Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
120 views
6 pages
Gasco Regulation
r4eg
Uploaded by
Mostafa Nabil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Gasco Regulation For Later
Download
Save
Save Gasco Regulation For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
120 views
6 pages
Gasco Regulation
r4eg
Uploaded by
Mostafa Nabil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Gasco Regulation For Later
Carousel Previous
Carousel Next
Download
Save
Save Gasco Regulation For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 6
Search
Fullscreen
EGYPTIAN NATURAL GAS COMPANY GASCO SECTION 1-DESIGN-NO_P7 LR 1.6 C&S PIPELINES CROSSINGSEGYPTIAN NATURAL GAS COMPANY GASCO C&S vocatrecuiation L.R. 1. SUBJECT PIPELINE CROSSINGS To define the standard to be used for pipeline crossings on the National Gas i Grid. ENGINEERING & DEVELOPMENT GEN, DIV.16.1 1.6.2 Road Al pipeline crossings will be unsleeved unless otherwise specified by the company. Impact protection measures such as cast in-situ or pre-cast concrete slabs shall be provided coupled with the placement. of a warning tape placed above and below such impact protection ‘The concrete slabs should be laid above the pipeline by a distance of SOcm, and laid in contact with each other to be as one unit in distributing the load, Backfiling, ‘must take place immediately after the pipe has been laid, and the trench clear of any ‘rocks, stones or siniar and the trench padded with a minimum of 20cm of sieved Above and around the pipe a:minimum of 20em sieved sand backfill, compacted around the pipe to provide protection from the remainder of the backfill. The backfill thoroughly compacted by wet tamping in 1Sem layers. Wall thickness. of the pipeline crossing on shall be 0.5in or using a design factor of 0.4 which ever is the greater, Rail All railway crossings shall include for externally coated H.S carbon steel sleeve in accordance with Egyptian Regulation, The cartier pipe shall include for a wall thickness of O Sins or using a design factor of 0.4 which ever is greater. Sleeve length to terminate at not less than 3 metres outside the rail boundary and with a diameter difference to the carrier pipe ofnot less than 10cm. For longer crossings the diameter difference may be extended to 15 - 20cm to avoid construction difficulties. Steel, sleeves shall have an electric resistance between pipe and sleeve of more than 100chm before being tied in. If a lower resistance is measured the carrier pipe shall be removed from the sleeve the insulation repaired and carrier pipe re- installed. With the prior installation of sleeve end seals it is ecommended that the annulus shall be filled between the support insulation spacers by a suitable material such as Bentonite cementitious fill which will provide a non-corrosive environment in the annulus and able to withstand extemal loadings, In practice great care will be necessary to ensure complete fling of the annulus by the cementitious fil. ‘The fill should not be relied upon to protect the carrier pipe from corrosion. However, corrosion can be controlled to a degree, provided an effective combination of the following is adhered to Cathodic Protection ‘Annular Fill Cartier pipe coating When any cementitious fil is used, it shall be free of all nitrates and calcium chloride. Page 21.6.3 Sleeved In the interest of effective Cathodic Protection to the pipeline the use of steel casings, should be avoided. Where casings have to be used the following options are available: a) Externally coated HS. (High Strength) Steel b) ‘Uncoated steel sleeves °) ‘Concrete (Reinforced) 4) High density Polyethylene ©) _-P.V.C Poly vinyl chloride) Design of casing shall ensure :~ a) by °° °) It is capable of withstanding external loads. Cartier pipe is easily installed, using suitable insulation spacers, such as fabricated galvanised steel 'P.V.C. coated with riser sections