0% found this document useful (0 votes)
135 views7 pages

Em-Hse-F028 Rev.0 Monthly Inspection of Full Body Harness and Lanyard

1. This document is a monthly inspection form for a full body harness and lanyard used for electro mechanics projects. 2. It lists information to record such as the harness ID mark, lanyard ID mark, capacity, condition of webbing, snaphooks, buckles, sewing, ropes, shock absorber, and dates. 3. The form also includes inspection criteria numbered 1-27 to check

Uploaded by

sitaram75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views7 pages

Em-Hse-F028 Rev.0 Monthly Inspection of Full Body Harness and Lanyard

1. This document is a monthly inspection form for a full body harness and lanyard used for electro mechanics projects. 2. It lists information to record such as the harness ID mark, lanyard ID mark, capacity, condition of webbing, snaphooks, buckles, sewing, ropes, shock absorber, and dates. 3. The form also includes inspection criteria numbered 1-27 to check

Uploaded by

sitaram75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

ELECTRO MECHANICS

MONTHLY INSPECTION OF FULL BODY HARNESS & LANYARD


PROJECT No. : PROJECT NAME: Indicate eith
P
LOCATION: X
NA

Shock Date of
S. No. Harness ID Mark Lanyard ID Mark Capacity (kg/lbs) Webbing Snaphook Buckles Sewing Ropes
Absorber Inspection
EM-HSE-F028,Rev.0
D
ate either:
= Satisfactory
= Defective
= Not applicable

Last Inspection Inspected by Remarks


1. EXPOSED
UNPROTECTED
WIRES /

Sr. No.
CONDUCTORS
2.WIRING FOR WEAR
/ DAMAGE

Mark
ID
3.CONDITION OF
TERMINALS/FUSE

Mark
ID
Harness Lanyard
4. CHECK OUTPUT

(kg/lbs)
Capacity

5. EARTH STAKE
Webbing
6. TRIP LOAD OF
ELCB

k
Snaphoo
8. OPERATION OF
ELCB

Buckles
9. STARTER MOTOR

Sewing
10. ALTERNATOR

Ropes
11. CHECK SEAL TO
PLUG

Shock
Absorber
12.PLUG WEATHER
PROOFING

n
Date of
14. PROTECTION
AGAINST PHYSICAL

n
Last
DAMAGES

Inspectio Inspectio
15. ON/ OFF SWITCH

d by
Inspecte
17. BATERRY ACID
LEVEL
Remarks

18. BATTERY
TERMINALS
19. BATTERY
SECURED

20. SAFELY AWAY


FROM OTHER
EQPTS/ FACILITY

You might also like