44C PDF
44C PDF
MODULE- 44C
Permeability & Seepage
Ans:
= x.
Ans:
= ( )
= 4.86 mm/s
= 4.86 cm/s
JH ACADEMY 1
Sub: Geotechnical Engineering
Topic : Permeablity
Ans:
.i 12
=3
R= = 12.37 kN
4. The figure below shows two flow lines for seepage across an
interface between two soil media of different co-efficient of
permeability. If entrance angle a1=30 , the exit angle a2 will be
Ans:
=
= 66.
2
5. In a constant head permeameter with cross section area of 10 cm ,
when the flow was taking place under a hydraulic gradient of 0.5,
the amount of water collected in 60 seconds is 600 cc. The
permeability of the soil is
(a) 0.002 cm/s (b) 0.02 cm/s
(c) 0.2 cm/s (d) 2.0 cm/s
Ans:
a = k .A
= k.0.5 10 k = 2cm/s
JH ACADEMY 2
Sub: Geotechnical Engineering
Topic : Permeablity
The total head, elevation head and pressure head in metres of water
at the point R shown in the figure are
(a) 0.8, 0.4, 0.4 (b) 1.2, 0.4, 0.8
(c) 0.4, 0, 0.4 (d) 1.6, 0.4, 1.2
Ans:
Hydraulic gradient i=
Elevation head at R=0
Total head = 1.2 (1.0) = 0.4
Presume head = 0.4 0 = 0.4
What are discharge velocity and seepage velocity through the soil
sample?
(A) k, 2k (B) 2/3k, 4/3k
(C) 2k, k (D) 4/3k, 2/3k
Ans:
Discharge velocity = ki = k. = k
Seepage velocity = = = 2k
Ans:
t=
JH ACADEMY 3
Sub: Geotechnical Engineering
Topic : Permeablity
Ans:
K=
k
( )
( )
10. The flow net around a sheet pile wall is shown in the sketch. The
properties of the soil are: permeability coefficient = 0.09 m/day
(isotropic), specific gravity = 2.70 and void ratio = 0.85. The sheet
pile wall and the bottom of the soil are impermeable.
The seepage loss (in m3 per day per unit length of the wall) of
water is
(A) 0.33 (B) 0.38 (C) 0.43 (D) 0.54
Ans
Q = Kh =0.09
JH ACADEMY 4
Sub: Geotechnical Engineering
Topic : Permeablity
11. The flow net around a sheet pile wall is shown in the sketch. The
properties of the soil are: permeability coefficient = 0.09 m/day
(isotropic), specific gravity = 2.70 and void ratio = 0.85. The sheet
pile wall and the bottom of the soil are impermeable.
Ans:
( ) ( )
F=
( )
12. The ratio Nf/Nd is known as shape factor, where Nf is the number
of flow lines and Nd is the number of equipotential drops. Flow net
is always drawn with a constant b/a ratio, where b and a are
distances between two consecutive flow lines and equipotential
lines, respectively. Assuming that b/a ratio remains the same, the
shape factor of a flow net will change if the
(A) upstream and downstream heads are interchanged
(B) soil in the flow space is changed
(C) dimensions of the flow space are changed
(D) head difference causing the flow is changed
Ans: (c)
JH ACADEMY 5
Sub: Geotechnical Engineering
Topic : Permeablity
13. The soil profile below a lake with water level at elevation = 0 m
and lake bottom at elevation = -10 m is shown in the figure, where
k is the permeability coefficient. A piezometer (stand pipe)
installed in the sand layer shows a reading of +10 m elevation.
Assume that the piezometric head is uniform in the sand layer. The
quantity of water (in ) flowing into the lake from the sand
layer through the silt layer per unit area of the lake bed is:
E = 0.5
seepage velocity =
JH ACADEMY 6
Sub: Geotechnical Engineering
Topic : Permeablity
Ans: (c)
= 0.04
c) 63.0% d) 77.8%
Ans:
=1.2857
=0.2857 ie 28.6%
JH ACADEMY 7
Sub: Geotechnical Engineering
Topic : Permeablity
19. Match List I (Flow type) with List II (flow characteristics) and
select the correct answer using the codes given below the lists:
List-I
A. Transient flow
B. Turbulent flow
C. Steady-state flow
D. Laminar flow
List-II
A. Seepage flow is a function of time
B. Hydraulic gradient varies with square of velocity
C. Flow at low velocity
D. Governing equation in 2-D is =0
Codes:
A B C D
a) 1 2 4 3
b) 3 2 1 4
c) 1 2 3 4
d) 2 1 4 3
Ans: ( A )
q= h
=10
JH ACADEMY 8
Sub: Geotechnical Engineering
Topic : Permeablity
Ans: (A)
q= =12
= 12
=12
25. In a two-layer soil system, the top soil and bottom soil are of same
thickness but the coefficient of permeability of the top soil is twice
that of the bottom soil of coefficient of permeability k. when
horizontal flow occurs, the equivalent coefficient of permeability of
the system will be
a) 2k b)1.5k
c) 1.25k d) 1.2k
Ans:
= 1.5 k
JH ACADEMY 9
Sub: Geotechnical Engineering
Topic : Permeablity
26. A flow net of a coffer dam foundation has 6 flow channels and 18
equipotenital drops. The head of water lost during seepage is 6m. if
the coefficient of permeability of foundation is 4 m/min, then
the seepage loss per metre length of dam will be
a) 2.16 /day
b) 6.48 /day
c) 11.52 /day
d) 34.56 /day
Ans:
q=4
=11.52
27. The following data were obtained when a sample of medium sand
was tested in a constant head parameter :
Cross-section area of sample: 100
Hydraulic gradient : 10
Discharge collected : 10cc/s
The coefficient of permeability of the sand is
a) 0.1 m/s b) 0.01m/s
c) 1 m/s d) 1 m/s
Ans:
10 = k
k=0.01
JH ACADEMY 10
Sub: Geotechnical Engineering
Topic : Permeablity
31. In a falling head permeability test on a soil, the time taken for at
the head to fall from to is t. the test is repeated with same
initial head , the final head is noted in time . Which one of
the following equations gives the relation between , and ?