for ceentralising, Supports to be included at regular intervals and provision is rade especially atthe ends of ste! sleeves to avoid risk of contact between carrier and sleeve pipe. Support rings are spaced and based on the carrer pipe being filled with water, Possible additional forces caused by construction settlements at. the extremities which mark. a transition between two methods of installation. This. should be minimised by ensuring tha the cartier pipe shall have a firm bearing on the trench bottom for a distance of 8 metres from sleeve ends either by compaction ofthe trench bottom or alternatively the placement of sand filled bags under the pipe at | metre intervals. With the prior installation of sleeve end seals the annulus may be filled with ‘material for example Bentonite cement or other readily pumpable cementitious fill to give a non-corrosive environment coupled with the strength to withstand ‘extemal loadings imposed on the sleeve. Whichever material is used, itis essential to ensure that the grout should not have any significant change in volume when set. “The annulus is to be sealed as effectively as possible, or the casing filed with suitable material to minimise water circulation and therefore reduce oxygen supply to the minimum, Page 31.6.4 1.6.40 1.6.4 Above Ground Above ground pipeline crossings shall nt be used in situations where alternative ‘methods are possible. Self Supporting For self supporting crossings the design of the pipeline shall be spaced so as to prevent excessive deflection bending and shear stresses in the piping at the greatest load e.g, Hydraulic Test with special consideration given to pipeline sections where flange valves impose concentrated loads. Calculations shall be made to ensure that the sum of the longitudinal stresses due to ‘weight, pressure and sustained external loading does not exceed the maximum allowable stress. ‘Non-Self Supporting Where pipelines are required to cross obstacles such as e.g. Canals where the designed self support cannot be achieved, consideration shall be given to the use of pipe piles. In the case where pipe piles are not permitted an acceptable bridge arrangement will be used. ‘The design shall ensure thatthe stresses, mainly thermal and partially dynamic, on the structure are in harmony, and that the resulting pipeline stresses are minimised by ensuring maximum flexilty in the pipeline layout both in the approach and on the pipe piles or bridge. The pipe piles or bridge shall be designed to accommodate both the calculated weight of the pipeline and thermal movement together with its own structure arrangement, Page 4IMPACT PROTECTION ROAD 1-200 mm REINFORCED CONCRETE SLAP, CONCRETE TO BE GRADE c40 TO 85 8110,20mm AGGREGATE AND NOMINAL 50 mm SLUMP. REINFORCED WITH ONE LAYER OF A252 MESH FABRIC POSITIONED CENTRALLY IN SLAB.
You might also like
API 570 Inspection Checklist PDF
PDF
67% (3)
API 570 Inspection Checklist PDF
2 pages
ASNT Level II Study Guide Visual PDF
PDF
100% (3)
ASNT Level II Study Guide Visual PDF
66 pages
Lakasa Sand Interceptor
PDF
No ratings yet
Lakasa Sand Interceptor
1 page
Questions STP
PDF
No ratings yet
Questions STP
22 pages
GAPS Guidelines: Ventilation of Fire Pump Rooms
PDF
No ratings yet
GAPS Guidelines: Ventilation of Fire Pump Rooms
3 pages
Koolfog Misting Design
PDF
No ratings yet
Koolfog Misting Design
4 pages
Misting System
PDF
No ratings yet
Misting System
16 pages
Ed Q 01.00 I 02
PDF
No ratings yet
Ed Q 01.00 I 02
22 pages
Utility Services in Road Sections
PDF
No ratings yet
Utility Services in Road Sections
7 pages
Cyclone Collection Efficiency Comparison of Experimental Results With Theoretical Predictions
PDF
No ratings yet
Cyclone Collection Efficiency Comparison of Experimental Results With Theoretical Predictions
16 pages
Mifab Interceptor PDF
PDF
No ratings yet
Mifab Interceptor PDF
8 pages
SAT Schedule From SAFID 16-11-2016
PDF
