan Inception

Nelson Gomes

Professor Abedin

CIS 499: Information Systems Capstone

October 16th, 2016


PROJECT PLAN INCEPTION 2

Introduction
ABC Corp is million-dollar company which deals in data collection and analytics. The

company has grown in last two years and is expected to grow rapidly in next 18 months. The

companys most important assets are information and is important function for the organization

and it has to be dealt with very carefully and negotiated in the authority protocols, which

furthermore, should be in accordance with the latest outlays and regulations that are laid by the

authorities and well established codes of conduct and dealing with information. The aim of the

paper is to research the current state of organization in terms of its business processes, IT

alignment, personnel and outsourcing activities.

Background information of company


The aforementioned organization also deals with the information basics and the dealings

of various outlays of structured information and collects records for further development. The

company deals in collecting and analyzing web data with the use of various web analytics tools.

A while ago expressed companionship furthermore deals with the information basics and the

dealings of diverse costs of sorted out information and accumulates records for further change.

The association has been working together of social affair data which is in a way amazingly

helpful for the further progression of the operational structure data and securities (Loftus, 2012).

For the past 2 years the company has been in business of collecting data which is in a

way very useful for the further development of the operational system data and securities. The

data is collected to practice current trends, insecurities, business information for their clients. The

company has seen a tremendous growth in business in past two years and is expected to grow by

60% in next 18 months. The company is using some information systems that help them in

deadline with day to day business needs. Traditional as well as latest methods has been
PROJECT PLAN INCEPTION 3

implemented and adopted in order for the data collection to be up to the mark with the

synchronized and differential development techniques, which is best done with the help of web

analytics. The company needs to upgrade its IT infrastructure and physical infrastructure. The

company is looking forward for an information system that will handle increased business needs

of the organization (Loftus, 2012).

Details of business
The whole business process of the company revolves around the collection and

development t of data, and the process is very intricate in nature, which has a minimal margin of

errors and the processing of data can only be done in a proper and fool proof manner, if the

integrated units of the system are working in a perfect sync and each and every element is giving

out the best in efficiency.

The company develops web analytics which is a tricky situation as far as the

developmental techniques and implementation of all such techniques is concerned. Web

analytics take into account several trends and curves as well as findings of the website

development business, and the whole set of this data is very important for the very existence of

such a business and it should be provided at each end of the elemental node. Information flow is

carried out by using a perfect systematic adjustment between machines and personnel (Loftus,

2012).

Acknowledged and moreover latest frameworks must be executed and gained set up for

the data get-together to be reliant upon the engraving with the synchronized and differential

headway systems, which is best done with the support of web examination. Data sorting out and

data progression is a system which is fast expecting control over whatever feasible industry, out

and significant and orderly the restriction is stretching because of the passageway and vicinity of
PROJECT PLAN INCEPTION 4

a couple of contenders and the exact vicinity of the developmental fundamentals, which are

broad in nature, and all the new competitors are speedy setting aside a few minutes with the

latest examples.

Outsourcing and off shoring activities


The company as is a data collection and analytics company have lot of outsource and

offshore in order to have skilled pool of resources and save cost. The company is currently

outsourcing all legal activities to an outside law firm which handles the entire contract that they

have to maintain with their clients. This also includes description of regulations for maintaining

data privacy of the clients and information collected over web.

Other than this, the development work is offshore as nowadays, it is a very well-known

fact that the majority of personnel who are coming up and excelling in the field of Information

Technology are from Asian countries, such as China, India, Pakistan Bangladesh, Philippines

and Indonesia, who have a great amount of competition in the market by offering IT related

services at the bare minimum costs, which has benefitted IT and related businesses all over the

world and this trend has propelled outburst in the global outsourcing scenario, wherein big

western corporations are now looking east for gaining benefits of the low cost services and the

same trend is followed by the above mentioned organization. The company is going on same

footsteps and have all its information systems developed from companies that belong to these

countries. The company looks ahead to offshore further IT work.

Personnel & system status


The company possesses strong personnel who are dedicated for providing and handling

services and issues related to information system in the company. The company personnel list is

provided below
PROJECT PLAN INCEPTION 5

CIO (Chief Information Officer): CIO is responsible for formulating strategic goals of the

company and defines a plan for aligning the strategic goals with information technology in

the company.

DBA (Database administrator): The database administrator manage database employed in the

company. He is an experienced database developer in MySQL and core responsibilities

include Database development, management, maintaining security, monitoring, and

optimization are responsibilities of DBA.

