0% found this document useful (0 votes)
90 views1 page

Daily Summary Feb

This document is a workload summary for an aircraft maintenance schedule. It contains 4 sections: 1) routine daily tasks, 2) rectification of issues from previous inspections, 3) deferred items and open entries from previous maintenance events, and 4) a list of removed and installed components with part numbers. The summary was prepared by an engineer and verified by another to document the scheduled maintenance tasks.

Uploaded by

Billy Eres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views1 page

Daily Summary Feb

This document is a workload summary for an aircraft maintenance schedule. It contains 4 sections: 1) routine daily tasks, 2) rectification of issues from previous inspections, 3) deferred items and open entries from previous maintenance events, and 4) a list of removed and installed components with part numbers. The summary was prepared by an engineer and verified by another to document the scheduled maintenance tasks.

Uploaded by

Billy Eres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Applicability: ALL

WORKLOAD SUMMARY
TSD-PPC-F-014 Rev.02
December 2015

STATION DATE A/C TYPE A/C REG. NO

Workloads Description Lead Mech. Status/Remarks

1.a.ROUTINEDAILY
TASK (SCHEDULED MAINTENANCE, TECHNICAL PUBLICATION AND ROUTINE WORK ORDERS
CHECK

b.

c.

d.

e.

f.

g.

2. HIL / ADD / NRC RECTIFICATION

Deferred Item Description Rectification Requirement Lead Mech Status/Remarks

a.

b.

3. DEFERRED ITEMS/OPEN ENTRIES (MEL, CDL, ADD, CDD & NRC)


MR1 MR2/CFI/NRC Reason for Deferment /
Pilot/Cabin/Maintenance Entry Cat. Lead Mech
Seq. No. Seq. No. Part Required and PN

c.

d.

a.

4. UNIT/COMPONENT REMOVED AND INSTALLED


Posn. MR1
Component Description PN/SN OFF PN/SN ON Lead Mech
/ FIN Seq. No.
a.

b.

Prepared by: Checked and Verified by: PCC or Designee:

Engr. Reymart V. Barlos Engr. Valentin B. Rapa III


Planner Planner Signature over printed name / stamp/ date / AMO #
Date: FEB - 2017 Date: FEB - 2017

FORM NO. TSD-PPC-F-014 1 OF 1

You might also like