0% found this document useful (0 votes)
73 views2 pages

Green Line Underground: Section 27: External Works 09: Miscellaneous Other External Works

This 3 sentence summary provides an overview of the key information from the document: The document outlines miscellaneous other external works and notes that this part provides for inclusion of special specifications for any external building works or elements designated in the project documentation. It states that all items in this part require approval by the engineer and that the contractor must submit manufacturer's literature, drawings, samples or mock-up units for these items for approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views2 pages

Green Line Underground: Section 27: External Works 09: Miscellaneous Other External Works

This 3 sentence summary provides an overview of the key information from the document: The document outlines miscellaneous other external works and notes that this part provides for inclusion of special specifications for any external building works or elements designated in the project documentation. It states that all items in this part require approval by the engineer and that the contractor must submit manufacturer's literature, drawings, samples or mock-up units for these items for approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

QCS 2014 Section 27: External Works Page 1

Part 09: Miscellaneous Other External Works

9 MISCELLANEOUS OTHER EXTERNAL WORKS .................................................... 2

9.1 GENERAL ................................................................................................................. 2


9.1.1 Scope 2
9.1.2 General Requirements 2

D
N
U
O
R
G
ER
D
N
U
E
N
LI
N
EE
R
G
QCS 2014 Section 27: External Works Page 2
Part 09: Miscellaneous Other External Works

9 MISCELLANEOUS OTHER EXTERNAL WORKS


9.1 GENERAL

9.1.1 Scope

1 This Part provides for inclusion of special specifications for any external building works or
elements designated in the Project Documentation.

9.1.2 General Requirements

1 All items in this Part require approval by the Engineer.

D
2 The Contractor shall submit manufacturers literature, drawings, samples or mock-up units

N
for items covered in this Part for approval by the Engineer.

U
3 If external work items related to this Part are not specified or otherwise detailed within the

O
Project Documentation, the Contractor shall submit appropriate specifications for approval
by the Engineer.

R
G
END OF PART
ER
D
N
U
E
N
LI
N
EE
R
G

You might also like