6 Station: Ref - No.cHN/Poc - Rripping/c-4"00

The document summarizes a unit trip event that occurred at Chandrapur Super Thermal Power Station Unit 6. Key details include: 1) The 500 MW unit tripped manually due to a sudden trip of Unit Board-6A caused by a heavy jerk on the 400KV Bus-1, which was determined to be a system problem. 2) Observations noted the unit was running at 360 MW load when the trip occurred. 3) The root cause was identified as the heavy jerk on the 400KV Bus-1 that caused the under voltage trip of Unit Board-6A.

Uploaded by

SE EST
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views2 pages

6 Station: Ref - No.cHN/Poc - Rripping/c-4"00

The document summarizes a unit trip event that occurred at Chandrapur Super Thermal Power Station Unit 6. Key details include: 1) The 500 MW unit tripped manually due to a sudden trip of Unit Board-6A caused by a heavy jerk on the 400KV Bus-1, which was determined to be a system problem. 2) Observations noted the unit was running at 360 MW load when the trip occurred. 3) The root cause was identified as the heavy jerk on the 400KV Bus-1 that caused the under voltage trip of Unit Board-6A.

Uploaded by

SE EST
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

,/

Ref.No.cHN/Poc.rripping/c-4"00 05 8U Date: .l 7 FEB ?fII5'


EVENT ANALYSIS REPORT
UNIT NO : 6 ITPS: Chandrapur Super Thermal Power Station Unit Capacity: 500 MW
1. *HO Code: Station Code: CSTPS U6 Time- Date- No. of days from last
T07 2014-15 18:25 Hrs 01/0 LlzDLs sync.:- 70.5

Last Overhaul (AOH) synchronisation Date 2310812012 861 .5 Days 2.36 Years
2. Operating conditions at the time of Event a-
r

Load MW Coal Cycles in seryice Oil Suppoft


360 A,B,D,E,H NiI
3. Nature of Event :
Unit tripped manually due to sudden tripping of Unit Board-6A on under voltage because of heavy jerk on 400KV
Bus-I (System Problem)

4. Name of First Up, Main Protections & protection on which GCB tripped:
Boiler hand tripped, Turbine tripped on interlock, Generator tripped on reverse power protection,

5 A) Obseruations :-
Unit was running at 360 MW load with coal mill A,B,D,F,H. CEP- A & B, in service. At 18:23 Hrs Heavy jerk noticed
causing tripping of Unit board-6A on under voltage. Due to this auxilliaries on Unit board-6A such as FD-6A, BCW-
6A, CEP-6A & 68, Coal Mill 6A & 6E tripped. Due to this load variation observed and unit withdrawn by Boiler manual
tripping.

5 B) Remedial Action/work done :-


On Inspection Unit board-6A found charged and voltages were normal. SE-13 board through which Unit Board-6A &
6D was charged checked and found normal. SAT-4A & 48 transformers and all station boards found checked found
charged and voltages found normal,
t
6. Root Cause Analysis :-
Heavy jerk on 400 KV Bus:I causes tripping of Unit board-6A on under voltage.

7. Preventive action suggested (Shoft Term) :- Nil

8. Preventive action suggested (Long Term) :- Nil

9. Similar event occurred last time:


u# ---- Time r rrrr Date:
Nil

9A. Implementation Status of Long Term/Shoft Term measures stated at Sr No 9:- r


Shoft Term:
Long Term:

10. Boiler lighted up Time - 20:37 Hrs Date- 0U0L|20L5


11. T-A Set Synchronised Time - 00:06 Hrs Date- 0210L120L5
L2. Remark :- Nil

I
i
i

chiert ineer (O&M)


CSTP /Chandrapur.

13. Recomendations of Works Section:


1. Procurement/Replacement plan:
2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:

6. whether remedial action is completed satisfactory & point is ctosed :