No ratings yet
SAT Schedule From SAFID 16-11-2016
1 page
Mech STD Details Index
PDF
No ratings yet
Mech STD Details Index
3 pages
6 - Imeter - Turbine New
PDF
100% (1)
6 - Imeter - Turbine New
104 pages
Foam System Design
PDF
No ratings yet
Foam System Design
1 page
Ansi/I - 75.08.07-: Face-to-Face Dimensions For Separable Flanged Globe-Style Control Valves (Classes 150, 300, and 600)
PDF
No ratings yet
Ansi/I - 75.08.07-: Face-to-Face Dimensions For Separable Flanged Globe-Style Control Valves (Classes 150, 300, and 600)
12 pages
Pipe Sizing IPC V0.1
PDF
No ratings yet
Pipe Sizing IPC V0.1
22 pages
Product Guide PPR-Green-Pilsa
PDF
No ratings yet
Product Guide PPR-Green-Pilsa
20 pages
Chapter 4 Design Criteria Sewer
PDF
No ratings yet
Chapter 4 Design Criteria Sewer
9 pages
KM Flushing and Sterilization Guide
PDF
No ratings yet
KM Flushing and Sterilization Guide
8 pages
Xerxes Above Ground Tanks Brochure
PDF
No ratings yet
Xerxes Above Ground Tanks Brochure
16 pages
Becker T-Ball Control Valve: For Natural Gas Applications
PDF
100% (1)
Becker T-Ball Control Valve: For Natural Gas Applications
16 pages
GPS PE Pipe Systems Dimensions
PDF
No ratings yet
GPS PE Pipe Systems Dimensions
92 pages
Design of Underground Pipe Line System
PDF
No ratings yet
Design of Underground Pipe Line System
42 pages
RediFlex Hoses Data Sheet
PDF
No ratings yet
RediFlex Hoses Data Sheet
2 pages
Sewer Piping Systems Installation Guide PDF
PDF
No ratings yet
Sewer Piping Systems Installation Guide PDF
33 pages
GIS-V8 2019 With Corrections 9-19 With Adoption Disclaimer
PDF
No ratings yet
GIS-V8 2019 With Corrections 9-19 With Adoption Disclaimer
12 pages
GRP Fire Fighting System
PDF
No ratings yet
GRP Fire Fighting System
1 page
C-051-VP-040-CLTW-SCH-0006 REV-1 Code-A With Minor Comments
PDF
No ratings yet
C-051-VP-040-CLTW-SCH-0006 REV-1 Code-A With Minor Comments
5 pages
Fire Hydrant2
PDF
No ratings yet
Fire Hydrant2
1 page
Plumbing Systems PDF
PDF
No ratings yet
Plumbing Systems PDF
92 pages
Pipelines: Types and Applications
PDF
100% (1)
Pipelines: Types and Applications
3 pages
Water Hammer Report
PDF
No ratings yet
Water Hammer Report
2 pages
Bypass and Drain Connections: MSS SP-454998
PDF
No ratings yet
Bypass and Drain Connections: MSS SP-454998
12 pages
Saudi Aramco Inspection Checklist: CP Accessories - Material Receiving SAIC-X-3002 CP
PDF
No ratings yet
Saudi Aramco Inspection Checklist: CP Accessories - Material Receiving SAIC-X-3002 CP
3 pages
AIGA 083 - 13 Disposal of Gases
PDF
No ratings yet
AIGA 083 - 13 Disposal of Gases
82 pages
BORplus Product Guide
PDF
No ratings yet
BORplus Product Guide
20 pages
211000-FireSprinklerandStandpipeSystems 508
PDF
No ratings yet
211000-FireSprinklerandStandpipeSystems 508
27 pages
P4-D3en - Tech. Specification For Line Pipes
PDF
No ratings yet
P4-D3en - Tech. Specification For Line Pipes
20 pages
Gravity Shutters
PDF
No ratings yet
Gravity Shutters
8 pages
Awwa C203 - 97
PDF
No ratings yet
Awwa C203 - 97
36 pages
Lightning Protection System
PDF
100% (1)
Lightning Protection System
5 pages
Industrial Standards Pipe Fittings
PDF
100% (1)
Industrial Standards Pipe Fittings
27 pages
Medical Gas Spec
PDF
No ratings yet
Medical Gas Spec
8 pages
Mini-Pak 6 MonoBlock III. Installation & Operation Manual
PDF
No ratings yet
Mini-Pak 6 MonoBlock III. Installation & Operation Manual
78 pages
Sansico Hdpe Pipes and Fittings Catalogue
PDF
No ratings yet
Sansico Hdpe Pipes and Fittings Catalogue
12 pages
Cleanouts Handout
PDF
No ratings yet
Cleanouts Handout
2 pages
Rainwater Systems: Overflowing With Helpful Ideas
PDF
No ratings yet
Rainwater Systems: Overflowing With Helpful Ideas
16 pages
Damper Manual - AMCA
PDF
No ratings yet
Damper Manual - AMCA
6 pages
Z1170 Engineered
PDF
No ratings yet
Z1170 Engineered
4 pages
02 Design Guide Warehouses Lores
PDF
No ratings yet
02 Design Guide Warehouses Lores
21 pages
Regulador 1253 B - American M.
