0% found this document useful (0 votes)
528 views

Software Engineering Lab - CSE342P Experiment List

This document outlines the course code, name, and experiments for a Software Engineering Lab course. The 12 listed experiments involve creating requirements documents, UML diagrams including use case, activity, class, sequence, and state diagrams, and implementing and testing a selected project. The document also lists potential student project options and additional value added experiments involving software testing tools, effort estimation, and risk analysis.

Uploaded by

Suresh Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
528 views

Software Engineering Lab - CSE342P Experiment List

This document outlines the course code, name, and experiments for a Software Engineering Lab course. The 12 listed experiments involve creating requirements documents, UML diagrams including use case, activity, class, sequence, and state diagrams, and implementing and testing a selected project. The document also lists potential student project options and additional value added experiments involving software testing tools, effort estimation, and risk analysis.

Uploaded by

Suresh Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

GALGOTIAS UNIVERSITY

Plot No.2, Sector 17-A, Yamuna Expressway,


Greater Noida, Gautam Buddh Nagar, U.P., India

School of Computing Science & Engineering

Course Name- Software Engineering Lab


Course Code-CSE342P
Sr.
No. Title of Lab Experiments
1. Identify the project and prepare the SRS document for the project

2. Getting familiarized with the Unified Modeling Language (UML) Environment.

3. Modeling Data Flow Diagrams (at level 0, level 1 & level 2) for the chosen project.

4 Modeling E-R diagram for the chosen project.

5 Working with the Use-case diagrams and capturing Use case scenarios.

6. Working with the Activity Diagrams for the chosen project.

7. Working with the Class Diagrams for the chosen project.

8. Working with the Sequence Diagrams for the chosen project.


9 Working with the State chart Diagrams for the chosen project.
10. Implementation of the selected Project.
11. Test cases design and program testing for the chosen project.

Projects (Students will chose only from the below


mentioned projects)

1. Student Result management System


2. Library management system
3. Automatic Teller Machine
4. Railway/Flight Reservation System
5. Hotel/Restaurant Management System
6. Blood Bank System
7. Online Banking System

Value Added List of


Experiments
Introduction to Any Software testing tool.

1. Integration testing of their System


2. Using COCOMO model, estimate effort for
their System
3. Analyze risk related to the project and
prepare RMMM plan

NAME & SIGNATURE OF COURSE COORDINATOR:


NAME & SIGNATURE OF LAB COORDINATOR: MS.KANIKA GUPTA

You might also like