0% found this document useful (0 votes)
69 views

Design Iteration Increase

The document provides instructions for increasing the number of design iterations for an optimization run in HyperMesh product version 10.0 and above. By default, the number of iterations for an optimization setup is 30, but this may not be sufficient for some models to achieve converged results. The procedure outlined increases the number of iterations by accessing the optimization control panel, activating DesMax, and changing the default value of 30 to a higher number like 50.

Uploaded by

cen1510353
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

Design Iteration Increase

The document provides instructions for increasing the number of design iterations for an optimization run in HyperMesh product version 10.0 and above. By default, the number of iterations for an optimization setup is 30, but this may not be sufficient for some models to achieve converged results. The procedure outlined increases the number of iterations by accessing the optimization control panel, activating DesMax, and changing the default value of 30 to a higher number like 50.

Uploaded by

cen1510353
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Tip # -Increase number of Design Iterations

Product: HyperMesh
Product Version: 10.0 and above

Topic Objective
To increase number of design iterations for an Optimization run.

Topic Details
In OptiStruct, by default the number of iterations carried for an Optimization setup is 30. For few
models 30 iterations may not be sufficient to get a converged optimization results.

Follow the below procedure to increase the number of iterations for a optimization run:

Go to Analysis page and click on Optimization.


Click on opti control
Activate the DesMax=
By default the number in the field next to DesMax is 30
Give a number above 30 (say 50 to increase the no. iterations to 50)
Click return to exit the panel
You can see optimization control in the model browser.
The number of optimization iterations is increased to 50 from 30.

2012 Altair, Proprietary and Confidential Pg 1 INIT |24/07/2013 | RP

You might also like