This document provides a summary of RFIs (requests for information) from May 1-11, 2017 and for the months of April and March. It shows the number of RFIs submitted, addressed, approved, and rejected for various construction items under highway and structure work. For the period of May 1-11, the percentage of RFIs checked ranged from 0-75% for highway items and was not available for structure items as no RFIs were considered from the lab during this period.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
877 views
Rfi Report - For Ic
This document provides a summary of RFIs (requests for information) from May 1-11, 2017 and for the months of April and March. It shows the number of RFIs submitted, addressed, approved, and rejected for various construction items under highway and structure work. For the period of May 1-11, the percentage of RFIs checked ranged from 0-75% for highway items and was not available for structure items as no RFIs were considered from the lab during this period.