CH 04
CH 04
Louderback
Multiple Choice
a 1. Activity-based costing
a. requires the identification of cost drivers.
b. is used only in JIT operations.
c. applies only to discretionary fixed costs.
d. does not help to identify activities as value-adding or non-
value-adding.
c 9. The segment for which you are estimating the cost is called the
a. activity driver
b. consumption ratio
c. cost object
d. sustaining activity
Chapter 4 Activity-Based Costing and Management 2
d 11. A tool that compares how tasks are performed internally with the
best practices of industry leaders is
a. process value analysis
b. re-engineering
c. caveat analysis
d. benchmarking
2
Chapter 4 Activity-Based Costing and Management 3
3
Chapter 4 Activity-Based Costing and Management 4
b 30. The cost to repair a unit of product that fails after it is sold
is a(n)
a. appraisal cost.
b. external failure cost.
c. internal failure cost.
d. prevention cost.
Model A Model B
Units produced 200 400
Material moves (total) 20 80
Direct labor hours per unit 1 2
Model A Model B
Units produced 200 400
Material moves (total) 20 80
Direct labor hours per unit 1 2
4
Chapter 4 Activity-Based Costing and Management 5
Model A Model B
Units produced 200 400
Material moves (total) 20 80
Direct labor hours per unit 1 3
5
Chapter 4 Activity-Based Costing and Management 6
6
Chapter 4 Activity-Based Costing and Management 7
7
Chapter 4 Activity-Based Costing and Management 8
a. $20.50
b. $74.00
c. $82.00
d. Some other number
Model 1 Model 2
Units produced 1,000 200
Material moves (total) 100 40
Testing time (total) 250 125
Direct labor hours per unit 1 5
8
Chapter 4 Activity-Based Costing and Management 9
Model 1 Model 2
Units produced 1,000 200
Material moves (total) 100 40
Testing time (total) 250 125
Direct labor hours per unit 1 5
Model 1 Model 2
Units produced 1,000 200
Material moves (total) 100 40
Testing time (total) 250 125
Direct labor hours per unit 1 5
Model 1 Model 2
Units produced 1,000 200
Material moves (total) 100 40
Testing time (total) 250 125
Direct labor hours per unit 1 5