Project Manager: The project manager is responsible for managing the IT projects. HE is the

person who heads all in-house projects and deals with projects heads of the companies to

whom the projects are outsourced.

HRM (Human resources manager): HRM is responsible for maintaining the human resource

of the company as well as Information technology.

Chief finance officer: Chief finance officer is responsible for all budgeting and financial

planning for IT projects.

Software Engineers: The Company employs five software engineers for handling in-house

development activities.

Data collected by company


Data is a critical capacity for any association and it must be managed painstakingly and

arranged in the power conventions, which besides, ought to be as per the most recent expenses

and regulations that are laid by the powers and settled sets of principles and managing data.

(Shokrey, 2011). The previously stated association additionally manages the data rudiments and

the dealings of different expenses of organized data and gathers records for further improvement.
PROJECT PLAN INCEPTION 6

The organization has been doing business of gathering information which is in a manner

extremely handy for the further advancement of the operational framework information and

securities.

Specifically, data is collected for their client that further helps them in making various

decisions based upon analysis. For the purpose, company is collecting following type of

information by using web analytics and other tools (Shokrey, 2011).

Visitors information: The visitors coming on any website are tracked with the information

about their IP addresses, visiting time and other details

Number of hits: Some of clients needs to track the hits they received from their clients are

also observed.

Tracking repeat visitors: Tracking repeat visitors by storing the details on how many times a

visitor visits etc.

Customer feedback: Customer feedback is also taken as a part of the company of client that

will help them in improving their services.

Customer behavior: There are number of clients who are interested in knowing behaviors of

the customer for setting target markets, product niche etc.

Details about web pages: Details about page including page response time, frequency, site

overlay etc. are some other types.

Details of information system


The company is currently using web analytics tools and some information system to process

data collected through web analytics tools. The company is using different web analytics tools
PROJECT PLAN INCEPTION 7

and data processing information system for storing, processing, retrieving and analyzing

information. The information systems used by the company are listed below (Farney, 2013):

Decision support system: The system helps the management to take decisions based upon the

input provided from various web analytics tools. The system works on MySQL database and

is developed in PHP. The system is based on graphical user interface where users are

provided with drag and drop facility to facilitate ease of operation. The company uses proper

authentication mechanism for ensuring security. Client server architecture is used where are

clients are authenticated and can only access the information by login to system.

Management information system: The system helps the company in managing the different

resources and information in a right and balanced way. Same configuration as that for DSS is

used for MIS.

Security maintenance

Security is maintained though proper authentication mechanism. All authenticated users

are given login ID and passwords through which they can access companys database. The

company also employs biometrics for authenticating server area. Physical security has also been

employs at main gates.

Following configuration is used for both the systems:

Hardware requirements

Memory requirements are RAM, a minimum of 64 MB

A minimum of PIII Supported Motherboard + 568 MHZ Pentium Processor is required.

Hard Disk, a minimum of 40 GB SATA.


PROJECT PLAN INCEPTION 8

Any Normal keyboard and mouse.

A 1024*768, true type color- 32 Bit Display is required.

Software requirements:
Windows XP Professional or updated versions are required as operating system.

PHP editor (notepad ++) for frontend.

Installation requirements
Xampp 1.6 software, which is included server info given below -
+ Apache 2.2.3

+ Zend Optimizer 3.0.2

+ SQLite 2.8.15

+ phpMyAdmin 2.9.1.1

+ MySQL 5.0.27

+ Open SSL 0.9.8d

+ FileZilla FTP Server 0.9.20


PROJECT PLAN INCEPTION 9

References
Shokrey, N. (2011). ANALYZING THE IMPACT OF VISITORS ON PAGE VIEWS WITH
GOOGLE ANALYTICS. International Journal of Web & Semantic Technology, 2(1),
14-32. Retrieved from http://arxiv.org/ftp/arxiv/papers/1102/1102.0735.pdf
Farney, T. (2013). Web Analytics Strategies for Information Professionals: A LITA Guide.
Journal of Library Innovation, 4(2), 149-150.
Loftus, W. (2012). Demonstrating Success: Web Analytics and Continuous Improvement.
Journal of Web Librarianship, 6(1), 45-55. Retrieved from
http://www.tandfonline.com/doi/abs/10.1080/19322909.2012.651416#.U1FlrlWSy8Y
Elias, (2011). Learning Analytics: The Definitions, the Processes, and the Potential. Retrieved
from http://learninganalytics.net/LearningAnalyticsDefinitionsProcessesPotential.pdf

You might also like