Gantt Project Planner1

The Disaster Relief Aircraft Project outlines a plan and progress for various activities related to developing an aircraft for disaster relief. The plan duration, actual start date, percent complete, and actual duration beyond plan are provided for 26 activities. To date, activities range in completion from 1% to 100%, with some activities not yet started or exceeding their planned duration. The overall project aims to design, build, test, and analyze a aircraft to aid in disaster response efforts.

Uploaded by

api-365493728
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views1 page

Gantt Project Planner1

The Disaster Relief Aircraft Project outlines a plan and progress for various activities related to developing an aircraft for disaster relief. The plan duration, actual start date, percent complete, and actual duration beyond plan are provided for 26 activities. To date, activities range in completion from 1% to 100%, with some activities not yet started or exceeding their planned duration. The overall project aims to design, build, test, and analyze a aircraft to aid in disaster response efforts.

Uploaded by

api-365493728
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Disaster Relief Aircraft Project

Select a period to highlight at right. A legend describing the charting follows. Period Highlight: 1 Plan Duration Actual Start % Complete Actual (beyond plan) % Complete (beyond plan)

PLAN ACTUAL ACTUAL PERCENT


ACTIVITY PLAN START
DURATION START DURATION COMPLETE PERIODS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
Memo:
Definition 25%
1 1

Gantt Chart 100%


1 1
Purpose &
Design 35%
2 1

Wing Shape 10%


3 1

Wing Structure 85%


4 1

UML Models 85%


5 1
Automation
Code 50%
6 1

Final Design 60%


7 1

FAT Testing 75%


8 1

Final Analysis 100%


9 1

Final Report 60%


10 1

Activity 12 0%
9 3 9 3

Activity 13 50%
9 6 9 7

Activity 14 0%
9 3 9 1

Activity 15 1%
9 4 8 5

Activity 16 80%
10 5 10 3

Activity 17 0%
11 2 11 5

Activity 18 0%
12 6 12 7

Activity 19 0%
12 1 12 5

Activity 20 0%
14 5 14 6

Activity 21 44%
14 8 14 2

Activity 22 0%
14 7 14 3

Activity 23 12%
15 4 15 8

Activity 24 5%
15 5 15 3

Activity 25 0%
15 8 15 5

Activity 26 50%
16 28 16 30