33% found this document useful (3 votes)
606 views

HV Work Method Statement-2

This work method statement outlines the steps for servicing and repairing a transformer at a water facility. The key steps include: 1) Mobilizing personnel, materials, tools and equipment to the site. 2) Opening the low voltage and high voltage termination points using the correct tools and PPE. 3) Testing the transformer by measuring winding resistance, voltage ratios, and insulation resistance of the primary and secondary windings. 4) Conducting dielectric tests on oil samples from the transformer and storage drum. 5) Topping up the transformer oil using a one horsepower pump according to standard methods. Materials and equipment needed include simple hand tools, a digital multimeter, megger tester, hi-pot tester

Uploaded by

martins73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
33% found this document useful (3 votes)
606 views

HV Work Method Statement-2

This work method statement outlines the steps for servicing and repairing a transformer at a water facility. The key steps include: 1) Mobilizing personnel, materials, tools and equipment to the site. 2) Opening the low voltage and high voltage termination points using the correct tools and PPE. 3) Testing the transformer by measuring winding resistance, voltage ratios, and insulation resistance of the primary and secondary windings. 4) Conducting dielectric tests on oil samples from the transformer and storage drum. 5) Topping up the transformer oil using a one horsepower pump according to standard methods. Materials and equipment needed include simple hand tools, a digital multimeter, megger tester, hi-pot tester

Uploaded by

martins73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

WORK METHOD STATEMENT

Introduction:

Work method statement for Servicing / Repair of Transformer at Water facilities IA

Scope of work:

This method statement covers all Servicing and Repairs activities.

S/N TASK STEPS STEPS DESCRIPTION REMARK


1 Mobilization to site Mobilization of personnel, Materials, Tools
and Equipments to site
2 Open the LV and HV Use the correct tools to lose the termination Use complete PPEs
termination point bolt and Nuts. Follow working procedure like Coverall,
dotted hand
gloves, Rubber
Hand Gloves.
3 TESTING OF TRANSFORMER All test report shall
1. Winding Resistance - Ensure the contacts at bushings are be reported in the
test. cleans. following report
form number 34,
- Hold the sensing probes across the form number
conduct between which the contact 33,form number 9
resistance is to be measured (Test and form number 3
Current 10A DC).

- Observe the reading and record in the


test format.

2. Ratio Test. - Ensure that both the primary and


secondary windings are not connected
to any cables/Bus bar

- Ensure the tap changer in lowest top


position

- Apply three phase supply voltage


(415V AC) across the primary
termination of the transformer.

- Measure the secondary (LV) voltage at


the LV termination. Observe the
reading and record in the test format.

- If the tap changer is Off load type,


switch of the power supply and rise
one step and apply the Three phase
415V AC across the Secondary
termination and measure the voltage
at both secondary and primary side.

3. Insulation - Earth the primary winding and


Resistance For secondary winding.
Primary and
Secondary windings - Apply Voltage on the primary winding
and secondary winding.

- Observe readings and record in the


test format.
4. Di Electric Test Collected oil sample from Transformer and Report of the test
sample from drum to be tested with the Di- result shall be
Electric test machine. provided.
5. Topping of oil Using one horse power pump to pump in oil Adequate
into the transformer. Using DEP 63.10.08.11- supervision, Use of
Gen standard method. Rubber Hand
gloves,

Installation of transformer work method statement is not included

MATERIALS / EQUIPMENT

1. Simple Hand Tools


2. Digital Multimeter
3. Megger Tester
4. Hi Pot tester.
5. One horse power Pumps

Prepared by: ______________________ sign: _________________

SPDC Rep: ______________________ sign: _________________

You might also like