Excavation in all types of soils for all types & size of foundation and
drains including disposal of excavated stuff up to 50 m lead & a lift
2 up to 1.5 m including dressing and levelling of pits and disposed stuff
as directed by Engineer .
SAND FILLING
Filling from available excavated stuff (Excluding rock) in trenches,
plinth, sides of foundation etc. in layers not exceeding 20cm in depth
consolidating each deposited layer by ramming and watering with a
2b 1 2 4 5 40
lead upto 50 M. and lift upto 1.5 M. [30% OF EXCAVATED QTY. ]
Providing and filling in plinth with sand/ Crusher dust and hard
moorum under floor in layers not exceeding 20cm in depth
3 consolidating each deposited layer by ramming and watering, 1 2 3 4 24
including dressing etc. complete.
Supplying and Filling in plinth with locasand and under floors
including watering, ramming consolidating and dressing complete.
TERMITE TREATMENT
Diluting chemical emulsion (Chlorpyriphos/ lindane) in water asper
manufacturers recommendation and injecting for preconstructional
curative cum preventive anti- ermitetreatment:(Five year service
4 guarantee bond to be signed bycontractor)
Surface treatment by spreading emulsion under floor, over the plinth
area before laying base concrete @ 5 litres / sqm.
3,240.00
1,248.00
1,044.00
4,646.00
cum 45.00 1,080.00