PDF
100% (1)
Regulador 1253 B - American M.
8 pages
PPR Sizing Tables&Charts
PDF
No ratings yet
PPR Sizing Tables&Charts
22 pages
22 61 13 Compressed-Air Piping For Lab-HealthCare Facilities
PDF
No ratings yet
22 61 13 Compressed-Air Piping For Lab-HealthCare Facilities
16 pages
Technical Material For PMS - DCC N Enppi Form
PDF
No ratings yet
Technical Material For PMS - DCC N Enppi Form
43 pages
Engineering Report PDF
PDF
No ratings yet
Engineering Report PDF
22 pages
Aviation Ground Fuelling Solutions: WL-4354-01-AM (XXX), WL-5225-01-AM (XXX)
PDF
No ratings yet
Aviation Ground Fuelling Solutions: WL-4354-01-AM (XXX), WL-5225-01-AM (XXX)
4 pages
Installation Instructions: Plastic Pipe Industry Association
PDF
No ratings yet
Installation Instructions: Plastic Pipe Industry Association
27 pages
Adayyapi Hdpe Boru Doseme Sartnamesi
PDF
No ratings yet
Adayyapi Hdpe Boru Doseme Sartnamesi
10 pages
Pipeline Specs Form Us 0510
PDF
No ratings yet
Pipeline Specs Form Us 0510
3 pages
Pipe Crossing Ref - 00
PDF
No ratings yet
Pipe Crossing Ref - 00
3 pages
Specifications For Oil, Gas, Water, Sewer Pipes
PDF
No ratings yet
Specifications For Oil, Gas, Water, Sewer Pipes
3 pages
Spe 007
PDF
No ratings yet
Spe 007
1 page
Seamless Copper Tube, Bright Annealed: Standard Specification For
PDF
No ratings yet
Seamless Copper Tube, Bright Annealed: Standard Specification For
6 pages
OMJ-IPR-SRT-QA-2222-Final-AG FF Pipes Hydrostatic Testing Procedure
PDF
No ratings yet
OMJ-IPR-SRT-QA-2222-Final-AG FF Pipes Hydrostatic Testing Procedure
12 pages
MAR For Welding Consumables Material
PDF
No ratings yet
MAR For Welding Consumables Material
11 pages
Mechanicang and Equipment Erection Rev2 44
PDF
No ratings yet
Mechanicang and Equipment Erection Rev2 44
1 page
Piping Materials Guide
PDF
No ratings yet
Piping Materials Guide
4 pages
Condumax II Transportable 97149 RESPUR
PDF
No ratings yet
Condumax II Transportable 97149 RESPUR
4 pages
OMJ-MAN-SRT-QA-1961-Updated-FF AG Pipes. DYNAMIC EQUIPMENT ERECTION METHOD STATMENT
PDF
No ratings yet
OMJ-MAN-SRT-QA-1961-Updated-FF AG Pipes. DYNAMIC EQUIPMENT ERECTION METHOD STATMENT
19 pages
Biffi Hydraulic Actuators
PDF
100% (1)
Biffi Hydraulic Actuators
28 pages
Flash Guard QBS-0058
PDF
No ratings yet
Flash Guard QBS-0058
1 page
Seal Weld Activ 8
PDF
No ratings yet
Seal Weld Activ 8
23 pages
Pipeline Construction Works
PDF
100% (2)
Pipeline Construction Works
18 pages
GaScope Calibration Certificate
PDF
No ratings yet
GaScope Calibration Certificate
1 page
Cronos Current Interrupter User Manual - Version 10
PDF
No ratings yet
Cronos Current Interrupter User Manual - Version 10
51 pages
MS Cleaning of Pipe
PDF
No ratings yet
MS Cleaning of Pipe
3 pages