Create Single Cycle Maintenance Plan - IP41: Create Measuring Point - Liati

The document outlines a maintenance process that includes creating a measuring point, maintenance document, and single cycle maintenance plan. It then schedules the maintenance plan, gets production approval, and automatically creates a notification and order. The order is released, and if needed another order is created from the notification. The notification is put in process, operations are confirmed, and the notification is completed once technical work is finished.

Uploaded by

masumidb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

Create Single Cycle Maintenance Plan - IP41: Create Measuring Point - Liati

The document outlines a maintenance process that includes creating a measuring point, maintenance document, and single cycle maintenance plan. It then schedules the maintenance plan, gets production approval, and automatically creates a notification and order. The order is released, and if needed another order is created from the notification. The notification is put in process, operations are confirmed, and the notification is completed once technical work is finished.

Uploaded by

masumidb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Create Measuring

Point - liati

Create Measuring Create Single Cycle


Document- IK11 Maintenance Plan - IP41

Schedule Maintenance Plan IP10 Production Approval

Automatically Notification
Automatically Created IW28
Order
Created - IW38

Release the maintenance If required. Create Put in process the


order IW38 Order from Notification IW28
Notification IW28
-

Confirm Operations - IW38 Complete


Notification - IW28

Technical Completion - IV/38