Kanban Steps
Kanban Steps
1. Control cycle
2. Supply area
First of all supply area will be created with storage location and responsible person.
Put storage location and responsible person and save the data.
Go to MMSC
Exclude the storage location from planning(as this is not required to plan through MRP). We can
exclude the storage location from customizing also. In this case all the material in the storage
location will be excluded for planning.
T code PK01
This can be done through control cycle maintenance also. T code PKMC. To create new click
on
Now check MD04 screen
Total stock is 63 and is excluded from MRP. This stock will be consumed in subsequent stage(in next
stage)
If Bins are made empty-Procurement proposal will be created (NOT GI WILL BE DONE)
In actual situation bins are being scanned through RF device and scanning is being done one the
Bins are empty or Full.
One KANBAN processed and Bin became RED. This means Bin is empty.
Now check MD04. One Production order created (as empty means one proposal will be created).
Make another Bin empty is same process and see MD04 screen.
Release both the order. The order type of KANBAN is PP05.
Double click on the Bin and you can see the details with order created.
PK31: Error in KANBAN can be checked. Select any error line and click on Bell. You can change the
error status.
PK09: KANBAN can be locked (when the KANBAN is not is used/Bin is damaged).