0% found this document useful (0 votes)
114 views1 page

42 - Pe-P-Roa07114227006-Me-Dwg-003-01-E - Plan Legaturi

This document is a piping arrangement drawing that shows the layout of piping and equipment at Compressor Station No. 2. It depicts the steel structure pump house, cooling water pumps, compressor package, electrical building, and other key components. Piping is shown connecting the various units to transfer gas, water, and electricity through the station.

Uploaded by

Ioana Popescu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
114 views1 page

42 - Pe-P-Roa07114227006-Me-Dwg-003-01-E - Plan Legaturi

This document is a piping arrangement drawing that shows the layout of piping and equipment at Compressor Station No. 2. It depicts the steel structure pump house, cooling water pumps, compressor package, electrical building, and other key components. Piping is shown connecting the various units to transfer gas, water, and electricity through the station.

Uploaded by

Ioana Popescu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

P.T.

COMPRESSORS STATION NO. 2 SCAIENI GMS

R C

Cooling water

20-V-001
20-V-002
20-P-001A/B
Steel structure pump house

20-E-003
43-FL-001
R
Atlas Transport
43-P-001A/B Compressor
Package
23-X-001 23-K-001

LCR

ELECTRICAL

01 17.05.12 ISSUE FOR REVIEW M. ENE M. NANU

PETROM S.A. DRAWING NO.


Memer of OMV Group
ROMANIA
Member of OMV Group
CONFIND
PLANT:
BOLDESTI LTS PILOT F
BOLDESTI-COMP
7A10-16K-LTSB LTS xx
SCALE: DRAWING TITLE SHEET

1:250 PIPING ARRANGEMENT DRAWING

You might also like