a) = b) =
c) = d)
Ans: (c)
32. A soil deposit has three layers having same thickness each but
the permeabilities
of the layers are in ratio of 1:2:4 from top to bottom. What is
the ratio of average permeability in the horizontal direction to
that in the vertical direction?
a) 7:2 b) 14:6
c) 28:24 d) 49:36
JH ACADEMY 11
Sub: Geotechnical Engineering
Topic : Permeablity
Ans:
33. A soil mass under seepage has a downward flow of water. Which
of the following statements are correct with regard to stresses at
any point in the soil mass?
1. Effective stress is decreased by an amount equal to the seepage
force
2. Effective stress is increased by an amount equal to the
seepage force
3. Total stress will change
4. Total stress will be unaltered
Select the correct answer using the codes given below:
a) 1 and 3 b) 2 and 3
c) 1 and 4 d) 2 and 4
Ans: (d)
JH ACADEMY 12
Sub: Geotechnical Engineering
Topic : Permeablity
36. A homogeneous earth dam is 43m high with 3m as free board and
a 30m long horizontal filter at the downstream end.
a) 0.0004 /s b) 0.0036 /s
c) 0.0039 /s d) 20 /s
Ans:
Q=3
= 15
( )
Ans: (A)
JH ACADEMY 13
Sub: Geotechnical Engineering
Topic : Permeablity
Ans: (b)
41. Assertion (A): Flow net is dependent on permeability of soil
through which flow is taking place.
Reason(R): The flow net is useful in finding the discharge.
Codes:
a) Both A and R are true and R is the correct explanation of A
b) Both A and R are true but R is not a correct explanation of A
c) A is true but R is false
d) A is false but R is true
Ans: ( d )
42. A flow net for seepage under a sheet pile wall has =4, = 8
and the permeabilities of soil in the horizontal and vertical
directions are : = 8 m/sec and = 2 m/ sec. if the
head loss through the soil is 2m, the quantity of seepage per meter
length of the wall will be
a) 2 /sec
b) 4 /sec
c) 8 /sec
d) 16 /sec
Ans:
Q= =4
Ans:
I=
V = ki=30
Time = = = 750days
44. If number of flow channels are 10, number of drops are 6, the total
hydraulic head difference is 4m, the length of dam is 50m and the
coefficient of permeability is 2 , the total loss of water
per day in is
a) 576 b) 5760 c) 57600 d) 576000
JH ACADEMY 14
Sub: Geotechnical Engineering
Topic : Permeablity
Ans:
Q=2
=0.6667
45. A flow line makes angles and with the normal to the
interface of the soils having permeabilities 3 and
1 before and after deflection. According to the law of
deflection of flow lines at the interface of the dissimilar soils, the
is
a) b) c) d)
Ans:
47. According to Darcys law for flow through porous media, the
velocity is proportional to
a) Effective stress
b) Hydraulic gradient
c) Cohesion
d) Stability number
Ans: (b)
48. A homogeneous anisotropic earth dam which is 20m high
constructed on an impermeable foundation. m/s
and m/s. the water level on reservoir side is at
18m from the base of the dam. Downstream side is dry. It is seen
that there are 4 flow channels and 18 equi potential drop in a square
flow net drawn in the transformed dam section. Estimate the
quantity of seepage per unit length.
Ans:
Q=
JH ACADEMY 15
Sub: Geotechnical Engineering
Topic : Permeablity
by substituting
a)
b)
c)
d)
Ans (d)
(A) (B)
(C) ( ) (D) ( )
Ans: (d)
JH ACADEMY 16